Council archive · source document
17 Webb Road Client Instruction Letter · 132002.220527.1
Attached to the e-mail 132002.220527.1 Change to Existing Approval Engineering & Geo tech reports (1of 6 emails).
MA & MJ CHARLTON PO BOX 320 NOOSA HEADS QLD 4567 PH: 5447 3765 FAX: 5474 9139 E: [email protected] PCA Architects Attention: Peter Conley Dear Peter RE: 17 WEBB ROAD SUNSHINE BEACH RENOVATION DESIGN Thankyou for calling in to discuss our renovation. We want to. stress that the water problem is foremost in our desire to renovate the property, and we really want you to address the issue of solving that problem first and foremost in your design. During the last very “wet” period early this year, we had the worst water we have experienced since being in this house, when it seeped constantly through the walls on the lower level for about 3 days, and | was occupied wholly with mopping and wringing. We experienced damage to rugs, books, furniture, walls and stairs. This is not the first time we have experienced such damage, but it is the worst. We did try to have the damage repaired by a local builder - however the damage has managed to rear its ugly head again - and | am ready to tear the house down! We have paint bubbles and plaster deterioration, along with rust and tarnish, reappearing. Not to mention the deterioration of outside walls! Our attitude now is that we must solve the water problem before all else - to this end, we would like to remove the lower bedrooms and bathrooms while leaving the living, kitchen, study and gymnasium areas where they are - after fixing up the water problems and reinstating the building works of course! We do realise that as almost all of our house is seaward of the current building line, having been built well before its establishment, we do not want to risk losing the privilege of location on our block — but the water problem is so dire that we are prepared to accept the loss of the bedrooms and bathrooms downstairs if necessary to attend to fixing that problem. We confirm our instructions to you to gather consultant information for a lodgement to Department of Environment and Resource Management as you see fit, and instruct you to commence works to pursue this aim, including obtaining fee estimates from engineering and certification agencies. We look forward to seeing your concepts Kind regards Margie and Murray Charlton
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
17 WEBB ROAD CLIENT INSTRUCTION LETTER.pdfRelated documentApplication case desk ↗
About this file
- File size
- 584 KB (small file)
- File type
No other editions are linked here.