Original source · versioned page text
2014-01-20 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 20 JANUARY 2014
Page 35 of 86
ORDINARY MEETING AGENDA 20 JANUARY 2014
ORDINARY MEETING AGENDA 14 NOVEMBER 2013
CONCLUSION
The proposed shopping centre is an inconsistent use within the Open Space Recreation
Zone of the Eastern Beaches Locality. Section 326(1)(b) of the Sustainable Planning Act
2009 seeks that the assessment manager's decision must not conflict with the Planning
Scheme, unless there are sufficient grounds to justify the decision, despite the conflict.
This assessment finds the increased traffic demand created by the proposed shopping
centre presents serious safety concerns to the surrounding road network, with doubts raised
as to the technical feasibility of any road upgrading to resolve the problems. The increased
traffic on the surrounding residential collector streets will also have substantial safety and
noise impacts.
The design of the shopping centre is reliant on utilising an existing carpark along David Low
Way, even though no formal access has been provided by council, creating a conflict with the
existing community uses that use this car parking area. Furthermore, the proposed built form
does not match with the surrounding residential streetscape, including the use of 40m long x
3.5m high acoustic walls presenting as an entrance to the development from the only street
frontage to which the site has access.
While the applicant’s economic report indicates a level of economic need for a convenience
retail development in Peregian Beach, the overwhelming objection to the development
expressed by the community during public notification serves to undermine the level of
planning need for the development. The location of the site is also physically separated by a
350m walk to the Peregian Beach Village Square, which is the community’s existing focal
point for community interaction and commerce. The separation between the 2 locations will
result in 2 centres, operating independently from each other and further reducing the level of
planning need for the proposal.
The applicant has not adequately demonstrated that the use of the Open Space Recreational
zoned land is surplus to Peregian Beach’s needs. This development alienates any future
use of the site for sport and recreation purposes, which is contrary to The Noosa Plan,
Sunshine Coast Open Space Strategy and the draft Sunshine Coast Planning Scheme.
It is, therefore, concluded there are insufficient grounds to justify the proposal’s significant
conflicts with The Noosa Plan, and the application is recommended for refusal.
Sunshine Coast Regional Council OM Agenda Page 75 of 360
Page 35 of 86See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.