18 February 2022 The Planning Place 7 / 273 Abbotsford Road Bowen Hills QLD 4006 Attention: Nicholas Marshall Dear Nicolas, RE: 1179 LOUIS BAZZO DRIVE, COOTHARABA RESPONSE TO INFORMATION REQUEST INTRODUCTION This letter has been prepared by PTT, as requested by The Planning Place, in response to the traffic issues raised in SARA’s information request (Reference Number: 2107-23543 SRA), dated 16 September 2021, in relation to a proposed residential dwelling at 1179 Louis Bazzo Drive, Cootharaba. The traffic and transport engineering issues raised in SARA’s Information Request and addressed below include the following: Sight Distance Assessment Road Safety Assessment Turn Warrant Assessment EXISTING CONDITIONS Subject Site The subject site is formally identified as Lot 6 on RP204676, has an area of approximately 4 hectares and is currently vacant. According the Noosa Council (Council) Planning Scheme, the site is zoned as rural. The site is bounded to the north by the Cooloothin Creek, to the east by bushland, to the south by Louis Bazzo Drive and to the west by a residential property. Access to the subject site is currently provided via a single crossover from Louis Bazzo Drive, as shown in Figure 1. The surrounding area comprises primarily rural residential and environmental management and conservation uses. P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX PREPARED BY: BH 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 15 pages
Page 2
Figure 1: SUBJECT SITE
Subject Site
Existing Vehicular Access
Road Network
In the vicinity of the subject site, Louis Bazzo Drive is a two-lane undivided road with a posted speed limit
of 90km/h. The road forms part of the state-controlled network and falls under the jurisdiction of TMR.
Annual Average Daily Traffic (AADT) data from 2020 was obtained from TMR for Louis Bazzo Drive from
a nearby counter site (identification number 20043). The counter site is located approximately 850m west
of the subject site and recorded an AADT of 990 vehicles. The AADT data is summarised in Table 1 and
attached.
Table 1: TRAFFIC VOLUMES
ATTRIBUTE LOUIS BAZZO DRIVE
Peak Hour 11:30am – 12:30pm
Peak Hour Volume - Westbound 60vph
Peak Hour Volume - Eastbound 60vph
Peak Hour Volume 120vph
AADT 990vpd
P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 2
Page 3
PROPOSED DEVELOPMENT The proposed development involves a new residential dwelling at 1179 Louis Bazzo Drive. Access is proposed via the existing all-movements driveway. The proposed site layout is shown in Figure 2 and attached. Figure 2: PROPOSED DEVELOPMENT LAYOUT SIGHT DISTANCE Sight Distance Assessment A sight distance assessment was undertaken on Wednesday 6 October 2021 to determine the available sight distance at the proposed site access driveway. On-site observations indicate the available sight distance at the access driveway is approximately 230m to the east and in excess of 300m to the west, as shown in Figure 3. P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 3
Page 4
Figure 3: AVAILABLE SIGHT DISTANCE
View to the East View to the West
Sight Distance Requirements
Sight distance requirements for private access driveways are specified in Australian Standard AS2890.1
Parking Facilities Part 1: Off-Street Car Parking (AS2890.1). The proposed site access is for a private
driveway and accordingly the sight distance at the access has been assessed against AS2890.1.
Austroads Guide to Road Design Part 4A: Signalised and Unsignalised Intersections provides sight
distance requirements for intersections. Nevertheless, sight distance at the site access has also been
assessed in accordance with Austroads, as requested by SARA.
Australian Standards
On a 90km/h road (ie Louis Bazzo Drive), AS2890.1 requires a desirable sight distance of 125m. The
proposed access driveway achieves 230m sight distance to the east and in excess of 300m to the west.
Therefore, the access location complies with AS2890.1 for sight distance.
Austroads
Sight distance has also been assessed against Austroads Guide to Road Design Part 4A. According to
Austroads, sight distance criteria for intersections often cannot be obtained at property accesses on
roadways with tighter horizontal and vertical alignments, or vegetation. Accordingly, Austroads allows the
sight distance requirements for domestic driveways be determined using the extended design domain
(EDD). Therefore, the existing site access has been assessed according to EDD requirements.
Austroads sight distance requirements are determined based on the sum of driver observation and
reaction times. For T-intersections on two-lane two-way roads with traffic volumes of less than 4,000
vehicles per day (ie Louis Bazzo Drive), Austroads requires a driver observation time of 1.5 seconds for
safe intersection sight distance (SISD) under EDD. Furthermore, for sight distance at domestic accesses (ie
an access that services three or less domestic units), Austroads requires mandatory application of an
observation time 0.5 seconds less than specified by the EDD (ie Table A8). Austroads Guide to Road
Design Part 3: Geometric Design specifies a reaction time of two seconds for alerted driving situations in
rural areas.
P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 4
Page 5
The existing site access has been assessed in accordance with Austroads sight distance requirements for
the truck-day base case (ie truck operating in daylight hours) and the norm-day base case (ie normal car
driver travelling at 85th percentile speeds in daylight hours). Of the two cases, the truck-day base case is
generally the critical case.
