TPC 1469 - Change to Existing Approval (minor change to shade sails) [As Published] · 51981.3375.02

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                            Officer:          Denis Wallace
                                            Direct Telephone: (07) 5449 5179
                                            Response Address: Locked Bag 72
                                                              Sunshine Coast Mail Centre QLD 4560
                                            Email:            [email protected]
                                            Our Reference:    TPC 1469
                                            Your Reference:
8 July 2010


Breffney CTS 9466
CARE North Shore Body Corporate
936 David Low Way
MARCOOLA QLD 4564



Dear Sir / Madam
Re:    Change to Development Approval TPC1469 for rooftop shade sail structures at
       4 Avocet Parade, Peregian Beach described as Lots 0-4 BUP5739,

I refer to your request to make a change to the above development approval. On 5 July 2010 Council
decided to: -
Approve the change subject to the following additional conditions:
1.     The development is to be undertaken in accordance with the approved plans, being sketch
       plan number SK-1 “Plan View and Side View” dated 11 July 2009 and as may be amended by
       the conditions herein.
2.     Shade cloth or similar non-reflective material shall be applied to the top side of the sail
       structures to reduce glare to neighbouring residences.
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is also attached.

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,




Denis Wallace
Senior Development Planner




Enc. Appeal Rights




                                                                                           Page 1 of 3
Full text of the other 2 pages

Page 2

                                                                                                        2007/2463




                                                    Appeal Rights
                                                   INTEGRATED PLANNING ACT 1997 & 1998 REGULATION



The following is an extract from the Integrated                     (5) If an application is processed under section
Planning Act (Chapter 4).                                       6.1.28(2), appeal rights for submitters for the application
                                                                are available only for the aspects of the development
Division 8 - Appeals to                court   relating   to    that would have required public notification under the
development applications                                        repealed Act.
Appeals by applicants                                               (6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application may       concurrence agency code, appeal rights for submitters
appeal to the court against any of the following-               for the application are not available against the part of
                                                                the approval that represents the concurrence agency’s
(a) the refusal, or the refusal in part, of a development       response for the code.
    application;
                                                                Appeals by advice agency submitters
(b) a matter stated in a development approval, including
    any condition applying to the development, and the          4.1.29.(1) An advice agency may, within the limits of its
    identification of a code under section 3.1.6;1              jurisdiction, appeal to the court about the giving of a
                                                                development approval for a development application if-
(c) the decision to give a preliminary approval when a
    development permit was applied for;                         (a) the development       application   involves      impact
                                                                   assessment; and
(d) the length of a relevant period;
                                                                (b) the advice agency told the applicant and the
(e) a deemed refusal.                                              assessment manager to treat its response to the
    (2) An appeal under subsection (1)(a) to (d) must be           application as a submission for an appeal.
started within 20 business days (the “applicant’s appeal
                                                                   (2) The appeal must be started within 20 business
period”) after the day the decision notice or negotiated
                                                                days after the day the decision notice or negotiated
decision notice is given to the applicant.
                                                                decision notice is given to the advice agency as a
   (3) An appeal under subsection (1)(e) may be started at      submitter.
any time after the last day a decision on the matter should
have been made.                                                 Appeals for matters arising after approval given
                                                                (co-respondents)
Appeals by submitters
                                                                4.1.30.(1) For a development approval given for a
4.1.28.(1) A submitter for a development application may        development application, a person to whom any of the
appeal to the court about-                                      following notices have been given may appeal to the
(a) the giving of a development approval, including any         court against the decision in the notice-
    conditions (or lack of conditions) or other provisions      (a) a notice giving a decision on a request for extension
    of the approval; or                                            of the relevant period for an approval;
(b) the length of a relevant period for the approval.           (b) a notice giving a decision on a request to make a
    (2) The appeal must be started within 20 business              minor change to an approval.
days (the “submitters appeal period”) after the day the             (2) The appeal must be started within 20 business
decision notice or negotiated decision notice is given to       days after the day the notice of the decision is given to
the submitter.                                                  the person.
   (3) If a person withdraws a submission before the                (3) Subsection (1)(a) does not apply if the approval
application is decided, the person may not appeal the           resulted from a development application (superseded
decision.                                                       planning scheme) that was assessed as if it were an
   (4) If an application involves both impact assessment        application under a superseded planning scheme.
and code assessment, appeal rights for submitters are
                                                                   (4) Also, a person who has made a request
available only for the part of the application involving
                                                                mentioned in subsection (1) may appeal to the court
impact assessment.
                                                                against a deemed refusal of the request.
                                                                    (5) An appeal under subsection (4) may be started
                                                                at any time after the last day the decision on the matter
                                                                should have been made.



