                              Steeline Roofin Spot Sunshine Coast                               Quotation
                              ABN:     78 010 637 877                   Phone: (07) 5326 3832
                                                                                                No:    318555
                              Address: 17 Fishermans Road               Lic No: 1023400
                                       Kuluin QLD 4558                                          Date: 13/08/2021
                              Email:   [email protected]                                    Valid: 7 Days
                              Web:     www.shedquotes.com.au


Michelle Huntley-Walker
64 Reserve St
Pomona QLD 4568
M: 0433772511

I would like to submit the following quotation for your proposed new steel building.

Building Specifications
Building Length:           10.00m
Building Width:            7.00m
Wall Height:               3.00m
Roof Pitch:                15.0°
Roof Sheeting:             Steelclad 0.42 BMT - Colour: To Be Advised
Wall Sheeting:             Steelclad 0.42 BMT - Colour: To Be Advised
Vermin Proofing:           Included on all sheeted building edges
Roller-Doors:              2 x Series "A" Windlocked Roller-Door (2600 x 2650) - Colour (To Be Advised)
P/A Doors:                 1 x Personal Access Door (2040 x 820) - Colour (To Be Advised)

Construction Costs
1.    Certification Fee - S/C CARPORT 54m2 to 99m2
2.    Delivery Sheds 61 to 150 M2
3.    Special Price Discount
4.    QBCC up to $30000

Quotation Amount
This quotation is for supply of the building kit, erection and concrete slab.
Quotation Amount including GST:                 $ 27,500.00

Conditions
1.    Earthworks, fill & or plant hire, unless specified are not included in quote.
2.    If no power is on site, generator hire fees will apply.
3.    Roller doors sizes are approximate only & may be less than actual
4.    Downpipes are finished at ground level only,additional plumbing by owner
5.    Final payment is on completion of build NOT on final certification/inspection

If you wish to proceed with ordering this building, please sign and return the attached Terms and
Conditions page with your deposit to the above address. You will also need to have your final
colours selected at this time. Colours cannot be changed once the building is ordered.

Please phone me for any further details or information. I trust this quotation meets with your approval and
look forward to assisting with your project.

Regards
Daryl Portbury




Produced by ShedTech                                                                                  Page 1 of 3
Log in to download the original file

Michelle Huntley-Walker 7x10.pdf · 195 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

                            Steeline Roofin Spot Sunshine Coast                      Quotation
                            ABN:     78 010 637 877          Phone: (07) 5326 3832
                                                                                     No:    318555
                            Address: 17 Fishermans Road      Lic No: 1023400
                                     Kuluin QLD 4558                                 Date: 13/08/2021
                            Email:   [email protected]                           Valid: 7 Days
                            Web:     www.shedquotes.com.au




        15°




                                                    3.94m
3.00m




                          7.00m
                       FRONT VIEW                                            REAR VIEW




                      10.00m
                  FRONT ELEVATION




                                                                             PLAN VIEW




                  REAR ELEVATION




Produced by ShedTech                                                                      Page 2 of 3

Page 3

                                 Steeline Roofin Spot Sunshine Coast                                     Quotation
                                 ABN:     78 010 637 877                     Phone: (07) 5326 3832
                                                                                                         No:    318555
                                 Address: 17 Fishermans Road                 Lic No: 1023400
                                          Kuluin QLD 4558                                                Date: 13/08/2021
                                 Email:   [email protected]                                          Valid: 7 Days
                                 Web:     www.shedquotes.com.au




Specifications Summary

Wind Design Speed
Wind Region                                     Region: B, Terrain Category: 2.11, Importance Level: 2
Wind Multipliers                                Md: 0.95, Mz: 0.90, Ms: 1.00, Mt: 1.08
Design Speed                                    52.91 m/s

Portal Frames
End Portal Frame (Front)                        C15019
End Portal Frame (Back)                         C15015
Internal Portal Frame                           C15019
Knee Braces                                     No
Apex Braces                                     No
* End portal frames are upgraded to internal frames for unsheeted bays or where dominant openings cover 50% of the bay.


