Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02
2006/271
6. All fencing, including the dividing wall/fence between the dwelling units private open space
areas at the rear of the site, shall not exceed a maximum height of 2 metres above natural
ground level.
7. A solid wall or fence, constructed to prevent water entry onto adjoining lots, at least 1.8m high
above finished ground level, is to be erected along the side and rear property boundaries with
the top of the wall or fence being at least 1 metre above the top of the coping of the pool.
8. The walls adjacent to the driveway leading into the basement car park shall have a maximum
height of 200mm above that of natural ground level.
9. The swimming pools and associated decks shall not project greater than 1 metre above
finished ground level.
10. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
11. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
12. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
13. The development shall not exceed a maximum height of 3 storeys and 12 metres above
natural and finished ground level.
14. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
15. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
16. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
17. The Development Permit for a material change of use of premises lapses if the use has not
happened by 24 August 2012, unless an application to extend the currency is approved by
Council.
18. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
19. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
the dwelling to the pool enclosure is not permitted.
Page 3 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - extension to relevant period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.