Original source · versioned page text
Amended Plans (17.01.20)
Plans and drawings: the text below has words only, no drawings.
Original PDF page 33, section 1. The text section number identifies this passage in the reader.
Note: Wall hung
vanity
480
Mixer location
Note: Wall hung vanity TBC
Splash
575
Bench
300 Splash
600
800 Bench
800 Bench
TR
900
WM taps
inside
cupboard
150mm skirt tiles
150mm skirt tiles
150mm skirt tiles
360 900 650 1150
900 900
1260 1800
1800
POWDER G.F.L ELEVATION 1 - VILLA 2 POWDER G.F.L ELEVATION 2 - VILLA 2 LAUNDRY ELEVATION - VILLA 2
Note: Wall hung vanity
Mixer position TBC on site
480 Note: Wall hung 1450
vanity
Mixer TBC
200 Splash
Bench
Bench
TR
900
900
150mm skirt tiles 150mm skirt tiles
930 350 920 900
1280
1820
FOR CONSTRUCTION POWDER F.F.L ELEVATION 1 - VILLA 2 POWDER F.F.L ELEVATION 2 - VILLA 2
No. Description Date Tracy Dowden - Building Designer Client: Richard & Jodie Thomas
15 Prelim WD's Rev 1 28/10/19 Cabinetry Elevations 7 - Villa 2
9/01/2020 3:39:21 PM
16 Prelim WD's Rev 2 6/11/19 QBCC: 1009413 Description Proposed duplex
17 For Construction WD's 11/11/19 Project number 5VEN
18
19
For Construction WD's Rev 1
For Construction WD's Rev 2
12/12/19
16/12/19
Site Address: 5 Ventura St
Sunrise Beach Qld
Date 22/4/19 A132
Drawn by T.D
20 For Construction WD's Rev 3 19/12/19
QBCC Lic 1184982 21 For Construction WD's Rev 4 9/1/20 Checked by T.D Scale 1 : 50
THIS DESIGN REMAINS THE COPYRIGHT OF THE DESIGNER.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original