Original source · versioned page text
Amended Plans (17.01.20)
Plans and drawings: the text below has words only, no drawings.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
1420
Mixer Note: Wall hung
vanity Spout centred
500 Mixer
to bath
Mirror
1200
2400 Tiles
2400 Tiles
Mirror
400 Splash
Spout/mixer
750 Spout/mixer
1000 Towel rail
Bench
Bath
Bath
800
750
550
550
920 1000 1100 357 1775 358
2490
3020
BATH ELEVATION 2 - VILLA 2
BATH ELEVATION 1 - VILLA 2
1175 630
Mixer Note: Wall hung
Towel rail
vanity
620 600
Niche Shower head
centred
Shw
screen
2400 Tiles
2400 Tiles
Towel rail
Niche
Mixer
300
Spout
1100 Mixer
Bench
Bath
1200
1100
1000
800
750
1420 680 920 550 500 990 1000
Screen
3020 2490
BATH ELEVATION 3 - VILLA 2 BATH ELEVATION 4 - VILLA 2
FOR CONSTRUCTION
No. Description Date Tracy Dowden - Building Designer Client: Richard & Jodie Thomas
15 Prelim WD's Rev 1 28/10/19 Cabinetry elevations 5 - Villa 2
9/01/2020 3:39:21 PM
16 Prelim WD's Rev 2 6/11/19 QBCC: 1009413 Description Proposed duplex
17 For Construction WD's 11/11/19 Project number 5VEN
18
19
For Construction WD's Rev 1
For Construction WD's Rev 2
12/12/19
16/12/19
Site Address: 5 Ventura St
Sunrise Beach Qld
Date 22/4/19 A130
Drawn by T.D
20 For Construction WD's Rev 3 19/12/19
QBCC Lic 1184982 21 For Construction WD's Rev 4 9/1/20 Checked by T.D Scale 1 : 50
THIS DESIGN REMAINS THE COPYRIGHT OF THE DESIGNER.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original