Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.12.2 Stepladders
Stepladders are permitted on this project                                                      Yes      No
The following requirements apply in relation to step ladders on this project.
Where, possible, scaffolds, aerial work platforms and step platforms (or platform ladders) should be used as an alternative to
stepladders.
All subcontractors intending to use stepladders must ensure stepladders are not used under the following conditions:
        If defective or damaged;
        Unless placed on a firm level surface in the fully opened position;
        For arc welding and oxy-acetylene cutting;
        To gain additional height if the person could fall from the ladder and onto or over edge protection;
        In an access area unless measures have been taken to redirect pedestrian traffic elsewhere or safely around the ladder;
        Near a doorway unless the door is blocked open, locked or removed;
        Unless the ladder has been manufactured for industrial use and has a minimum 120 kilogram rating; and/ or
        Unless used strictly in accordance with the manufacturer’s instructions.




3.13 Major plant
3.13.1 General requirements for mobile plant
Any mobile plant used on the work site by subcontractors must comply with the following requirements:
        Operator’s manual available;
        Evidence of current plant and/or design registration where required;
        Log books including pre-start checklist;
        Current maintenance and service records;
        Traffic management plan where deemed necessary by the Principal Contractor; and
        All mobile plant must be:
               Stored safely and locked with the ignition keys removed when not in use; and
               Fitted with (excludes EWPs):
                        Flashing lights and reversing beepers;
                        Locking pins to secure quick hitches (where applicable);
                        Approved and compatible attachments (e.g. for use on telehandlers); and
                        Burst protection on boom and dipper arms (applies only to excavators used as cranes and >1 tonne
                        capacity).​​




WHSMP-C 01/2018.8                                               Initials                                               Page 21 of 39

                                                 ____                           ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.