Site 569 =m? NOTE:
: j dD ‘A Roof 277 m2 DEPENDING ON GROUND CONDITIONS AND IF
| S : REACTIVE SOIL IS FOUND ALL PENETRATIONS
: : : Drivewa 84 m? , B
2 if y , VERTICAL AND HORIZONTAL SHALL BE DRAWING SCHEDU LE
Landscape 284 om PROVIDED WITH SWIVEL JOINTS AND
New impervious 361m? EXPANSION JOINTS. ALL SUBSURFACE DRAINS 3190-1 COVER SHEET
REQUIRE EXPANSION JOINTS AT 10m SPACING.
CATCHMENT AREAS 3190-2 STORMWATER DRAINAGE PLAN
STREET ADDRESS: NOTE:
THE NEW IMPERVIOUS AREA IS COMPARED TO THE 3190-3 STORMWATER CALCULATIONS
GREENFIELD SITE.
48 ELANDA STREET COMPARED TO THE PREVIOUS BUILDING THE NEW 3190-4 | EROSION & SEDIMENT CONTROL PLAN (ESC)
IMPERVIOUS CATCHMENT AREA SHALL BE UNDER
4 120sqm. 3190-5 | ESC NOTES
SUNSHINE BEACH
REAL PROPERTY DESCRIPTION:
m
CLIENT NAME: _
|
G & B CONNAN | ©
5
|
o E
159 | ge m = 2.
RP48112 | gis
CP . 2 — ©
BUP9902 © 493
38 ELANDA ST 3 Here ogy
_ oo \_ ot =
_ oS %\ — oe
DAVID LOW WAY ee SO Ze \ — =
/ 54,68: —— - —- = — 52:16 52:29 52.29. -~ 51.86 51.51 a a) }
ELANDA ST 51.36151.59 52.20 52.23 3T98 51.95 * 51.848 >50.93 nm
._52.00_° Fad SC
yo”. seen aca ‘ ~\
S17 y ‘ — \ = 7 ~
0 J iN qi = => LILLIA] =
us L ‘ u ) [- XD 7 i
135 si 30 4) (ea UNIT2 iy AN
PACIFIC AV RP48112 51.30 S&S ==] . SS a bs | / \, @
£26 [Je eh L|___le A | 54.51 ROOF PLAN
(eee ~ 7 ' = :
Poe Se Tee 0°
ye _f3q unit ee \
| / [ae ) >. LN oe
51.35; 185 . =
! ( ™
WILDFLOWER ST | — , ~
\ ™~
\
51.76/ ! 7 52.14 s
32.34 $2.82 >
aL ST
CP
BUP5193
{Nr |
m
SIGNED BY THE PRINCIPAL AND
SENIOR DESIGN ENGINEER
DR.-ING. REINHOLD KOENNING
LOCALITY MAP RPEQ7023
SCALE: NTIS.) MSC, PHD, MEAUST, AHSCA
DATE AS PER TITLE BLOCK
SITE PLAN & EXISITNG SERVICES
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
LEGEND GENERAL NOTES WATER SUPPLY Amd Description Date
Ron Water 3 Diameter 1. DO NOT SCALE FROM THESE DRAWINGS. 1. WATER SUPPLY DIAMETERS ARE NOTED IN "ID" UNLESS NOTED OTHERWISE
Existing Water tos.  Cleanoat to surface 2. DONOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. 2, PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE
s Existing Sewer CJ Capped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO (POLYETHYLENE) OR COPPER U.N.O.
Existing Storm water cv Conrol valve CONSTRUCTION. 3. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE 215. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK|
HD Existing House drain cs Cleaners. sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR.
Sanitary Drainage Se gold Water panel CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES.
—sw—— __ Grey Water Bev Double check walve 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 5, UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER
TTT TT fant oe Een Eccentric Enlarger STAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). CONCRETE SLAB MAY BE POLYPIPE CLASS PN20. ONE SIZE LARGER THAN SHOWN.
oo = Foe ater Elev Dge Evevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED.
Storm Water Drainage Fo Foleo ceiling 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. 7. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN
Lone e eee Eire FH Fire Hydrant 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD COMMON AREAS ONLY.
Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE meus Noles Dale
FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION
Rain Water Ri or Eodure units tor t REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval
ee ain Water Riser GP Gully pt 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. For Building Approval x 26-10-16
Ce) @) ° Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender
@)— Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction
Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. As Constructed
Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT
