the environment. The south-easterly boundary of the site is well planted. The proposed south-easterly portion of the building will sit inside the existing turfed channel as depicted in Figure 5 image below (note white pipe in background of image denotes approximate location of rear wall of building). It is therefore reasonable to accept a development condition to re-instate this turf at the completion of the development along with rectify any loss in landscaping within the existing landscape buffer set behind the chain wire fence. Figure 5 - Existing landscape buffer along south-eastern property boundary, Building Suncoast Green 2022