Council archive · source document
10/0722 - Operation Works - Signage [As Published] · 142010.722
- {Sunshine Coast Checklist - Applications Involving Planning
Regional Council Assessment and Operational Works Assessment
RECEIPT OF IDAS APPLICATIONS AT: TEWANTIN OFFICE
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
’ application at the counter to determine if properly made. (This may not always be possible and can be further checked)
1 2 APPLICATION FORMS _ Ee ae
1.1 Form 1 required for all application & Forms 2-32
1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include 4
payment of appropriate fee. (Do not receipt at this stage)
1.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required. a)
1.1.2.1 If there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No, Company name (clearly indicated by
signatory) or Company Seal required.
12. IDAS ASSESSMENT. CHECKLIST_ a
2.1 Ensure that relevant checklist/s have been completed with regard to referrals
(if applicable, not mandatory)
2.2 Ensure correct IDAS.Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works)
AAA
appre meneame nttnrsneam
3 oo ENVIRONMENTALLY RELEVANT ACTIVITIES
3.4 Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Healthly Places for fees)
[av FORM 2 - REQUEST:TO CHANGE APPROVAL ¢.22
4.1 Ensure that relevant items have been checked and/or completed including information regarding —
applicant details along with owners consent if not current owner of land as shown on Council records. -
If over multiple properties on one or more sites, consent of Body Corporate is required.
5.14 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational l
Works) accompany the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is |
: unbound. .
(6 SUPPORTING INFORMATIONS ge eee eee |
6.1 Ensure.that generaily at least 6 copies of any report accompanies the application (5 for Reconfiguration t
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. =
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping _
7A Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
« Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
. Operational Works Assessment Operational Work not including Jetties
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
T g:Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 19 pages
Page 2
AS REFERRAL AGENCIES SJTRIGGERS (Most frequent referrals)
\[Bieaselrefer,to.IDAS Checklis ‘foncomplete list
Department of Main Roads (Concurrence or Advice)
« State Controlled Road
Dept Environmental Resource & Management
Advice
« Acid sulphate soils
e Wetlands
* Conservation estate
Concurrence
« Clearing of native vegetation on freehold land ;
¢ Environmentally Relevant Activity (for non-devolved Council as EPA)
« Contaminated land
* Environmental Management/Contaminated Land Register
= UXO
« Land recently used as a ‘notifiable activity’
" — industrial land changed to sensitive uses (eg school)
e Coastal related development.
¢ Koala habitat
Queensland Transport (Concurrence)
. Railway
° Public Passenger Transport
Energex or other responsible entity (Advice)
. Electricity Easements/Substations
DIP (Concurrence)
. SEQ Regional plan
VARIOUS
For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.
Tr. 'g:Manduse\administrative processes\application checklist.doc
Page 3
—————
SCRC CORRESPONDENCE
\
AP
CREATING AN TMA GE
Me
$0037604
ET .
Darryl Sloman (project manager)
The Signcraft Group Pty. Ltd.
5 Hurricane Street.
BANYO QLD. 4014
04 May 2010
Trish,
Please find enclosed drawing/montage, application forms and cheque for payment for development
application for cantilevered lightbox sign above NAB ATM at 30 Hastings St Noosa.
We propose to install the sign at a lower than “non-assessable” height in order that the sign will be
visible to ATM users. (Existing awnings prevent the sign being installed at the minimum 2,400mm
clearance from footway.) The proposed height is 2,150mm above footway.
The sign features an internal timer which will be set to activate at 5:30pm and turn-off at 11:00pm.
Please contact me at [email protected] to communicate any concerns, issues or requests
for information.
Thank you.
Regards
DARRYL Stomans
OGO2 222 49)5.
I9{S ho - (VRirneha_ of-
Meewsed (27) _
Applréaten, >
Tew eo ~ eee tos
net S beeen
Page 4
integrated Development Assessment.System form
Application details—IDAS form1 ©.
{Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
© complete this form (Application details—IDAS form 1)
¢ complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your
- application.
“Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Applicant details (note: the applicant is the person. responsible for making the apptication and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or pretiminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
Name/s (Individual or company name in full) NATIONAL AUSTRALIA BANMK
For companies, contact name SARAH LAW
Postal address Level 7, §co Bevekce ST
DOCKLANDS Vic 3008
Contact phone number O3 368G 4897
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory) Sarah, x. lanx@ nab. com.au
‘
Department of Infrastructure and Planning @in
Page 5
CLL
1. What Is the nature of development proposed? (tick all applicable box/es)
C] material change of use of premises
EC] building work
operational work
CL] reconfiguring a lot
2. What type of approval is being sought?
iy development permit UC] preliminary approvat CL] both—provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
ow
C] Yes—complete table A and then go to question 5
Table A—name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
7 street address/lot on the plan
C] street address/lot on plan for the land adjoining or adjacent to the premises {appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description | Local government area
Unit | Street | Street name and official suburb/ | Post-- | Lotno. Plan type (e.g. Logan, Cairns)
ho. no. locality name code and plan no.
S ~~ fa. a on
nN 30 Uasrines Steer Su SHINE Coas7
Noo sa
2 Application details—iDAS form 1
Version 1.0 18 December 2009
Page 6
LI Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates (note: place each set of coordinates in a separate row) Easting Northing Latitude Longitude Zone reference Datum Local government area (if applicable) C] GDA94 [-] wese, | other 5. Total area of the premises on which the development is proposed (indicate hectares or m?) 6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.) OFF STE AT. 7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.) SIGNAGE 8. Is owner’s consent required for this application? (refer to notes at the end of this form for more information) [WY No LJ Yes—complete either table D, table E or table F as applicable Table D Name of owner/s of the land t/We, the above-mentioned owner/s of t he land, consent to the making of this application. Signature of owner/s of the tand Date Application details—IDAS form 1 Version 1.0 18 December 2009
Page 7
LL Table E Name of owner/s of the land | The owner’s written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land | By making this application, I, the applicant, declare that the owner has given written consent to the making of the application. 9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials. Refer to the notes at the end of this form for more information) a C] Yes—complete table G Table G—state owned resources (provide details for each state resource in a Separate table) Nature of state-owned resource Nature of evidence required (tick the applicable box and attach a copy of the C] Evidence of an allocation of, or an entitlement to, the resource evidence to this form) LC] Evidence the chief executive of the department administering the resource is satisfied the development is consistent with an allocation of, or an entitlement to, the resource LJ Evidence the chief executive of the department administering the resource is satisfied the development application may proceed in the absence of an allocation of, or an entitlement to, the resource 10. Identify if any of the following apply to the premises (tick applicable box/es) C adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H | on strategic port land under the Transport Infrastructure Act 1994—complete table | C] in a tidal water area—complete table J Table H Name of water body, watercourse or aquifer 4 Application details—iDAS form 1 Version 1.0 18 December 2009
Page 8
DIO Table t Lot on plan description for strategic port land Port authority for the tot Table } Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable) 11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.) oH No | Yes—ensure the type, location and dimension of each easement is included in the plans submitted 12. Does the proposal include new building work or operational work on the premises? (including any services) | No TH vesmensure the nature, location and dimension of proposed works are included in plans submitted 13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this form for more information) AL a No—go to question 15 LC Yes 14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information) [] Ne Yes—complete table K and submit with this application the yellow local government/ private certifier’s copy of the receipted QLeave form Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B, E, L or P) 15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act 2009? A ve C] Yes—please provide details below Name of local government Date of written notice given | Reference number of written notice given by local government by local government (if applicable) 5 Application details—IDAS form 1 Version 1.0 18 December 2009
Page 9
