Council archive · source document
3190 Colour 281016 · MCU16/0049
Attached to the e-mail Response to information request Part 3 MCU16/0049 & OPW16/0109.
51.3
51.30
am ree ao =
x9 1.50
mH =m: fi PRR RGREoe
“= 53°20 5175 51.95 * 51.848. -50.93
eo \ \
va a. amt ° \ . Oo
/ , ay NL
.91.78 “ % a . ) . \ A
% SS *S 4
eo \ ‘ DD
. y
% \. Q100=18L/sec Gf
52 20% NS NN. 151
. % a 51.90 RI.
/ ee ‘“ XS
2, _ ;
»91.99 % oN _
Q100=19L/sec
STREETVIEW PRIOR TO DEMOLITION
COURTESY OF GOOGLE
THIS “SKETCH SHOWS THE RUNOFF
CONFIGURATION OF THE GREENFIELD
SITE PRIOR TO ANY DEVELOPMENT
Q100=48L/sec
NOTE:
PRE—DEVELOPMENT CONFIGURATION
WAS A SINGLE RESIDENTIAL DWELLING
WITH ESTIMATED 200sqm ROOF AND
SEALED IMPERVIOUS AREA. THE
DIRECTION OF OVERLAND FLOW
SHOWN INDICATIVE ONLY.
IS
NOTE:
THIS SKETCH SHOWS THE RUNOFF
CONFIGURATION OF THE DEVELOPED
SITE BEFORE DEMOLITION
isapmgnnanadiiiitnmnnny
50.55
49.66
49.51
49.68
ABHND 8 Gay
}
150.44
50.59
49.30
49.16
49.66
49.51
49.68
JOYND ¥ quay
INTENSITY FREQUENCY DURATION TABLE
LOCATION SUNSHINE BEACH QUEENSLAND
AVERAGE RECURRENCE
INTERVAL
DURATION 1YR
2YR
SYR
10YR
20YR
SOYR
100YR
Smin 130
165
202
223
253
291
319
10min 100
127
156
173
196
226
249
30min 60
76
95
105
119
138
152
60min 41
52 65 72
106
82 96
600.0
500.0
400.0
300.0
200.0 :
150.0 P=
100.0 |--—— ~¢
80.0 mE
60.0
50.0
40.0
30.0
20.0
NY ARID WO
RAINFALL INTENSITY IN MILLIMETERS PER HOUR
Oo 000000
1.0
0.8
0.6
100 YEARS —
SO YEARS
20 YEARS
10 YEARS
5 YEARS
2 YEARS
1 YEARS
0.4
- ar
— <r
0.3
Sm6m10m
STORMWATER CALCULATIONS:
AREA OF UNDEVELOPED SITE:
Q100 INTENSITY:
TIME OF CONCENTRATION:
RUOFF COEFFICIENT:
20m 30m
thr 2hr = Shr 6hr 12hr 24hr
DURATION IN HOURS OR MINUTES
DESIGN RAINFALL INTENSITY CHART
LOCATION SUNSHINE BEACH
PRE DEVELOPMENT RUNOFF CONFIGURATION
569sqm
326mm/hr
Smin
0.88
THEREFORE PEAK RUNOFF PRE DEVELOPMENT:
45L/sec
POST DEVELOPMENT RUNOFF CONFIGURATION:
NEW IMPERVIOUS AREA:
POST DEVELOPMENT Q100 FLOW:
361sqm
48L/sec
ROOF CATCHMENT AREA OF PROPOSED HOUSE:
Q20 DESIGN FLOW OF EXSITING ROOF TO KERB:
Q10 DESIGN FLOW HARDSTAND TO KERB:
277sqm
19L/sec
3.5L/sec
TOTAL TO KERB: 22.5L/sec
REMAINING RUNOFF TO DOWNSTREAM PROPERTY:
Q100
44L/sec MINUS Q20 FROM ROOF TO KERB
REMAINING POST DEVELOPMENT, Q100 RUNOFF: 22.5L/sec < 45L/sec
48hr
72hr
SIGNED BY THE PRINCIPAL AND
SENIOR DESIGN ENGINEER
DR.-ING. REINHOLD KOENNING
RPEQ7023
MSC, PHD, MEAUST, AHSCA
DATE AS PER TITLE BLOCK
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description
Date
Issue Notes
Date
For Development Approval
For Building Approval x
28-10-16
For Tender
For Construction
As Constructed
E Hydraulic 3:
\-
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333
contact: Reinhold Koenning MigAust AHSCA
RPEQ# 7023
CLIENT :
G & B CONNAN
ARCHITECT :
iS M DESIGN
(PROJECT: 38 ELANDA STREET
SUNSHINE BEACH
DUPLEX
A
DRAWING TITLE:
STORMWATER
CALCULATIONS AND
OVERLAND FLOW
iy
‘/
Design | RK. Checked Cro Date
{SCALE #1
28-10-16
3 of 5
: 100 ON At U.N.O.
Dwg, No.
3190-3
AMD.
RPD:— LOT 158 RP 48112
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
3190 COLOUR 281016.pdfRelated documentApplication case desk ↗
3190 COLOUR 281016.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.