@) 5 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS
@) ° Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS & FRAMES.
Fduct Vent iL invert Level 1. COVERS SUBJECT TO VEHICULAR TRAFFIC TO BE 2535 CAST IRON, MEDIUM DUTY U.N.O.
®) ; io inspection opening 2. COVERS IN GRASSED OR CONC. AREAS TO BE 535 CAST IRON, CONCRETE INFILL LIGHT DUTY.
@) eae en ios Inspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. H d li us
© Hot Water niser Kec yore He Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. y FAUHC 3:
yY. Fire Dropper NRV Nene urn valve 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE.
Fire Riser PB Path box 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE "COESPRENE" OR HDPE. \-
PLV Pressure limiting valve 4. UNDERGROUND SHALL BE VITREOUS CLAY OR HDPE. - Rel +A MliEAust AHISCA
Vv Valve PO Planter outiet 5. TRADE WASTE PIPEWORK TO OIL SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH'NITRILE” RUBBER RINGS. GRATINGS . . contact: Reinhold Koenning MicAus
he Hose Cock Ree Real propery Sn 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. GRATINGS FOR STORM WATER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551
RPZD Reduce Pressure Zone device BRASS CAPS, SEALED AND SCREWED. 9 ERENOH CRATE TO BE SNANSVERSE BAR ermal [email protected]
een Eccentric Enlarger RWO Rai ti tlet - - PH: (07) 5491 4333
en Enlarger RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS CLIENT
SD Sanitary Drainage STORMWATER DRAINAGE
SL Surface Level ” TINRERCPROIINN PIPEV
1. UNDERGROUND PIPEWORK SHALL BE @100 PVC CLASS SW MIN GRADE 1:100 U.N.O. G & B CONNAN
. Si Si on
ore Overflow Relief Gully s/t Sate Tray 2. DOWNPIPES SHALL BE @100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE
Io we Water Swo Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 5 ALL AYDRANT PIPEWORK 19 BE DEN TMIED IN ACCORDANCE With AST 346 6.8. ARCHITECT :
t/td Trapped Tundish REQUIRED. . .
Closet % Test gate “nes 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. y M DESIGN J
sk Sink td » Tundish grate tronsverse bar 5. POLLUTION CONTROL MANAGEMENT SHALL COMPLY WITH THE RELEVANT STATE GOVERNMENT AND LOCAL POLCY 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE /proJect: 38 ELANDA STREET \
LT Laundry Tub Tat Trench grate longitudinal bar 6. WEDONOT SUPPORT NOR DO WE SPECIFY FRONT HIGH GUTTERS TO BE USED FOR EAVES GUTTER SYSTEMS. HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL. SUNSHINE BEACH
Ge aundry Tu TMV. Thermostatic. mbang. valve IF THE OWNER/DEVELOPER/BUILDER OPTS FOR FRONT HIGH GUTTERS THE FULL LIABILITY MOVES TO WHO EVER MADE THAT 5. EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP DUPLEX
Washing Vv Tempering valve DECISION AND CONSTRUCTION HYDRAULIC WILL NOT BE LIABLE FOR ANY FAILURE OF THE ROOF DRAINAGE SYSTEMS AT ANY TIME IN APPLIANCE HAS ACCESS.
fol wm Machine u/g Underground FUTURE 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE:
u/s Under slab , AFIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER
S FWG Floor Waste Cully uno, Unless noted otherwise IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING.
a Bn Basin orer supply 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE if
AUTHORITY PUMP APPLIANCE HAS ACCESS.
C_)} sth Both Shr Shower 8. MATERIALS: <@100 CLASS 16 POLY / TYPE B COPPER IN GROUND. COVER SHEET )
TYPE B COPPER ABOVE GROUND.
. C) HWS Hot water system >/=@100 CLASS 18 BLUE BRUTE IN GROUND.
EL FHR Fire Hose Reel FIRELITE ILG / TYPE B COPPER RISER/S
La «= ME_—s Water Meter CS Cleaners Sk 9. DO NOT USE GALVANISED FOR UNDERGROUND PIPE WORK.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Design| RK. | checked | ae [Date 28-10-16 | Dwg. No. AMD.
SCALE: 1 : 200 ON At UNo.| 1 of 5 3190-1 J
RPD:— LOT 158 RP 48112