Louis Bazzo Drive has a posted speed limit of 90km/h in the vicinity of the site. Austroads requires that a
design speed equal to the posted speed limit plus 10km/h (ie 100km/h) be used when calculating sight
distance requirements. Requirements for sight distance for the truck-day base case are outlined in
Austroads Guide to Road Design Part 4A Table A6 and A12 and summarised below using an observation
time 0.5 seconds less than specified in Table A8.
safe intersection sight distance of 219m for the truck-day base case based on a speed environment
of 100km/h (195m for the norm-day base base)
approach sight distance (ASD) of 191m for the truck-day base case based on a speed environment
of 100km/h (141m for the norm-day base case)
minimum gap sight distance (MGSD) of 139m, based on a critical acceptance gap of five seconds
for a vehicle undertaking a right turn manoeuvre in a 100km/h speed environment
The proposed domestic access driveway achieves 230m sight distance to the east and in excess of 300m
to the west. Therefore, the access driveway complies with Austroads EDD sight distance requirements at
domestic accesses.
ROAD SAFETY ASSESSMENT
Requirement
TMR’s Guide to Traffic Impact Assessment (2018) (GTIA) requires a risk assessment of the likelihood and
consequence of safety risks being increased on the state-controlled road network, due to the addition of
site accesses and development generated traffic, pedestrians or cyclists. A risk assessment has been
undertaken using the methodology prescribed in Section 9.3.2 of TMR’s GTIA, to assess the potential
impacts of the proposal on the safety of the state-controlled road network.
Methodology
The risks inherent on the existing state-controlled road network and associated with the addition of
development generated traffic were scored using the risk scoring matrix outlined in TMR’s GTIA, as
reproduced in Figure 4. In undertaking the risk assessment:
the likelihood of a crash was determined based on the number of similar crashes reported in the
historical crash data
the consequence of a crash was based on the Fatal and Serious Injury (FSI) Indexes reported in Part
4 of TMR’s Manual of Uniform Traffic Control Devices (MUTCD) for different crash types / DCA
Codes
P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 5
Page 6
Figure 4: SAFETY RISK SCORE MATRIX
Crash Data
Crash data has been sourced from TMR for the section of Louis Bazzo Drive 500m either side of the
proposed access location for the past five years (April 2016 – March 2021). The data indicates that no
crashes resulting in injury have occurred within the 1km section of Louis Bazzo Drive over the five-year
period, noting that TMR no longer collect data for crashes which only result in property damage.
Risks
Based on our review of the historic crash data on the state-controlled road network, we have identified
the following safety risks associated with the proposal:
an increase in left-turn traffic volumes may increase the risk of rear end crashes between left-turn
and through vehicles on the same approach (DCA Code 302)
an increase in right-turn traffic volumes may increase the risk of rear end crashes between right-
turn and through vehicles on the same approach (DCA Code 303)
an increase in right-turn traffic volumes may increase the risk of crashes between right-turn and
opposing through or left-turn vehicles (DCA Codes 202 and 203)
an increase in left / right turns out of the site driveway may increase the risk of crashes with through
traffic (DCA Code 406)
Risk Assessment
The results of the risk assessment are summarised in Table 2. As demonstrated, there are no existing
safety issues and the development is not expected to significantly worsen road safety on the state-
controlled road network. Accordingly, there are no unacceptable existing or development induced safety
risks and no management or mitigation measures have been identified.
P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 6
Page 7
Table 2: RISK ASSESSMENT
Without
With Development
Development
Consequence
Consequence
Likelihood
Likelihood
RISK ITEM
Risk
Risk
Increase in left-turn traffic volumes (rear
end crash with left-turning traffic: DCA - - - 1 1 L
Code 302)
Increase in right-turn traffic volumes (rear
end crash with right-turning traffic: DCA - - - 1 1 L
Code 303)
Increase in right-turn traffic volumes
(opposing approach right-turn / through - - - 1 2 L
crash: DCA Code 202)
Increase in right-turn traffic volumes
(opposing approach right-turn / left-turn - - - 1 2 L
crash: DCA Code 203)
Increase in left / right turns out of site
driveway (side-swipe crash upon exiting a - - - 1 1 L
driveway: DCA Code 406)
TURN WARRANT ASSESSMENT
Section C9.2 of Austroads’ Guide to Traffic Management Part 6: Intersections, Interchanges and
Crossings deals with the application of warrants for turn lanes. With respect to the use of these warrants,
Austroads states that they are based on the construction of new intersections on new roads (ie greenfield
sites) and:
“although not intended for direct application to accesses and driveways, they may be used as a
reference for such.”
