Council archive · source document
Attachment E - Approved Plans - MCU21 0228 01 & OPW21 0364 01 · MCU21/0228.02
Plans and drawings: the text below has words only, no drawings.
Distribution
April 2022
Copies Recipient
1 Electronic Copy (PDF) Altum Constructions
1 File Copy Arboriculture Contractors Australia
This document was prepared for the sole use of Altum Constructions.
No other party should rely on the information contained herein without the prior written
consent of Altum Constructions.
Disclaimer
No responsibility will be taken for the ongoing vitality of retention trees or damage that
they may cause in the future due to the dynamic nature of environmental change.
Follow up assessments are paramount to monitor plant health, structural integrity and
reduce any potential risk of harm.
3
© Use or disclosure of information contained on this sheet is subject to the restriction on the distribution page of this document
Document Set ID: 22822628
21942379
Version: 1, Version Date: 21/02/2024
26/05/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment E - Approved Plans - MCU21 0228 01 & OPW21 0364 01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.