 

 
Full text of the other 4 pages

Page 2

 

 

CP

BUP9902

159

RP48112

PROVIDE 450X600 GRATED TRANSFER
CHAMBER AND DISCHARGE VIA Soff
100 TO KERB&CHANNEL. REFER
DETAIL FOR KERB CONNECTION

100 FROM ROOF DRAINAGE
JOIN ALL DOWN PIPES OF UNIT 2
TO THIS DRAINAGE LINE AND
DISCHARGE TO KERB&CHANNEL

 

135

RP48112

 

 

 

INGROUND

PROPOSED
POOL

 

 

 

LULL LE

 

f ia iy

XA. 100uPVC

Q20 FLOW=9.8L/sec

 

 

 

 

SSS

 

 

NOTE: /
NO_ INFILTRATION MEASURES

 

ARE PROPOSED FOR THIS /

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rT” DEVELOPMENT

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ ~~
\ 6100uPVC

 

 

 

 

 

 

 

 

 

 

Serer ceeeeeeeeeerrerr

 

 

preereeery

 

 

/

/ NX
_/ Q20 FLOW=9.8L/se

 

 

  
 

 

 

       

 

  

CP

- L
ee es
| rs E 7 T TT 5 2
a N Et
77 UNIT 1 St
— Se /
' /
, : /

 

  
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Amd Description Date
in
m
m1 Issue Notes Date
For Development Approval
For Building Approval x 28-10-16
For Tender
p>
|§ For Construction
2000min o§ As Constructed
x ,o
Hot Dip Galvanised Kerb ra
adaptor to match kerb
profile 8
J | <
(Py 7 r .
leh
—_ U U Hydraulic 3:
125 x 75 x 6mm Galvanised Notes: . Y~ >
MS section 1. UFVC ‘pipe to be 100mm heavy duty DWV contact: Reinhold Koenning MicAust AHSCA
class
. . PO Box 181
. sage 2. All steel works to be hot dip galvanised 4 2
Connection ‘itting 3. All joints on PVC pipe to be sealed with Moffat Beach, QLD, 4551 RPEQ# 7023
reter Detal solvent weld cement (type N or P), or emar [email protected]
75min — 75min rubber ring joint. PH: (07) 5491 4333
A I CLIENT :
. | G & B CONNAN
VILLE
L Fitting for connection of #100 ARCHITECT :
cs IS uPVC pipe to 125 x 75 x 6mm
€ lS. MS section \ M DESIGN y,
06
5 | (Prosect: 38 ELANDA STREET >
SECTION A - A SUNSHINE BEACH
Hot dip MS connection DUPLEX
A fitting or approved equivalent.
pipes to sealed with silicone or DRAWING TITLE:
DETAIL A mortar into fittings.
TYPICAL CROSS SECTION OF STORMWATER TO KERB STORMWATER il
NOT TO SCALE DRAINAGE PLAN )
Design RH, Checked | Ch [Date 28—10—16 | Dwg, No. AMD,
\ Scale: 1: 100 ON At UNo.| 2 of 5 3190-2 J
RPD:— LOT 158 RP 48112

 

         
   
    
    

 
   

 

\g:00 FROM ROOF DRAINAGE
JOIN ALL DOWN PIPES OF UNIT 1
TO THIS DRAINAGE LINE AND
DISCHARGE TO KERB&CHANNEL

 

 

 

 

 

 

» BF lM
| A
Slo
SiN
n  ‘S|\® —
»
| & 49.30
I 49.16 M
Xe
B
50.55 |<<
,
2s
L >
oO :
IL49.510
\ | opt we
= = = SS SS 4h 49 51 OQ.
| | 49.68
Soff 100 TO
KERB & CHANNEL
AS PER DETAIL
— 3 92
49,80
49.95
||
dis
Tee
PROVIDE 150 WIDE LIENAL \ <- 4t
DRAINAGE CHANNEL WITH | Be. —N
TRAFFICABLE, HEAVY DUTY, \ *O, Da
—~ CLASS D GRATE AND DISCHARGE P a
VIA 6100 TO TRANSFER CHAMBER Ss
m D
3 cr
Ro
@
A =
° ®
1

 

 

 

 

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED

SIGNED BY THE PRINCIPAL AND
SENIOR DESIGN ENGINEER
DR.-ING. REINHOLD KOENNING
RPEQ7023

MSC, PHD, MEAUST, AHSCA

DATE AS PER TITLE BLOCK

FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 3

 