Roof Purlins
Purlin Type                                     TopHat 64mm 1.00 BMT
Purlin Spacing                                  1166mm

Wall Girts
Wall Girt                                       TopHat 64mm 1.00 BMT
Girt Spacing                                    1275mm

Bays
Bay Count                                       4
Bay Sizes                                       2.50m, 2.50m, 2.50m, 2.50m

Rain Goods
Gutter                                          Squareline Gutter - Colour: To Be Advised
Down Pipe                                       090 PVC Stormwater Pipe @ 6m
Barge Cap                                       Compact Barge - Colour: To Be Advised
Ridge Cap                                       Type 120 Ridge Cap 15 deg 0.55 - Colour: To Be Advised

* ShedTech and/or the consulting engineer reserve the right to alter any nominated engineering specification without further notice.




Produced by ShedTech                                                                                              Page 3 of 3

Page 4

                                              Terms and Conditions of Quotation and Sale

1.    PAYMENT                                                                           council/town planning (relaxation) approvals are required by the
(a)   The Owner shall pay a deposit at the time of placing this Order.                  Local Council.
(b)   A Works Contract setting out progress payments is required to be            (f)   The owner is responsible for supplying a plan of the site with the
      signed prior to Construction.                                                     position of the proposed structure and all service amenities,
(c)   Construction will not commence until all progress payments as stated              easements and boundary lines clearly indicated. The Owner is
      have been made.                                                                   responsible to ensure that all boundary lines or easements are clearly
(d)   Payment for “kit only” purchase (i.e. without installation) must be               marked at the site location. The Contractor and/or its subcontractors
      made in full prior to manufacture.                                                will not be held responsible for the incorrect location of the structure
(e)   Account customers as per normal trading terms.                                    if boundary lines have not been correctly marked or for damage to
2.    DELIVERY                                                                          any service which has not been shown on the site plan.
(a)   The Owner will at his own expense provide or cause to be provided           (g)   The Owner warrants that he/she is entitled to build upon the site and
      full and clear access to the delivery site. It is the driver’s discretion         that if in the event that he/she shall not be the sole owner of the site,
      as to whether or not to enter the delivery site. If the site is not               he/she has complete absolute authority to act on behalf of all the
      accessible and delivery needs to be rescheduled then the Owner will               owner/s thereof. The Owner agrees to give the Contractor and/or its
      be liable for any additional delivery costs.                                      subcontractor’s full access to the site for the full period of the
(b)   Unless the Owner has notified the Contractor, the materials will be               contract.
      delivered and unloaded in the location considered appropriate to            (h)   The Contractor and/or its subcontractors will ensure downpipes are
      effectively fill the order. Any additional cost incurred by the carrier           taken to the bottom of the wall sheeting/columns only. The Owner is
      manhandling materials due to the Owners specific location                         responsible for discharge of roof water to Council requirements and
      requirements or if any additional mechanic assistance is required to              obtaining the Final Building Approval Certificate from the relevant
      unload the materials (eg crane etc) shall be paid for by the Owner.               Council.
(c)   The Owner is responsible for checking that all materials have been          (i)   The Contractor and/or its subcontractors reserve the right to touch up
      received and in good order, and the Owner will be deemed to have                  small scratches and dents.
      accepted the materials unless a claim of short supply, faulty or            (j)   The Owner is responsible for removing all excess waste materials
      incorrect materials is made in writing by the Owner within 7 days                 from the site.
      from pick up or delivery.                                                   5.    GENERAL
(d)   The Owner is responsible for any damage or loss of the materials            (a)   This Owner acknowledges that this structure has not been not
      once delivered to site.                                                           designed for occupation or as a place of residence.
3.    OWNERSHIP OF MATERIALS                                                      (b)   It is the Owners responsibility to check with appropriate authorities
(a)   Ownership of the materials does not pass to the Owner until all                   regarding the wind region, terrain category, topography and shielding
      amounts due and owing are paid in full to the Contractor.                         factors for the specific site conditions. The structure quoted has been
(b)   Unless payment for the materials is made to the Contractor by due                 designed to the wind category stated in the Quotation.