This confirms that the warrants are primarily for the construction of intersections on new roads and
Austroads does not mandate the application of the warrants for turn lanes at site access driveways. This
guidance is also accepted by TMR’s Road Planning and Design Manual (RPDM). As such, we believe the
application of warrants for turn lanes is not required for the access driveway, because:
the access driveway is not an intersection
historic crash data indicates no evidence of a safety risk on the surrounding road network
traffic volumes using the access will be very low (ie one vehicle in the peak hour)
the addition of one vehicle on the access driveway during the peak hour is not expected to have a
significant adverse impact on the safety of the access or surrounding road network or a noticeable
impact on the operation of the surrounding road network
P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 7
Page 8
Therefore, given the forecast very low traffic volumes on the access driveway, the proposed development is not considered to warrant provision of turn lane treatments at the access driveway. CONCLUSIONS This report responds to the traffic engineering related issues raised in SARA’s Information Request in relation to the proposed residential dwelling located at 1179 Louis Bazzo Drive, Cootharaba. Based on the above, it is our view that the development layout addresses the issues raised in the Information Request and is expected to result in an appropriate traffic engineering solution. If you have any questions regarding the issues discussed above, please do not hesitate to contact us. Yours sincerely, James Gannon Principal Engineer (RPEQ 22233) P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX 8
Page 9
Kin Kin Junction Cootharaba
Traffic Analysis and Reporting System
AADT Segment Report TARS
Area 407 - North Coast District Road Section 1412 - BOREEN ROAD
24-Jun-2021 14:52 Road Segment from 4.270km to 13.640km Segment Site 20043 Traffic Year 2020 Data Collection Year 2020 Page 1 of 2 (1 of 7)
-26.288569
Ba
uis
Lo
o Dr
Bazz
Louis
Dr
z o
B az
uis
Lo
Bundaberg
Gin Gin
Mc
k
inn
on
Booyal
Dr
Dr
Hervey Bay Loui
sB
azzo
Dr
Biggenden Maryborough
o
zz
Ba
uis
Lo
Tiaro 20043
Rainbow Beach
Dr
Gunalda Ba
zz
o
uis
Lo
152.885997
152.975591
Goomeri Gympie
Dr
Mckinnon
Manumbar
Belli Park
Dr
o
zz
Nanango Jimna uis
Ba
Lo
Caloundra Cooloothin
Dr
on
Blackbutt
inn
Kilcoy
ck
M
Lo
uis
Ba
Beachmere zz
o
Dr
Crows Nest Dundas
r
oD
zz
Downsfield Ba
Mckinnon Dr
uis
Lo
Wolvi
Cooloola r
oD
zz
Beenam Range Lo
uis
Ba
Mckinnon Dr
Dawn Louis Bazzo Dr
Kin Kin
Tandur Boreen Point
Louis Baz
Ringtail Creek
zo Dr
Cooran Cooloothin
Amamoor
Sunshine Beach
Bergins Pocket Cooroy
Doonan
Ridgewood
Brooloo
Mc
Belli Park North Arm
kin
no
Coolum Beach
nD
r
Gheerulla Yandina Forest Acres
Copyright The State of Queensland 2009.
Copyright Pitney Bowes Softare Pty Ltd 2009 Based on [Dataset - State Digital Road Network (SDRN)] provided
Bli Bli with the permission of Pitney Bowes Softare Pty Ltd (current as of 12/08) and other state government datasets. -26.359075
Highworth
Cambroon
Mckinnon Dr
Flaxton Alexandra Headland
Landers Shoot
Page 10
Traffic Analysis and Reporting System
AADT Segment Report TARS
Area 407 - North Coast District Road Section 1412 - BOREEN ROAD
24-Jun-2021 14:52 Road Segment from 4.270km to 13.640km Segment Site 20043 Traffic Year 2020 Data Collection Year 2020 Page 2 of 2 (2 of 7)
Site 20043. Point 220000087. West
of Rd 1421-Tewantin Boreen Point Rd.
10.36 km
The width of each Road Segment is proportional to its AADT.
4.27 km 13.64 km
Start Point 220000088. End Point 220000089.
Rd 1412-Int Rd 1421 E/B.
This report shows Annual Average Daily Traffic
values (AADTs). Because the AADT values are All Vehicles (00)
converted to whole numbers, there will be
occasional inaccuracies due to rounding. G 482 100%
These inaccuracies are statistically insignificant. A 505 100%
B 987 100%
Light Vehicles (0A) Heavy Vehicles (0B)
G 436 90.46% G 46 9.54%
A 462 91.49% A 43 8.51%
B 898 90.98% B 89 9.02%
Short Vehicles (1A) Trucks and Buses (1B) Articulated Vehicles (1C) Road Trains (1D)
G 436 90.46% G 41 8.51% G 5 1.04% G 0 0%
A 462 91.49% A 38 7.52% A 5 0.99% A 0 0%
B 898 90.98% B 79 8.00% B 10 1.01% B 0 0%
Short 2-Axle Short Vehicles 2-Axle Trucks 3-Axle Trucks 4-Axle 3-Axle 4-Axle 5-Axle 6-Axle B Double (2J) Double Road Triple Road
Vehicles (2A) Towing (2B) and Buses (2C) and Buses (2D) Trucks (2E) Articulated (2F) Articulated (2G) Articulated (2H) Articulated (2I) Trains (2K) Trains (2L)
G 417 86.51% G 19 3.94% G 36 7.47% G 4 0.83% G 1 0.21% G 2 0.41% G 2 0.41% G 0 0% G 1 0.21% G 0 0% G 0 0% G 0 0%
A 441 87.33% A 21 4.16% A 34 6.73% A 3 0.59% A 1 0.20% A 2 0.40% A 2 0.40% A 0 0% A 1 0.20% A 0 0% A 0 0% A 0 0%
B 858 86.93% B 40 4.05% B 70 7.09% B 7 0.71% B 2 0.20% B 4 0.41% B 4 0.41% B 0 0% B 2 0.20% B 0 0% B 0 0% B 0 0%
Page 11
Traffic Analysis and Reporting System TARS
Report Notes for AADT Segment Report
24-Jun-2021 14:52 Page 1 of 1 (3 of 7)
AADT Segment Annual Volume Report Site
Provides summary data for the selected AADT Segment of a The physical location of a traffic counting device. Sites are
Road Section. Summary data is presented as both located at a specified Through Distance along a Road Section.
directional information and a combined bi-directional figure.