 

 

51.3

51.30

  
 
 

am ree ao =

x9 1.50

 

mH =m: fi PRR RGREoe
“= 53°20 5175 51.95 * 51.848. -50.93
eo \ \
va a. amt ° \ . Oo
/ , ay NL
.91.78 “ % a . ) . \ A
% SS *S 4
eo \ ‘ DD
. y
% \. Q100=18L/sec Gf
52 20% NS NN. 151
. % a 51.90 RI.
/ ee ‘“ XS
2, _ ;
»91.99 % oN _

Q100=19L/sec

 

 

 

 

STREETVIEW PRIOR TO DEMOLITION
COURTESY OF GOOGLE

THIS “SKETCH SHOWS THE RUNOFF
CONFIGURATION OF THE GREENFIELD
SITE PRIOR TO ANY DEVELOPMENT

Q100=48L/sec

 
 

NOTE:
PRE—DEVELOPMENT CONFIGURATION

WAS A SINGLE RESIDENTIAL DWELLING
WITH ESTIMATED 200sqm ROOF AND
SEALED IMPERVIOUS AREA. THE
DIRECTION OF OVERLAND FLOW
SHOWN INDICATIVE ONLY.

IS

 

NOTE:
THIS SKETCH SHOWS THE RUNOFF
CONFIGURATION OF THE DEVELOPED
SITE BEFORE DEMOLITION

 

 

 

isapmgnnanadiiiitnmnnny

    
    
 
   
 
  

  
   
 

50.55

 

      

49.66
49.51
49.68

ABHND 8 Gay

 

 

}
150.44
50.59

49.30
49.16

49.66
49.51
49.68

JOYND ¥ quay

 

 

 

INTENSITY FREQUENCY DURATION TABLE
LOCATION SUNSHINE BEACH QUEENSLAND

AVERAGE RECURRENCE

INTERVAL

 

DURATION 1YR

2YR

SYR

10YR

20YR

SOYR

100YR

 

Smin 130

165

202

223

253

291

319

 

10min 100

127

156

173

196

226

249

 

30min 60

76

95

105

119

138

152

 

60min 41

52 65 72

106

82 96

 

 

 

 

 

 

 

 

 

 

 

 

 

600.0
500.0
400.0

300.0

200.0 :
150.0 P=

100.0 |--—— ~¢
80.0 mE

60.0
50.0

40.0
30.0

20.0

 

NY ARID WO

RAINFALL INTENSITY IN MILLIMETERS PER HOUR
Oo 000000

1.0
0.8

0.6

 

100 YEARS —
SO YEARS
20 YEARS
10 YEARS
5 YEARS
2 YEARS

 

1 YEARS

 

0.4

 

- ar
— <r

 

 

0.3
Sm6m10m

STORMWATER CALCULATIONS:

AREA OF UNDEVELOPED SITE:
Q100 INTENSITY:

TIME OF CONCENTRATION:
RUOFF COEFFICIENT:

20m 30m

thr 2hr = Shr 6hr 12hr 24hr

DURATION IN HOURS OR MINUTES

DESIGN RAINFALL INTENSITY CHART

 

LOCATION SUNSHINE BEACH

PRE DEVELOPMENT RUNOFF CONFIGURATION

569sqm
326mm/hr
Smin

0.88

THEREFORE PEAK RUNOFF PRE DEVELOPMENT:

45L/sec

POST DEVELOPMENT RUNOFF CONFIGURATION:

NEW IMPERVIOUS AREA:
POST DEVELOPMENT Q100 FLOW:

361sqm
48L/sec

ROOF CATCHMENT AREA OF PROPOSED HOUSE:
Q20 DESIGN FLOW OF EXSITING ROOF TO KERB:
Q10 DESIGN FLOW HARDSTAND TO KERB:

277sqm
19L/sec
3.5L/sec

TOTAL TO KERB: 22.5L/sec

REMAINING RUNOFF TO DOWNSTREAM PROPERTY:
Q100
44L/sec MINUS Q20 FROM ROOF TO KERB

REMAINING POST DEVELOPMENT, Q100 RUNOFF: 22.5L/sec < 45L/sec

48hr

72hr

SIGNED BY THE PRINCIPAL AND
SENIOR DESIGN ENGINEER
DR.-ING. REINHOLD KOENNING
RPEQ7023

MSC, PHD, MEAUST, AHSCA

DATE AS PER TITLE BLOCK

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

[Amd Description

Date

 

