Original source · versioned page text
Appendix A - SDAP - State Code 16 - Native vegetation clearing response
Performance outcomes Acceptable outcomes Response
3. within 15 metres of the defining bank of a
watercourse or drainage feature that is a
stream order 3 or 4 watercourse or drainage
feature; and
4. within 20 metres of the defining bank of a
watercourse or drainage feature that is a
stream order 5 or more watercourse or
drainage feature.
AND
AO129.2 Root-absorbed broad spectrum
herbicides are not applied within whichever is the
greater distance from the defining bank of a
watercourse or drainage feature:
1. 100 metres; or
2. any distance specified on the approved product
label; or
3. the distance specified in the safety and use
conditions issued by the Australian Pesticides
and Veterinary Medicines Authority.
Soil erosion
PO130 Clearing does not result in accelerated soil AO130.1 Clearing only occurs where recognised
erosion within or outside the land subject of the best practice methods are employed to:
development application. 1. prevent soil erosion and instability resulting
from the clearing; and
2. stabilise soil erosion and instability which
would result from clearing; and
3. prevent increased sediment run-off entering a
wetland, watercourse or drainage feature as
a result of the clearing.
AND
AO130.2 Mechanical clearing does not occur in
any of the following areas:
1. within 50 metres of an area of soil erosion
and instability; and
2. slopes greater than five per cent.
State Development Assessment Provisions v3.0
State code 16: Native vegetation clearing Page 46 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original