Original source · versioned page text
5. Appendix B - Architectural Drawings
Very large file (74.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
PEDESTRIAN WALKWAY w/ AWNING STRUCTURE AND LOCATION OF MECHANICAL ELEMENTS (HVAC, SMOKE EXHAUST, ETC,)
POLYCARBONATE SKYLIGHT FEATURE INDICATIVE ONLY. REFER TO FUTURE DETAIL BY CONSULTANT
ONE WAY SERVICE AISLE TRANSFORMER PUMP HOUSE SPRINKLERS
2x HRV LOADING PROVISION MADE FOR SOLAR PANEL WATER TANK
INSTALLATION (SHOWN DASHED). TO FUTURE
DETAIL
3050
11.0
SITE BOUNDARY 10.5 SITE BOUNDARY
10.0
9.5 9.5 9.5
9.0
8.5 10.5
TOP OF BANK 8.5
9.0 10.0 10.0
9.5
9.0 9.0
BOTTOM OF BANK
RL 9.0
13355
9.5 9.0
8.5
14155
9.0
BUILDING 01 8.5
HRV - Heavy Rigid Vehicle
RL 8.5 PH
10.0
ST
le
Rigid Vehic
BOTTOM OF BANK
HRV - Heavy
20 S
9.
0
T AFF
P ARK
BOTT
IN G SP
OM O
TOP
RL 8.7 ACE
F
OF B
BANK
S
ANK
9.5
BO
8.0
TT
OM
OF
HRV - Heavy Rigid Vehicle
HRV - Heavy Rigid Vehicle
BA
7.5
NK
TO
P
OF
BA
NK
icle
y Rigid Veh
8.5
HRV - Heav
RL 6.5
7.0
SITE BOUNDARY
BUILDING 03
Rigid Vehi
Heav-yHeavy
HRV -HRV e cle
RigidclVehi
RL 9.5
11.0
BOTT
OM
10
OF B
8.0
8.0
.0
AN K
6.
7.5
5
BLDG 02 RL 8.0
9.
0
8.5
RL 8.8
9.5
7.0
10.5
7.
5
TOP
7.0
HRV - Heavy Rigid Vehicle
OF
BAN
K
8.0
TOP OF BANK
6.5
6.0
RL 6.0
7.5
BOTTOM OF BANK
BOTTOM OF BANK
6.0 TOP
8.
OF BAN
5
K
TOP OF BANK BOTTOM
OF BANK
6.5
6.0
7.0
6.5
TOP OF 6.0
6.5 BANK BOTTOM
6.5
OF BANK
6 .0
7.0
TOP OF
BANK
RL 8.8 BOTT
OM
OF B
A NK
7.0
TOP
6.0
ing
OF
BO
9.5
BAN
TTO
oad
10.5
6.5 8.
MO
K
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.