 

 

 

 

 

 

 

 

 

 

 

Issue Notes

Date

 

For Development Approval

 

For Building Approval x

28-10-16

 

For Tender

 

For Construction

 

 

 

As Constructed

 

 

E Hydraulic 3:

 

\-

PO Box 181

Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333

contact: Reinhold Koenning MigAust AHSCA

RPEQ# 7023

 

CLIENT :
G & B CONNAN

 

ARCHITECT :
iS M DESIGN

(PROJECT: 38 ELANDA STREET
SUNSHINE BEACH
DUPLEX

A

 

DRAWING TITLE:

STORMWATER
CALCULATIONS AND
OVERLAND FLOW

iy

‘/

 

Design | RK. Checked Cro Date
{SCALE #1

28-10-16
3 of 5

 

: 100 ON At U.N.O.

 

 

Dwg, No.

3190-3

AMD.

 

 

 

RPD:— LOT 158 RP 48112

 

 

Page 4

 

 

135

RP48112

CP

BUP9902

51.36

51.30
51.35 |
51.76,

 

 
 

 

 

F42 Fabric to AS1304

Desturbed area

Up
Mo, 80g
Oy,

NO
Of

 

600max

 

159

RP48112

  
  
 

BUP5193

Fix to top of stake with
shadecloth fastener or

[* to steel picket

Geotextile Fabric rT
and F42 oN

    
 

picket 1200min long

  

Overflow

Backfill

EDIMENT FENCE DETAIL

 

 

 

 

} Geotextile fabric

LA
~~ posts or steel pickets

driven 600mm into ground

 

 

 

 

 

100min vertical overlap of fabric

Undisturbed area

50x50 HW stake or steel

Om
a

200NOM

 

Geotextile fabric, Zz

Bidum U34 or similar.
— a a.
Runoff from pad

directed to sediment
trap

 

 

 

 

 

 

 

 

am

 

---- 5 : ~~ 51.86 51.51
52.20 52.22 «22.00 «51.849 50 03,,
—— 3 SS LS wT
yo. - ™
ZL ON
yy \, N\,
. \. \
“ \. iN
PERIMETER SEDIMENT FENCE. »
REAER DETAIL. .
/ N .
, \ i
\. \
NS \,
\ 51.90 1-51
_—
52.51 52.14 .
252.840.000.000 5B “52.82. ~

 

   
 

 

 

 

cS
>) aa
er
ot < Berm (300mm min height)
a 0
& <oo®
ae Cy
ce
oF
Ree”
ee?

TEMPORARY CONSTRUCTION ENTRY/EXIT
SEDIMENT TRAP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ it | 49.92
NI oro? TEMPORARY CONSTRUCTION
1] ENTRY/EXIT SEDIMENT TRAP.
Bo REFER DETAIL.
|e %,
“ee A
N Qe
Te
Mey
6 »
@
N, > =P
\ Re
\. \ \\ 2 SIGNED BY THE PRINCIPAL AND
\ \ a= => SENIOR DESIGN ENGINEER
\ 51 2 \\ @ Reeves OP KOENNING
~ 51.38 \ . 1, \ MSC, PHD, MEAUST, AHSCA
5 SZ: ». | te DATE AS PER TITLE BLOCK
77 ) ©
— 1 | \ DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
ee | 511.63 | 450.44 FOR ASSESSMENT, TENDERING ANP CONSTRUCTION.
_- 50 . 5 9 [Amd Description Date
in ©
on
Issue Notes Date
For Development Approval
For Building Approval x 28-10-16
For Tender
For Construction
As Constructed
E Hydraulic 3:
~ . .
contact: Reinhold Koenning MigAust AHSCA
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333
CLIENT :
G & B CONNAN
ARCHITECT :
LL M DESIGN J
(Prosect: 38 ELANDA STREET »

SUNSHINE BEACH
DUPLEX

 

DRAWING TITLE:

a

 

 

 

 

Design| RK. | checked | Cro [Date 28-10-16 | Dwg. No.
SCALE: 1 : 100 on A1 u.n.o.| 4 of 5 3190-4 A

AMD.