1
   Section 3.1.6 (Preliminary approval may override local
planning instrument)
                                                                                                             2 of 3

Page 3

                                                                                                      2007/2463

Division 9 - Appeals to court about other matters              4.2.9(1) An applicant for a development application may
                                                               appeal to the Building and Development Tribunal against
Appeals for matters arising after approval given               any of the following-
(no co-respondents)
                                                               (a) the refusal, or the refusal in part, of a development
4.1.31.(1) A person to whom any of the following notices             application;
have been given may appeal to the court against the
decision in the notice-
                                                               (b) a matter stated in a development approval, including
(a) a notice giving a decision on a request to change or             any condition applying to the development, and the
    cancel a condition of a development approval.                    identification of a code under section 3.1.6;3
(b) a notice under section 6.1.442 giving a decision to        (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                    development permit was applied for;
    approval.
                                                               (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business                relevant period;
       days after the day the notice of the decision is
       given to the person.                                    (e) a deemed refusal.

    (3) Also, a person who has made a request                      (2) An appeal under subsection (1)(a) to (d) must be
       mentioned in subsection (1)(a) may appeal to the        started within 20 business days (the “applicant’s
                                                               appeal period”) after the day the decision notice or
       court against a deemed refusal of the request.
                                                               negotiated decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started
                                                                   (3) An appeal under subsection (1)(e) may be
       at any time after the last day the decision on the
                                                               started at any time after the last day a decision on the
       matter should have been made.
                                                               matter should have been made.
Appeals against decisions to change approval conditions
under the repealed Act
                                                               The Registrar for the Building and Development
                                                               Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision       http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or          For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court        4.1.36 Appeals about particular infrastructure
against-                                                       charges
(a) the decision; or                                           (1) This section applies to a person who has been
                                                               given, and is dissatisfied with, an infrastructure charges
(b) a deemed refusal of the application.                       notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be              (2) The person may appeal to the court against the
started within 20 business days after the day notice of        notice.
the decision is to be given to the person.
                                                               (3) The appeal must be started within 20 business days
    (3) An appeal under subsection (1)(b) may be               after-
started at any time after the last day a decision on the
matter should have been made.                                  (a)    if the notice is given because of a development
                                                                      approval or master plan approval-the day the
Appeals against local laws                                            applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a                   approval; or
decision of a local government or the conditions applied       (b)    otherwise-the day the notice is given to the person.
under a local law about the use of premises or the
erection of a building or other structure permitted by the     (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                               (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.
                                                                   that no reasonable relevant local government, State
   (2) The appeal must be started within 20 business               infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the          have imposed it; or
applicant.
                                                               (b)    an error in the calculation of the charge.
For Building Works Only                                        (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the             under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                       used to establish the charge in the relevant
                                                               infrastructure charges schedule or regulated State
Division 3 – Appeals          to   tribunals   relating   to   infrastructure charges schedule.
development applications
Appeals by applicants




2
  Section 6.1.44 (Conditions may be changed or cancelled       3
by assessment manager or concurrence agency in certain            Section 3.1.6 (Preliminary approval may override local
circumstances)                                                 planning instrument)


                                                                                                           3 of 3

Used in these records

About this file

File size
39 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

TPC 1469 - Change to Existing Approval (minor change to shade sails) [As Published].pdf · 39 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.