DESCRIPTION OF POWER DELEGATED LEGISLATION
Power, as the holder of an approval of a discounted rate for the waste levy for Section 50(3)(e)
residue waste, to make submissions in response to a notice from the chief
executive about cancelling or amending the approval.
Power, as the operator of a waste disposal site, to receive and request delivery Section 53
information for waste.
Power, as the operator of a resource recovery and transfer facility, to receive Section 54
and request delivery information for waste.
Power, as the operator of a levyable waste disposal site, to pay the chief Section 56
executive the waste levy, including any interest.
Power, as the operator of a waste disposal site in the waste levy zone, to Sections 56 and
ensure a weighbridge is installed and operates at the site, is brought back into 57
operation if out of operation, and give notice to the chief executive where the
weighbridge is out of operation and brought back into operation, as required by
sections 56 and 57.
NOTE: an exemption may apply until 30 June 2029 pursuant to chapter 16,
part 3, division 2.
Power to measure and record waste as required by sections 59, 60 and 61. Sections 59, 60
NOTE: an exemption may apply until 30 June 2029 pursuant to chapter 16, and 61
part 3, division 2.
Power, as the operator of a waste disposal site, to agree with the chief Section 60(3)
executive about an alternative way to measure and record the waste.
Power, as the operator of a waste disposal site and where the chief executive Sections 63, 64,
has given Council a notice under section 63(2), to install, maintain and operate 65 and 66
a monitoring system as required by the notice, and comply with sections 64, 65
and 66.
Power, as the operator of a levyable waste disposal site, to carry out volumetric Sections 67, 68
surveys, ensure volumetric surveys are carried out, and give the chief executive and 69
copies of the results of the volumetric surveys as required by sections 67, 68
and 69.
Power, as the operator of a levyable waste disposal site, to give the chief Section 72
executive a waste data return.
Power, as the operator of a levyable waste disposal site, to keep the documents Section 72A
stipulated in section 72A.
Power, as the operator of a levyable waste disposal site, to apply to the chief Section 72C
executive to enter a waste levy instalment agreement, and enter the
agreement.
Power, as the operator of a levyable waste disposal site, to apply to the chief Section 72D
executive for an amendment of a waste levy instalment agreement, and enter
the amendment agreement.
Power, as the operator of a levyable waste disposal site, to apply to the chief Section 72G
executive for an extension of time to pay a waste levy amount.
Page 97 of 103
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.