 

 

 

RPD:— LOT 158 RP 48112

 

 

Page 5

 

 

a

SEDIMENT & EROSION CONTROL NOTES

 

Erosion and sediment control devices shall be installed and maintained in
accordance with these drawings unless an alternative proposal is approved in
writing by the superintendent. Additional erosion and sediment controls shall
also be installed as necessary during construction.

All erosion and sedimentation control devices shall be installed prior to
stripping topsoil or commencing earthworks anywhere else on site unless
otherwise approved by the superintendent. An inspection hold point is
required at this point prior to the works proceeding.

Where erosion and sediment control devices cannot be installed due to
earthworks or other work operations, they shall be installed at the earliest
possible date.

Permanent coverage of disturbed areas with topsoil and turf, hydromulch or
mulch (and jute matting if required) is to be undertaken at the earliest
practical time.

Turf shall be laid behind kerb and channel for full verge width.

In order to prevent erosion from concentrated flow paths, the contractor shall
follow the following site protection principles:

- Install turf in permanent open drain;

- Install geofabric in temporary open drains where shown on drawing;

- Install sand bags, rock check dams or mulch bunds at 20m centres in all
concentrated flow paths including cut-off drains along kerb and channel,
along sediment fences, mulch or earth bunds except where drains are lined
with turf or geofabric.

All disturbed areas shall be covered with 100mm of topsoil prior to turfing,
seeding, hydromulching or mulching.

All batters 1 on 4 and steeper shall be tined to a depth of 200mm in
accordance with Main Roads specifications prior to topsoiling and mulching
(75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute
matting installed over the mulch. all other disturbed areas shall be covered
with hydromulch.

9.

10.

11.

12.

13.

14

15,

The underground drainage system shall be used to convey runoff throughout
construction. All drainage pits shall be constructed prior to placement of
sub-base material and shall contain a suitable cut-out to capture run-off from
base of boxing during construction.
The underground drainage system including all pits, pipes and GPT shall be
cleaned of sediment prior to on maintenance. Unless otherwise approved by
the Superintendent all temporary erosion and sediment control measures
shall be removed at the completion of construction.

However such removal shall not proceed until the site is stabilised to the
Superintendent's satisfaction.

All construction vehicles shall be cleaned of mud and/or loose dirt prior to
leaving the site.

No release, or flow is permitted from the site, throughout the earthworks and
construction period, to any waterway, or stormwater drain or drainage line
leading to a waterway or area of native vegetation, unless the level of total
suspended solids does not exceed a concentration of 50 milligrams per litre.
An effective water quality self-monitoring program, including at least one
representative measurement of the total suspended solids quality of any flow
or release from the site on each day runoff to water occurs, must be
implemented continuously throughout the life of the works which are the
subject of this approval. Where the findings of the required performance
self-monitoring program indicate that the 50mg/L TSS compliance limit is being
or is likely to be exceeded, remedial action must be taken without delay to
ensure ongoing compliance.

Sufficient stockpiles of mulch and/or other similar required erosion and
sediment control materials and stores must be maintained on site at all times
to enable ongoing erosion control, as well as site contingencies e.g. imminent
wet weather, to be dealt with, until commencement of on maintenance.

 

 

 

 

 

 

 

 

TASK ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY
PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER
CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS
AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER.
OF SEDIMENT FROM THE SITE.
MANAGEMENT e INSTALL THE CONTROL DEVICES AND ¢ COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER)
STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING.
DESCRIBED ON PLANS. e¢ CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS,
e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN.
STAGE AREA PRESENTLY UNDER e FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE
CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT
e ALL MUD AND SILT DEPOSITED ON THE OFF-SITE.
ADJACENT ROADWAY SHALL BE REMOVED e PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND
BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE
¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE:
AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN
BEEN STABALIZED. — TEMPORARY SILT FENCE
e¢ WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS
CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED
CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS.
SHALL BE ALLOWED TO DRY THEN e¢ PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER
REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS
BEEN ACHIEVED.
MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN
TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE.
CORRECTLY INSTALLED AND ADEQUATELY
MAINTAINED, IN PARTICULAR PRIOR TO
FORECAST PERIODS OF RAIN OR STORMS.
CORRECTIVE e¢ EMPTY AND REPAIR TRAPS REGULARLY.
ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY.
DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA.
e PLACE ADDITIONAL CONTROL DEVICES
WHERE EXISTING INSTALLATIONS ARE
INADEQUATE.
REPORTING WEEKLY REPORTS BY THE PRINCIPAL
CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL
MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN
AND THE PERFORMANCE OF CONTROL
MEASURES.