DU 16. List below all of the forms and supporting information that accompany this application (include all !DAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made on-line using Smart eDA) Description of attachment or title of attachment Method of lodgement to assessment manager PROPOSAL SU6M DESIGN DRAwne/monsH GE HARP CoPY wate? (DAS FeRm FT HARD COPY AED, [PAS FoRw G HARD CoP riniteD, LETTER OUriininé pevewPnens AprucaTien Regurerey” MARP COPY ridiced CHA PR PAINET EF flPeICATIN FEES. HARD Lary wtAceD 17. Applicant’s declaration Mey making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Notes for completing this form Question 8: ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application, Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. ¢ Owner's consent is not required for a mobile and temporary ERA. Question 9: ¢ Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: © The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. © The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Question 14: ¢ The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. ¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au. Application details—IDAS form 1 Version 1.0 18 December 2009
Page 10
* Ooo Privacy—the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as tequired by Parliament. This information may be stored in a departmental database. The information collected will be retained as required by the Public Records Act 2002. OFFICEUSEONLY Date received ( s]sfre) m 18] sfro 7 NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To Reference numbers TS ee Council. | have been engaged as the private certifier for the building work referred to in this application Date of engagement Name BSA Certification license number Building classification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Date receipted er QLeave Project Amount paid . form sighted by |Name of officer who D tion of th k D d . escription of te wor Number ($) ate paid | sessment sighted the form manager The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application details—IDAS form 1 Version 1.0 18 December 2009
Page 11
ot Integrated Development Assessment System form a a Building or operational work assessable against a planning scheme—IDAS form 6 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) This form must be completed for development applications for building works or operational work assessable against a planning scheme. ' You MUST complete ALL questions unless the form indicates otherwise. Incomptete forms or forms without all necessary information and documentation will result in your application not being a properly made application. For all development applications, you must: ¢ complete Application details—IDAS form 1 * complete any other forms relevant to your application . provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be used for development on strategic port land under the 7ransport Infrastructure Act 1994, This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au 1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es) | building work—complete table A ra operational work—complete table B TableA What is the nature of the building work made assessabte in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attachment to this form to detail each approval request) C] development permit L] preliminary approval Are there any current approvals associated with this application? (e.g. material change of use) List of approval reference/s Date approved Date approval lapses Department of Infrastructure and Planning @in e \
Page 12
b. cen oa LO Table B What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es) C] road works C] stormwater | water infrastructure | drainage works | earthworks C] sewerage infrastructure C] landscaping ‘ signage | clearing vegetation under the planning scheme C] other—provide details What type of approval is being sought? (if you have indicated multiple works in the above question, please use an attaghment to this form to detail each approval request) development permit | preliminary approval | both—specify below Is the. operational work necessary to facilitate the creation of new lots? (e.g. subdivision) No [_] Yes—specify the number of lots being created Are there any current approvals associated with this application? (e.g. material change of use) No L] Yes—provide details below List of approval reference/s Date approved Date approval lapses $ 4,200-00 "3. Confirm that the following mandatory supporting information accompanies this application Confirmation of Method of lodgement lodgement All applications for operational works site plans drawn to scale which show the following: [A confirmed MAIL e the location and site area of the land to which the application relates (relevant land e the north point e the boundaries of the relevant land e the alfotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) 2 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 13
LLL e any existing or proposed easements on the relevant land and their function ® any access limitation strips e allexisting and proposed roads and access points on the relevant land a statement about how the proposed development addresses the local government’s planning schemes and any other planning documents relevant to the application [A.confirmed Applications for operational works involving earthworks (filling and excavatin 2) fh drawings showing: e existing and proposed contours @ areas to be cut and filled @ the location and level of any permanent survey marks or reference stations used as datum for the works ¢ the location of any proposed retaining walls on the relevant land and their height e the defined flood level (if applicable) e the defined fill level (if applicable) C] confirmed Applications for operational works Involving roadworks WA drawings showing: © existing and proposed contours ¢ the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points e information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) © kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) © edge of pavement where kerb is not constructed e position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if appticable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings @ changes in surfacing material C] confirmed 3 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 14
