Original source · versioned page text
Amended Plans (17.01.20)
Plans and drawings: the text below has words only, no drawings.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
1120
1670
Note: Mixer
Mixer 475 600
500 Mixer Wall hung vanity
Niche
1200 Mirror
2400 Tiles
2400 Tiles
400 Splash
Towel rail
Mirror
Spout/mixer
Mixer
Niche
300
750 Spout/mixer
Bench
Bath
Bath
1200
1100
1000
800
750
550
550
150mm skirt tiles
920 150 1200 1120 to WC 1400 1070 920
3390 Screen
950 3390
BATHROOM ELEVATION 1 - VILLA 1 WC Bath 295
BATH/WC ELEVATION 3 - VILLA 1
Note: Wall hung vanity Mixer
Shower head centred
Note: Spout centred
to bath
600 Tile Splash
Shw
screen
2400 Tiles
Bench
Towel rail
Mixer
2400 Tiles
Spout / mixer
800 Bench
1000 Towel rail
900
WM
Taps inside
1100
1000
cupboard
Bath
Note: 150mm Skirting tiles to Laundry walls
750
550
500 1010 900 1094 666
1760 720
2410
313 1775 322
2480
BATHROOM ELEVATION 2 - VILLA 1 2410
LAUNDRY ELEVATION - VILLA 1
BATH ELEVATION 4 - VILLA 1
FOR CONSTRUCTION
No. Description Date Tracy Dowden - Building Designer Client: Richard & Jodie Thomas
15 Prelim WD's Rev 1 28/10/19 Cabinetry Elevations 2 - Villa 1
9/01/2020 3:39:18 PM
16 Prelim WD's Rev 2 6/11/19 QBCC: 1009413 Description Proposed duplex
17 For Construction WD's 11/11/19 Project number 5VEN
18
19
For Construction WD's Rev 1
For Construction WD's Rev 2
12/12/19
16/12/19
Site Address: 5 Ventura St
Sunrise Beach Qld
Date 22/4/19 A127
Drawn by T.D
20 For Construction WD's Rev 3 19/12/19
QBCC Lic 1184982 21 For Construction WD's Rev 4 9/1/20 Checked by T.D Scale 1 : 50
THIS DESIGN REMAINS THE COPYRIGHT OF THE DESIGNER.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original