Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02
2006/271
61. Noise from building works associated with residential development shall comply with the
following –
61.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
61.2. All reasonable measures are taken to minimise noise emissions.
61.3. Not permitted on Sunday or public holidays.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
0534.SK01A Basement Plan – prepared by Kidd + January 2006
Co
0534.SK02A Level 1 Plan – prepared by Kidd + Co January 2006
0534.SK03 Level 2 Plan – prepared by Kidd + Co January 2006
0534.SK04 Level 3 Plan – prepared by Kidd + Co January 2006
0534.SK05A Elevations 1 – prepared by Kidd + Co January 2006
0534.SK06A Elevations 2 – prepared by Kidd + Co January 2006
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $1,010 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2006 until the date of payment. An Infrastructure
Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act
1997.
2. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
3. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
4. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
4.1. On a Sunday or public holiday, at any time; or
Page 10 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - extension to relevant period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.