The data is then broken down by Traffic Class, when Site Description
available. The report also includes maps displaying the The description of the physical location of the traffic counting device.
location of both the AADT Segment and the traffic count site.
Start and End Point
Annual Average Daily Traffic (AADT) The unique identifier for the Through Distance along a Road Section.
Annual Average Daily Traffic (AADT) is the number of vehicles passing
a point on a road in a 24 hour period, averaged over a calendar year. Vehicle Class
Traffic is categorised as per the Austroads Vehicle Classification
AADT Segments scheme. Traffic classes are in the following hierarchical format:
The State declared road network is broken into Road Sections Volume or All Vehicles
and then further broken down into AADT Segments. An AADT 00 = 0A + 0B
Segment is a sub-section of the declared road network where
traffic volume is similar along the entire AADT Segment. Light Vehicles
0A = 1A
1A = 2A + 2B
Area
For administration purposes the Department of Transport and Heavy Vehicles
Main Roads has divided Queensland into 12 Districts. The Area 0B = 1B + 1C + 1D
field in TSDM reports displays the District Name and Number. 1B = 2C + 2D + 2E
1C = 2F + 2G + 2H + 2I
District Name District 1D = 2J + 2K + 2L
Central West District 401
Darling Downs District 402 The following classes are the categories
Far North District 403 for which data can be captured:
Fitzroy District 404 Volume
Mackay/Whitsunday District 405
Metropolitian District 406 00 All vehicles
North Coast District 407 2-Bin
North West District 409 0A Light vehicles
Northern District 408 0B Heavy vehicles
South Coast District 410
South West District 411 4-Bin
Wide Bay/Burnett District 412 1A Short vehicles
1B Truck or bus
AADT Values 1C Articulated vehicles
1D Road train
AADT values are displayed by direction of travel as:
G Traffic flow in gazettal direction
12-Bin
A Traffic flow against gazettal direction 2A Short 2 axle vehicles
B Traffic flow in both directions 2B Short vehicles towing
2C 2 axle truck or bus
2D 3 axle truck or bus
Data Collection Year 2E 4 axle truck
Is the most recent year that data was 2F 3 axle articulated vehicle
collected at the data collection site. 2G 4 axle articulated vehicle
2H 5 axle articulated vehicle
Please Note: 2I 6 axle articulated vehicle
Due to location and/or departmental policy, 2J B double
some sites are not counted every year. 2K Double road train
2L Triple road train
Gazettal Direction Copyright
Is the direction of the traffic flow. It can be easily recognised by Copyright The State of Queensland (Department of Transport and Main Roads) 2013
referring to the name of the road eg. Road Section: 10A Brisbane - Licence
Gympie denotes that the gazettal direction is from Brisbane to Gympie. http://creativecommons.org/licences/by-nd/3.0/au
This work is licensed under a Creative Commons Attribution 3.0 Australia (CC BY-ND) Licence. To
attribute this material, cite State of Queensland (Department of Transport and Main Roads) 2013
Maps
Display the selected location from a range of viewing
levels, the start and end position details for the AADT
Segment and the location of the traffic count site.
Road Section
Is the Gazetted road from which the traffic data is collected. Each
Road Section is given a code, allocated sequentially in Gazettal
Direction. Larger roads are broken down into sections and
identified by an ID code with a suffix for easier data collection and
reporting (eg. 10A, 10B, 10C). Road Sections are then broken
into AADT Segments which are determined by traffic volume.
Segment Site
Is the unique identifier for the traffic count site
representing the traffic flow within the AADT Segment.
Page 12
Traffic Analysis and Reporting System
Annual Volume Report TARS
d
Local R
Area 407 - North Coast District Road Section 1412 - BOREEN ROAD
24-Jun-2021 14:52 Site 20043 - 1412 - 600m West of Campbells Road TDist 10.360km Speed Limit 90 Page 1 of 3 (4 of 7)
zo Dr
-26.302061
Louis Baz
o Dr
Bazz
Louis
Local Rd
River Heads
Colton
Eurong
Maryborough
d
Local R
Mc
Boonooroo
Blackmount
kin
no
Tawan
nD
Bauple
r
Carlo Island
Miva
Anderleigh Freshwater
20043
Wonga Lower
152.954102
152.970703
r
Gympie Coondoo oD
azz
is B
Lou
Boreen Point
Amamoor
Cooroy Noosa
Belli Park
Coolum Beach
Yabba
Cambroon
Jimna Alexandra Headland
Cootharaba Gils
Boreen Point ons
Rd Dr
Gilsons
o
Rd
zz
Ba
uis
Lo
Cooloothin
r
oD
azz
isB
Lou
Copyright The State of Queensland 2009.