      date, the Contractor or its agents or employees, may at any time enter      (c)   Dimensions stated on plans are nominal only. Minor variations in
      onto the site where the materials are stored and remove the materials.            measurements from those shown shall not give rise to any claim for
(c)   The Owner must indemnify the Contractor in respect of any claims,                 damages or breach of Agreement
      losses, costs or damages that the Contractor may incur as a result of       (d)   The Owner warrants that he has carried out his own inquiries and
      the Contractor taking action under Clause 3(b).                                   investigations as to adequacy or suitability of the structure for the
(d)   Until the Owner has paid for the materials, the Owner must not use,               purpose for which the Owner intends to use the structure and the
      sell, lease, dispose, assign or encumber the materials (by mortgage,              Owner has not relied on the Contractor or the Contractor’s
      lien, charge or otherwise) without the consent of the Contractor and              employees, agents or distributors in determining the adequacy or
      the Owner must store the materials separately in a readily identifiable           suitability of the structure for the Owner’s purposes.
      state.                                                                      (e)   All dates given are estimates only. While every endeavour will be
4.    ERECTION                                                                          made, no guarantee will be given by the Contractor to deliver
(a)   Unless otherwise noted, the Quotation has been prepared SITE                      materials or complete contract on the date/s nominated. No
      UNSEEN from the information supplied by the Owner.                                responsibility will be accepted by the Contractor for any costs or
(b)   It is the Owners responsibility to provide power and water to the site.           consequential expenses to the owner arising in delays in respect to
      If power to site is not available then the Owner authorises the                   supply and/or erection of goods sold.
      Contractor to utilise a generator and the Owner agrees to a variation       (f)   All materials supplied will be of similar quality and quantity as those
      to the Contract in relation to the additional cost incurred by the                used in the Contractor’s display centres. However, the Contractor
      Contractor.                                                                       reserves the right to alter designs, plans and specifications at any time
(c)   The Owner must provide a clear and accessible site for the structure,             without notice.
      clear of vegetation or obstructions and including a minimum of 1.5m         (g)   This quotation is subject to managements final discretion and it could
      level clear space around the perimeter of the proposed structure for              be amended to reflect any price rises or falls, errors or emissions..
      ladders and or scaffolding. The cost of any site works are not              6.    COOLING OFF PERIOD
      included whatsoever, nor does it include the removal of building            (a)   The Owner may withdraw from the Contract with five (5) business
      waste from site. These costs are the sole responsibility of the Owner.            days after receiving a signed copy of the Contract. The Owner must
(d)   The concrete slab price is based on a level site which is rock and                give written notice to the Contractor.
      vegetation free with access and therefore does NOT include fill,            (b)   The cancellation of, or any variance to this order must be made in
      pump hire or any unforseen expenses which may arise. The slab price               writing and accepted by the Contractor in order to be binding upon
      is based on M soil conditions as per our standard engineering designs             the parties hereto. As the materials for each structure are made as
      and does not allow for unstable or reactive soil conditions. It is the            required, any orders cancelled after ordering of materials will not be
      Owners responsibility to provide any soil tests if required and pay               refunded and/or any moneys outstanding will become immediately
      any additional charges incurred in relation to the Slab.                          due and payable. If the Owner withdraws from the Contract under
(e)   If standard Council/Certifier fees are included in the Quotation, the             this Clause, the Contractor must return the deposit to the Owner less
      Contractor will act on behalf of the Owner and apply for and pay for              $100 and any out of pocket expenses incurred by the Contractor to
      the fees for the building approval required in relation to the structure.         the date the Contractor received the Owners notice. If the Owner has
      The Owner will be responsible for any additional costs should the                 not paid the Deposit, the amount of $100 plus any out of pocket
      Local Council require any changes to the building or if additional                expenses incurred by the Contractor is deemed to be a debt payable
                                                                                        from the Owner to the Contractor.

      I hereby confirm the details contained in Quotation No. …………………..………. dated ………….…….……………
                            and agree to the above Terms and Conditions of Quotation and Sale.

Owners Name ………………………….……….. Signature ………………….…………………………Date …..……..……

Owners Name ………………………….……… Signature ………………..…….…………………… Date ..….………….

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.