LIL Applications for operational works Involving stormwater drainage Via. drawings showing: existing and proposed contours drainage locations, diameters and class of pipe, open drains and easements manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels | confirmed Applications for operational works involving water reticulation Mp drawings showing: kerb lines or edge of pavement where kerb is not constructed location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicabte) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs [I confirmed Applications for operational works Involving sewerage reticulation Mf drawings showing: location of all existing and proposed services location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable) confirmed Applications for operational works involving street lighting M/A drawings showing: location of all light poles and service conduits location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of lighting levels C] confirmed 4 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 15
LILI Applications for operational works involving public utility services N/A drawings showing: [| confirmed e any existing light poles and power poles © any existing underground services © details of proposed services alternation to existing services Applications for operational works involving landscaping works WA drawings showing: | confirmed e the location of proposed plant species e aplant schedule indicating common and botanical names, pot sizes and numbers of plants © planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge @ the location and type of any existing trees to be retained © construction details of planter boxes, retaining walls and fences « the proposed maintenance period e irrigation system details Notes for completing this form: e This form can also be used for devetopment applications for building works or operational works assessable against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy—please refer to your assessment manager for further details on the use of information recorded in this form, OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. 5 Building or operational work assessable against a planning scheme—IDAS form 6 Version 1.0 18 December 2009
Page 16
Py — — 47 —____________,,
413 435
~——_314___-.. —312—__.|
11mm white stripe height n’ height: 153mm. Typeface: Corpid Bold
'm’ height: 61mm
‘atm’ to be centred both vertically and
horizontally within the red field
1572 Signbox ATM - EXSF-03 ATM
‘nab’ lettering cutout from Avery 5303 Blockout F Black film
‘star’ moulded 3 dimensional
Avery 5519QM Apple Red vinyl ATM sections with atm lettering cutout
‘nab’ logo is always road justified
S:\_Artwork Folder\AW WIP QLD\NAB\_New Branch Roll Out 2009-2010\Noosa (QLD)\Design Files
COPYRIGHT- ALL RIGHTS RESERVED Design Concept
TheSigneraftGoup serene
from any fair deal
confidential apart
Tel: 61-7-3267 8977 5 Hurricane Street
Fax. 61-7-3267 8988 Banyo Approved by NAB Representive
E-mail: [email protected] QLD 4014
(Name. Date. Sianature)
Project:
Client
Contact:
30 Hastings Street,
Noosa
NAB
Brent Reesby (BLL)
File name:
Description:
Scale
1:10
@
NAB Noosa
Cantilevered Lightbox above existing ATM
Drawing size Drawn: Checked: Date:
@A3 OA4 sc DS 21/01/10
O Other {W x H}
OO Issue
Page: 1of 1
Page 17
11mm white stripe height 'W’ height: 153mm Typeface: Corpid Bold
‘m’ height 61mm
‘atm’ to be centred both vertically and
horizontally within the red field
1572 Signbox ATM - EXSF-03 ATM
‘nab’ lettering cutout from Avery 5303 Blockout F Black film
‘star’ moulded 3 dimensional
Avery 5519QM Apple Red vinyl ATM sections with atm lettering cutout
‘nab’ logo is always road justified
S:\_Artwork Folder\AW WIP QLD\NAB\_New Branch Roll Out 2009-2010\Noosa (QLD)\Design Files
. Design Concept
TheSigneraftGoup Project
Client:
Tet 61-7-3267 8977 5 Hurricane Street
-?- 7 i
Er Simgapentome Son ommeee Contact:
30 Hastings Street,
Noosa
NAB
Brent Reesby (BLL)
Filename: NAB Noosa
Description: Cantilevered Lightbox above existing ATM
Scale: Drawing size: Drawn: Checked: Date:
1:10 @ @A3 OA4 sc DS 21/01/10
O Other {W x H}
Page: 1o0f1
Page 18
BRN et fees, Y Seale ee cme enat Let
Page 19
Sunshine Coast CAND USE SECTION FEES Regional Council CIVICA TYPE RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520: Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES . Material Change of Use - Code/!mpact MCU Consistent 521 Inconsistent 521 Assessment under Superseded Planning Scheme . §21 Modification to a Development Permit MOD DP . 521 Extension of a Currency Period 521 Lot Reconfiguration RECONFIG _ 521 Bldg Work assessable against the Planning Scheme Ofmrs ee 521 PRE LODGEMENT REVIEW Half Hour 522 One Hour §22 ADVERTISING . ‘ : » Purchase Advertised Applications §23 JETTIES ” Jetty Application Fee 524 « Jetty Bond . " si (Category 4) BONDS . Performance Bond 51 (Category 9) SEARCH FEE / Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ 148 NAME: Sega cra pe lug Ltof ADDRESS: Gs peewee» St . bartHeo Oo ois FILE NO: fol In4— DATE: 1877 RECEIPT NO: I G2S7) bar 7 Signature of TP Officer: PL wooo 5 AUTHORITY NO: : i Vee/ rere| rr
Page 20
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 > FEE CALCULATION t shy, OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
10/0722 - Operation Works - Signage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.