Copyright Pitney Bowes Softare Pty Ltd 2009 Based on [Dataset - State Digital Road Network (SDRN)] provided
with the permission of Pitney Bowes Softare Pty Ltd (current as of 12/08) and other state government datasets. -26.315126
Page 13
Traffic Analysis and Reporting System TARS
Annual Volume Report
24-Jun-2021 14:52 Page 2 of 3 (5 of 7)
Area 407 - North Coast District
Year 2020 Growth last Year -7.58%
Road Section 1412 - BOREEN ROAD
Site 20043 - 1412 - 600m West of Campbells Road AADT 987 Growth last 5 Yrs
Thru Dist 10.36 Avg Week Day 1,006 Growth last 10 Yrs 0.87%
Type C - Coverage Avg Weekend Day 977
Stream TB - Bi-directional traffic flow
AADT History
1,200 1,200
1,100 1,100
1,000 1,000
900 900
800 800
700 700
AADT
AADT
600 600
500 500
400 400
300 300
200 200
100 100
0 0
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
1-Year 5-Year 10-Year 1-Year 5-Year 10-Year
Year AADT Growth Growth Growth Year AADT Growth Growth Growth
2020 987 -7.58% 0.87% 2005 822 -9.27% 6.01% 4.75%
2019 1,068 17.23% 2.42% 2.39% 2004 906 26.89% 6.30%
2018 911 -9.53% -1.26% 0.55% 2003 714 -4.42% 3.88%
2017 1,007 -0.89% 2.36% 2002 747 14.57%
2016 1,016 3.20% 2.98% 2001 652 13.99%
2015 2000 572 0.60%
2014 965 5.23% 2.78% 2.18% 1999
2013 917 2.23% 1.90% 1998 623
2012 1997
2011 868 -4.19% 2.83% 1.92% 1996
2010 906 9.69% 3.89% 3.40% 1995 534 -6.32%
2009 826 2.10% 0.08% 1994 570
2008 809 4.52% 0.64% 2.57% 1993
2007 774 4.88% -0.08% 1992
2006 738 -10.22% 0.28% 1991
Hourly Averages
13.0 13.0
12.0 12.0
11.0 11.0
10.0 10.0
9.0 9.0
8.0 8.0
% AADT
% AADT
7.0 7.0
6.0 6.0
5.0 5.0
4.0 4.0
3.0 3.0
2.0 2.0
1.0 1.0
0.0 0.0
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
01-02
03-04
05-06
07-08
09-10
11-12
13-14
15-16
17-18
19-20
21-22
23-00
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Hours of the Week
[OCR of page images]
iS
Queensland Traffic Analysis and Reporting System
Government Annual Volume Report
24-Jun-2021 14:52
Area
Road Section
Site
Thru Dist
Type
Stream
1,200
1,100
1,000
900
800
700
5
g 600
500
400
300
200
100
0
B 8
Year
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
13.0
12.0
11.0
10.0
9.0
- 8.0
3 7.0
2 6.0
5.0
4.0
3.0
2.0
1.0
0.0
407 - North Coast District
1412 - BOREEN ROAD Moai 2020
20043 - 1412 - 600m West of Campbells Road AADT 987
10.36 Avg Week Day 1,006
C - Coverage Avg Weekend Day 977
TB - Bi-directional traffic flow
AADT History
83883 5 8 8 8SsegsgesesvpesespessvseezrEee?ge:E
222 22 2 2 8 &€§ &§ § &§ F§ &€§ &€ F&F K€ BAAS
1-Year 5-Year 10-Year 1-Year
AADT Growth Growth Growth Year AADT Growth
987 -7.58% 0.87% 2005 822 -9.27%
1,068 17.23% 2.42% 2.39% 2004 906 26.89%
911 -9.53% -1.26% 0.55% 2003 714 -4.42%
1,007 -0.89% 2.36% 2002 747 14.57%
1,016 3.20% 2.98% 2001 652 13.99%
2000 572
965 5.23% 2.78% 2.18% 1999
917 2.23% 1.90% 1998 623
1997
868 -4.19% 2.83% 1.92% 1996
906 9.69% 3.89% 3.40% 1995 534 -6.32%
826 2.10% 0.08% 1994 570
809 4.52% 0.64% 2.57% 1993
774 4.88% -0.08% 1992
738 -10.22% 0.28% 1991
Hourly Averages
Hours of the Week
Growth last Year
Growth last 5 Yrs
Growth last 10 Yrs 0.87%
2015,
2016
2017
5-Year
Growth
6.01%
3.88%
0.60%
2018
2019
10-Year
Growth
4.75%
6.30%
2020
TARS
Page 2 of 3 (5 of 7)
-7.58%
1,200
1,100
1,000
900
800
700
600
500
400
300
200
100
13.0
12.0
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
1.0
0.0
AADT
% AADT
Page 14
Traffic Analysis and Reporting System TARS
Annual Volume Report
24-Jun-2021 14:52 Page 3 of 3 (6 of 7)