 

 

 

SEDIMENT & EROSION MANAGMENT PLAN

 

shall

 

 

e OBJECTIVE:

 

SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN:

 

be incorporated:

Prior to the commencment of any construction activities the following measures

Provide education of site personnel

Set up action plans as a precaution in case of disturbances occuring

especially after an unexpected strong rainfall event

SIGNED BY THE PRINCIPAL AND
SENIOR DESIGN ENGINEER
DR.-ING. REINHOLD KOENNING
RPEQ7023

MSC, PHD, MEAUST, AHSCA

DATE AS PER TITLE BLOCK

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the ‘Amd Description Date
temporary structures.
LEGEND * LEGISLATION:
Environment Protection Act 1994
Existing storm water Environmental Protection Water Policy 1997
The Integrated Planning Act 1997
Storm Water Drainage
e RESPONSIBILITY:
Agi Drain The responsibility for all measures regarding the sediment and erosion control during construction shall be with the
CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for:
Floor Waste .
° FWG gully *the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of NOTES FOR STCcKeUNG Oe enor THE CONTRACTOR SHALL PROVIDE A
these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE
i GP1 Gully Pit *“*the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT
wed disposed of . SHALL BE VISIBLEY PLACED IN THE SITE OFFICE. Issue Notes Date
installation and maintenance of the sediment control fences all around the perimeter as shown in plan ADVICE: For Development Approval
—o—_1——. Sediment Fence ***control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event ._ LOCATE STOCK PILES ON LEVEL GROUND AWAY — P PP
**control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED For Building Approval x 28-10-16
———— Boundary een eicies staff and lead b OVERLAND FLOW. For Tender
: ‘supervise other members of staff and lead by example _ . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Construction
9 Diameter **“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL
C.0.8, Cleanout to surface butts and also building material cut offs. RUNOFF. IAs Constructed
Een Eccentric Enlarger **“ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE
PRL Finished floor level blocking drain paths and kept neat and clean. STOCKPILE TO TRAP SEDIMENTS BEING WASHED
GP Gully pit *“control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other OFF THE PILE
a pully Mon Hole b measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS
nspection Chamber
IL Invert Level TO AVOID RUNOFF PASSING THROUGH. .
K&C Kerb & Channel * ACTIONS: / a / H draulic Me)
MH Manhole In case of major rainfall events the following action plan shall be followed and responsibly looked after by the '
Po Planter outlet CONTRACTOR: CUT-OFF DRAIN ALONG CONTOUR — LONG TERM PLASTIC SHEET WHEN RAIN OR
RPB Real Property Boundary \~
RPD Real Property description **DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. . .
RWO Rain water outlet be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF. contact: Reinhold Koenning MigAust AHSCA
RWH Rain water head *check the fences after every rainfall and replace the fences where required. Check and replace all barriers, PO Box 181
SL Surface Level bales, sandbags and temporary swales, cut off drains and trenches where required. Moffat Beach, QLD, 4551
Sq Square ***clean out sedimentation material as soon as the moisture content allows it. email: [email protected]
SWD Storm water drain **check the receiving pit and improve the barriers if required. PH: (07) 5491 4333
Ta Trench grate transverse bar “REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! CLIENT :
TG(I) Trench grate longitudinal bar
u/g Underground G & B CONNAN
u/s Under slab
u.n.o. Unless noted otherwise SEDIMENT FENCE AS SPECIFIED ALONG CONTUR ARCHITECT :
(EXTEND 3m min. EACH SIDE OF STOCKPILE. M DESIGN
Z|
STOCKPILES (PRovect: 38 ELANDA STREET Y
SUNSHINE BEACH
1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, DUPLEX
CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS.
2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DRAWING TITLE:
MOUNDS (2m max. HEIGHT.)
ESC NOTES )
Design | RK. Checked Ch Dote |28—10—16 | Dwg. No. AMD.
SCALE : N/A ON At UNo.| 5 of 5 3190-5 J

 

 

 

 

 

RPD:— LOT 158 RP 48112

 

 

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

3190 COLOUR 281016.pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.