Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Reasons for Exemption EXE23 0040

of 2

Page text shows just the words. Original shows the document exactly as it was published.

               DEVELOPMENT ASSESSMENT REASONS FOR EXEMPTION

                Job no. 231061           Geotechnical Investigation for Proposed Pool – 5 16/11/2023
                                         Seamist Court, Sunshine Beach, prepared by Lindsay
                                         Consulting Pty Ltd

               Should the plans listed above be altered or amended, the advice included in this memo is no longer
               applicable.
               3.     COMMENTARY
               Council determined that the proposal was exempt for the following reasons:
               1.     The applicant provided a copy of a site specific Geotechnical Investigation demonstrating
                      compliance with the relevant Acceptable Outcomes and therefore the proposal should be
                      considered Accepted Development under Noosa Plan 2020.
               2.     The proposal complies with all other requirements of the Noosa Plan 2020.




                                                                                                    Page 2 of 2

Document Set ID: 22726929
Version: 3, Version Date: 22/12/2023
Log in to download the original file

Reasons for Exemption EXE23 0040.pdf · 94 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.