Daily Averages
114 114
110 110
% AADT
% AADT
106 106
103 103
99 99
95 95
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Days of the Week
Weekly Averages
103.0 103.0
102.9 102.9
102.8 102.8
102.7 102.7
102.6 102.6
% AADT
% AADT
102.5 102.5
102.4 102.4
102.3 102.3
102.2 102.2
102.1 102.1
102.0 102.0
26-Dec - 01-Jan
02-Jan - 08-Jan
09-Jan - 15-Jan
16-Jan - 22-Jan
23-Jan - 29-Jan
30-Jan - 05-Feb
06-Feb - 12-Feb
13-Feb - 19-Feb
20-Feb - 26-Feb
27-Feb - 04-Mar
05-Mar - 11-Mar
12-Mar - 18-Mar
19-Mar - 25-Mar
26-Mar - 01-Apr
02-Apr - 08-Apr
09-Apr - 15-Apr
16-Apr - 22-Apr
23-Apr - 29-Apr
30-Apr - 06-May
07-May - 13-May
14-May - 20-May
21-May - 27-May
28-May - 03-Jun
04-Jun - 10-Jun
11-Jun - 17-Jun
18-Jun - 24-Jun
25-Jun - 01-Jul
02-Jul - 08-Jul
09-Jul - 15-Jul
16-Jul - 22-Jul
23-Jul - 29-Jul
30-Jul - 05-Aug
06-Aug - 12-Aug
13-Aug - 19-Aug
20-Aug - 26-Aug
27-Aug - 02-Sep
03-Sep - 09-Sep
10-Sep - 16-Sep
17-Sep - 23-Sep
24-Sep - 30-Sep
01-Oct - 07-Oct
08-Oct - 14-Oct
15-Oct - 21-Oct
22-Oct - 28-Oct
29-Oct - 04-Nov
05-Nov - 11-Nov
12-Nov - 18-Nov
19-Nov - 25-Nov
26-Nov - 02-Dec
03-Dec - 09-Dec
10-Dec - 16-Dec
17-Dec - 23-Dec
24-Dec - 30-Dec
2020 Calendar
January February March April
M T W T F S S M T W T F S S M T W T F S S M T W T F S S
1 2 3 4 5 1 2 30 31 1 1 2 3 4 5
6 7 8 9 10 11 12 3 4 5 6 7 8 9 2 3 4 5 6 7 8 6 7 8 9 10 11 12
13 14 15 16 17 18 19 10 11 12 13 14 15 16 9 10 11 12 13 14 15 13 14 15 16 17 18 19
20 21 22 23 24 25 26 17 18 19 20 21 22 23 16 17 18 19 20 21 22 20 21 22 23 24 25 26
27 28 29 30 31 24 25 26 27 28 29 23 24 25 26 27 28 29 27 28 29 30
May June July August
M T W T F S S M T W T F S S M T W T F S S M T W T F S S
1 2 3 1 2 3 4 5 6 7 1 2 3 4 5 31 1 2
4 5 6 7 8 9 10 8 9 10 11 12 13 14 6 7 8 9 10 11 12 3 4 5 6 7 8 9
11 12 13 14 15 16 17 15 16 17 18 19 20 21 13 14 15 16 17 18 19 10 11 12 13 14 15 16
18 19 20 21 22 23 24 22 23 24 25 26 27 28 20 21 22 23 24 25 26 17 18 19 20 21 22 23
25 26 27 28 29 30 31 29 30 27 28 29 30 31 24 25 26 27 28 29 30
September October November December
M T W T F S S M T W T F S S M T W T F S S M T W T F S S
1 2 3 4 5 6 1 2 3 4 30 1 1 2 3 4 5 6
7 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8 7 8 9 10 11 12 13
14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 15 14 15 16 17 18 19 20
21 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 22 21 22 23 24 25 26 27
28 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29 28 29 30 31
Days on which traffic data was collected.
[OCR of page images]
iS
Queensland
Government
24-Jun-2021 14:52
103.0
102.9
102.8
102.7
102.6
% AADT
102.5
102.4
102.3
102.2
102.1
102.0
3)
20
27
1
18
25
14
21
28
14
21
28
12
19
26
o =4
a
29
01-Jan
- 08-Jan
- 15-Jan
- 22-Jan
- 29-Jan
- 05-Feb
26-Dec -
02-Jan
09-Jan
16-Jan
23-Jan
30-Jan
January
oats
a
29
w
6
13
20
27
TOF
2 3
9 10
16 17
23 24
30 31
May
oan
7
14
21 22
28 29
a
September
w
2
9
16
23
30
TOF
3° 4
10 11
17° 18
24 25
114
Traffic Analysis and Reporting System
Annual Volume Report
Daily Averages
110
% AADT
12-Feb
19-Feb
06-Feb -
13-Feb
s
4
1
18
25
one
oy
30
12
19
26
95
106
103
99
[
[
114
110
106
103
99
95,
s
5
12
19
26
10
17
24
31
Mon
10
17
24
owe
a
29
12
19
26
1
18
25
ona
roy
30
‘le!
20
27
Tue
February
w
5
12
19
26
10
17
24
t
13
20
27
June
1
18
25
F
14
21
28
12
19
26
October
w
14
21
28
t
1
8
15
22
29
ont
oy
30
Wed
Days of the Week
Fri
Weekly Averages
- 03-Jun
- 10-Jun
- 17-Jun
>
z
2
e
&
c
5
2
+
S
<
5
?
2020
o-0
a
22
29
o
20
27
s
3
10
17
24
31
one
oy
No
21
28
13
20
27
M
30
2
9
16
23
14
21
28
)
10
17
24
- 05-Aug
30-Jul
Sat
335
= BO
ass
33358
sttto
8e2aks
March
wot F
4 5 6
11. 12 13
18 19 20
25 26 27
July
wot F
1 2 3
8 9 10
15 16 17
22 23 24
29 30 31
November
wot F
4 5 6
11.12 «13
18 19 20
25 26 27
Days on which traffic data was collected.
16-Sep
10-Sep -
17-Sep
24-Sep
- 23-Sep
- 30-Sep
- 07-Oct
= 14-Oct
- 21-Oct
- 28-Oct
- 04-Nov
7
14
21
28
1
18
25
14
21
28
Sun
01-Oct
08-Oct
o-0
a
29
12
19
o 7-0
a
29
15-Oct
22-Oct
29-Oct
13
20
27
31
10
17
24
14
21
28
>
3
2
3
8
% AADT
3g
<
a
1
18
o a4
22
29
- 25-Nov
- 02-Dec
- 09-Dec
19-Nov
26-Nov
03-Dec
ows
a
29
w
5
12
19
26
TARS
Page 3 of 3 (6 of 7)
16-Dec
- 23-Dec
30-Dec
10-Dec -
17-Dec
24-Dec -
December
w
2
9
16
23
30
Tt
3
10
17
24
31
F
4
11
18
25
103.0
102.9
102.8
102.7
102.6
102.5
% AADT
102.4
102.3
102.2
102.1
102.0
s os
11 12
18 19
25 26
o-oo
ono
a
oy
29 30
12 13
19 20
26 27
Page 15
Traffic Analysis and Reporting System TARS
Report Notes for Annual Volume Report
24-Jun-2021 14:52 Page 1 of 1 (7 of 7)
Annual Volume Report Growth Percentage
Displays AADT history with hourly, daily and weekly Represents the increase or decrease in AADT, using a
patterns by Stream in addition to annual data for AADT exponential fit over the previous 1, 5 or 10 year period.
figures with 1 year, 5 year and 10 year growth rates.
Hour, Day & Week Averages
Annual Average Daily Traffic (AADT) The amount of traffic on the road network will vary depending
Annual Average Daily Traffic (AADT) is the number of vehicles passing on the time of day, the day of the week and the week of the
a point on a road in a 24 hour period, averaged over a calendar year. year. The ebb and flow of traffic travelling through a site over
a period of time forms a pattern. The Hour, Day and Week
AADT History Averages are then used in the calculation of AADT.
Displays the years when traffic data was collected at this count site.
Road Section
Area Is the Gazetted road from which the traffic data is collected. Each
For administration purposes the Department of Transport and Road Section is given a code, allocated sequentially in Gazettal
Main Roads has divided Queensland into 12 Districts. The Area Direction. Larger roads are broken down into sections and
field in TSDM reports displays the District Name and Number. identified by an ID code with a suffix for easier data collection and
District Name District reporting (eg. 10A, 10B, 10C). Road Sections are then broken
into AADT Segments which are determined by traffic volume.
Central West District 401
Darling Downs District 402
Far North District 403 Site
Fitzroy District 404 The unique identifier and description of the physical
Mackay/Whitsunday District 405 location of a traffic counting device. Sites are
Metropolitian District 406 located at a Through Distance along a Road Section.
North Coast District 407
North West District 409
Northern District 408 Stream
South Coast District 410 The lane in which the traffic is travelling in. This report
South West District 411 provides data for the combined flow of traffic in both directions.
Wide Bay/Burnett District 412
Thru Dist or TDist
Avg Week Day The distance from the beginning of the Road Section, in kilometres.
Average daily traffic volume during the week days, Monday to Friday.
Type
Avg Weekend Day There are two types of traffic counting sites, Permanent
Average daily traffic volume during and Coverage. Permanent means the traffic counting
the weekend, Saturday and Sunday. device is in place 24/7. Coverage means the traffic
counting device is in place for a specified period of time.
Calendar
Days on which traffic data was collected are highlighted in green. Year
Is the current year for the report. Where an AADT Year record
Gazettal Direction is missing a traffic count has not been conducted, for that year.
The Gazettal Direction is the direction of the traffic flow. Copyright
It can be easily recognised by referring to the name of the Copyright The State of Queensland (Department of Transport and Main Roads) 2013
road eg. Road Section: 10A Brisbane - Gympie denotes Licence
that the gazettal direction is from Brisbane to Gympie. http://creativecommons.org/licences/by-nd/3.0/au
G Traffic flowing in Gazettal Direction This work is licensed under a Creative Commons Attribution 3.0 Australia (CC BY-ND) Licence. To
A Traffic flowing against Gazettal Direction attribute this material, cite State of Queensland (Department of Transport and Main Roads) 2013
B The combined traffic flow in both Directions
Page 16
ALLOWABLE NUMBER AND WIDTH OF RESIDENTIAL DRIVEWAYS
RP DATA
KERB AND CHANNEL KERB TAPER ALTERNATIVE DRIVEWAY EDGE
DRIVEWAY EDGE SPECIAL CONDITIONS
ALLOWABLE MAX W1 W2 W3 APPLICABLE
TYPE DESCRIPTION
LOT NUMBER: 6
PROPERTY BOUNDARY
No. OF (WIDTH AT KERB INVERT) (MAX WIDTH
1000
MIN
CROSSOVERS
RP 204676
(INCLUDES 500mm AT PROPERTY
RP / SP NUMBER:
(ALL DRIVEWAYS SUBJECT TO
BOTH SIDES.) (VARIES) BOUNDARY) RELEVANT COUNCIL APPROVAL)
2 DOUBLE GARAGE 1 5.0m 3.0m - 5.0m 5.0m LOCALITY: COOTHARABA
500
PC GROUP OR MORE
LOCAL GOV'T: NOOSA SHIRE
PROPERTY BOUNDARY
APPROVAL
KERB INVERT
AREA: 40090 m2
W1
W2
W3
REFER SECTION A + B ON
SITE COVER: 0.56 %
DRAWING NUMBER RS-050
500
COOL
500 MAX VERTICAL
TRANSITION LENGTH
OOTH
259° 2 0
EXISTING PATH TO BE SAW
33.96
CUT AND REMOVED PRIOR
TO CROSSING CONSTRUCTION
IN CR
8' 00"
SAWCUT TO ALLOW CLEAN REMOVAL EXISTING FUTURE CONCRETE PATH
OF BACK OF KERB AND CHANNEL REFER NOTE 23 ON RS-050
350° 31' 30"
328.570
EEK
SETOUT REQUIREMENTS
PERIMTER OF CLEARED AREA (ARROWS)
APPROXIMATELY 3000 SQM (EXC. 500 SQM DFP). 21
7°
TO BE REHABILITATED TO BUSHFIRE 44 07'
.8 30
DR MANAGEMENT STANDARD AS OUTLINED IN 90 "
BY IVEWA BUSHFIRE MANAGEMENT PLAN.
PR
EV Y CLE
IOU
S O ARED
WN
ER HSTP ALFRESCO
POSITION TO BE DETERMINED 18.42 m²
BY ENGINEER.
C
CR
OO
DWELLING
EE
KL
L
IN
E
OO
153.79
-F
RO
T
M
m²
M
HIN
AP
PI
NG
RE C
EK
37
°
14 49'
GARAGE
9. 00
11 "
0
37.57 m²
OVERLAYS
ACOUSTICS ______________
PORCH
WATER TANKS 4.99 m²
X MIN. 29
FIRE (BAL) ________________ 500 SQM DFP APPROX. TOTAL
50,000L
2 AREA PLAN
COO
X CREEKLINE & COOLOOTHIN CREEK
FLOOD ___________________
FIRE FIGHTING 200 1 : 250
LOO
X ENDANGERED ECOSYSTEM
BIODIVERSITY _____________ WATER RESERVE
APPROX. 10,000L
THIN
LANDSLIDE _______________
CREEKLINE
CRE
- FROM MAPP
ING
X AGRICULTURAL LAND
E
KOALA HABITAT
CONSERVATION AREA ______ 01° 25' 00"
K
262.021
WIND RATING
N1
SITE
N2 1 1 : 1000
NOTES:
CRUSHER DUST BASE ON GROUND FOR WATER TANKS. GUTTERGUARD IS TO BE INSTALLED ON ALL GUTTERS AND VALLEYS.
N3
TO BE A CONNECTION FOR DRINKING WATER FILTRATION SYSTEM
OTHER ___________ ON WATER TANK/S.
HAND HELD FIRE FIGHTING EQUIPMENT TO BE SUPPLIED BY OWNER.
SOIL TEST
BRICKWORK TO INCLUDE STAINLESS STEEL WEEPGUARD IN ALL
_________________________________ WEEPHOLES (BUNNINGS - CODE: 1070494).
COPYRIGHT RIVERSIDE DRAFTING & DESIGN. REVISION DATE INIT REVISION DATE INIT PROPOSED DRAWN BY: CHECKED BY: DATE:
ALL RIGHTS RESERVED.
C CONSTRUCT. 28/01/22 ZJP
ZJP DJS 28/01/22
THE INFORMATION CONTAINED IN THIS
DOCUMENT IS SUBJECT TO THE TERMS AND
CLIENT/S TO SIGN NEW DWELLING FOR BEN COLES
CONDITIONS OF THE AGREEMENT OR
CONTRACT UNDER WHICH THE DOCUMENT WAS
SUPPLIED TO THE RECIPIENT'S ORGANISATION. ADDRESS SCALE: PROJECT STATUS:
NONE OF THE INFORMATION CONTAINED IN THIS
ABN: 88652597807 ___________________
CONSTRUCTION
DOCUMANT AND NO PART OF THIS DOCUMENT
N
SHALL BE:
A) DISCLOSED OUTSIDE THE RECIPIENT'S OWN
L: 1148216
1179 (LOT 6) LOUIS BAZZO DRIVE, COOTHARABA, QLD, 4565 AS INDICATED
ORGANISATION
B) REPRODUCED OR TRANSMITTED IN ANY WAY 13 MORAYFIELD ROAD,
OR STORED IN CABOOLTURE SOUTH, QLD, 4510 ___________________ DRAWING DRAWING No. SHEET No. REVISION
ANY RETRIEVAL SYSTEM, WITHOUT THE PRIOR
SITE PLAN 22-001-A 100 C
WRITTEN PERMISSION OF RIVERSIDE DRAFTING P: 07 5495 2340
& DESIGN. E: [email protected]