             Services & Organisation Committee
                    10 April 2018 - Item 4




                     ATTACHMENT 1


Noosa Local Disaster
 Management Plan
       2018

RECOVERY SUBPLAN
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 4 - Local Disaster Recovery Subplan(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 77 sections

Section 2

    Authorisation

    The Noosa Recovery Subplan provides information and guidance to stakeholders on the
    governance, planning and operational issues relating to disaster recovery for all hazards.

    The Noosa Recovery Subplan is maintained by the Noosa Council on behalf of the Noosa
    Local Disaster Management Group.

    The Noosa Recovery Subplan is a subplan to the Noosa Local Disaster Management Plan. It
    is prepared under the authority of the Noosa Local Disaster Management Group, in
    accordance with section 30(b) of the Queensland Disaster Management Act, 2003.

    The Noosa Recovery Subplan was endorsed and approved by the Noosa Local Disaster
    Management Group on (date) 2018.


    Acknowledgements

    Portions of this document are wholly or partially derived from the Queensland Recovery Plan
    2017.




© Noosa Council 2018

www.noosa.qld.gov.au

General Enquiries:
By telephone: (07) 5329 6500
By email: [email protected]
Fax: (07) 5329 6501
Street Address: 9 Pelican Street, TEWANTIN
Postal address: PO Box 141, TEWANTIN QLD 4565

Endorsed by Noosa Council [date to be inserted] or insert document date

Section 3

Table of Contents

1.   Introduction .................................................................................................................... 3
     1.1.        Purpose .............................................................................................................. 3
     1.2.        Context ............................................................................................................... 3
     1.3.        Definitions .......................................................................................................... 3
     1.4.        Legislation .......................................................................................................... 4
     1.5.        Maintenance of the Recovery Subplan ............................................................... 4
     1.6.        Abbreviations...................................................................................................... 4
2.   Foundations for Recovery ............................................................................................. 5
     2.1.        Community-led recovery ..................................................................................... 5
     2.2.        Four functions of recovery .................................................................................. 5
     2.3.        Principles for disaster recovery ........................................................................... 6
     2.4.        Re-establishing resiliency ................................................................................... 7
     2.5.        Post-disaster psychology .................................................................................... 7
     2.6.        Levels of recovery .............................................................................................. 8
     2.7.        Emergency Management Assurance Framework ............................................... 9
     2.8.        Queensland Disaster Management 2016 Strategic Policy Statement ............... 10
     2.9.        Monitoring and Evaluation Framework.............................................................. 10
3.   Recovery Arrangements .............................................................................................. 11
     3.1         Noosa Local Recovery Group ........................................................................... 11
     3.2         District Recovery Group ................................................................................... 16
     3.3         State recovery arrangements ........................................................................... 16
4.   Planning and Preparing for Recovery ........................................................................ 18
     4.1         Local recovery planning .................................................................................... 18
     4.2         Pre-engagement with the community ............................................................... 18
     4.3         Pre-engagement with potential advisory groups ............................................... 18
     4.4         Training and exercising .................................................................................... 18
5.   Recovery Operations ................................................................................................... 19
     5.1         Disaster effects and reactions of communities .................................................. 19
     5.2         Steps to recovery ............................................................................................. 20
     5.3         Activation process and transition between levels .............................................. 21
6.   Triggers for recovery activation and actions ............................................................. 22
     6.1         Transitioning through phases of Recovery ........................................................ 24
     6.2         Community needs analysis ............................................................................... 24
     6.3         Establish recovery framework ........................................................................... 26
     6.4         Recovery Operational Plan ............................................................................... 26
     6.5         Action plans ...................................................................................................... 29
     6.6         Community engagement strategies .................................................................. 30
     6.7         Managing volunteers ........................................................................................ 31
     6.8         Financial recovery ............................................................................................ 34

Noosa Local Disaster Recovery Subplan 2018                                                                                      Page 1

Section 4

     6.9         Other assistance .............................................................................................. 35
     6.10        Debrief, review and evaluation ......................................................................... 36
7.   Recovery Activities ...................................................................................................... 38
     7.1         Human and social recovery .............................................................................. 39
     7.2         Infrastructure recovery ...................................................................................... 48
     7.3         Economic recovery ........................................................................................... 61
     7.4         Environmental recovery .................................................................................... 69




Noosa Local Disaster Recovery Subplan 2018                                                                               Page 2

Section 5

1. Introduction
This Subplan describes the local interagency arrangements for managing recovery operations
following a disaster event. Recovery planning and operations must be sufficiently flexible to deal
with the needs of the impacted community, regardless of the nature of the disaster.

Recovery planning is integral to disaster preparedness. Planning for recovery operations will
commence well before a comprehensive assessment indicates a particular hazard is likely to
occur, creating exposures and risk that require response and recovery operations.

Capability and capacity planning are essential to ensure effective recovery operations.


1.1. Purpose
The Noosa Recovery Subplan (the Subplan) provides guidance and direction on the preparation
for and conduct of disaster operations in the Noosa Shire.

The Recovery Subplan aims to:
 Ensure recovery operations are integrated and appropriate to the scale of the disaster event
 Outline recovery requirements for operations, planning and arrangements at the local level
 Detail the collaborative and coordinated approach to recovery across all functions of
   recovery, all government stakeholders and whole of community
 Describe the arrangements for transition from response to recovery
 Articulate the roles and responsibilities of the Noosa Recovery Group and the Noosa
   Recovery Coordinator
 Enable optimum recovery outcomes for disaster-impacted communities
 Clarify the roles and responsibilities of functional lead agencies in recovery
 Promote the support and enhancement of resilience through recovery.


1.2. Context
The Noosa Recovery Subplan:
 Is consistent with the Queensland Disaster Management Act, 2003, the Queensland Disaster
   Management Plan and the Queensland Recovery Plan
 Aligns with the Emergency Management Assurance Framework
 Is a subplan to the Noosa Local Disaster Management Plan
 Takes an all-hazards approach to disasters
 Is the primary guidance instrument for disaster recovery in Noosa Shire to enable better
   recovery outcomes for impacted communities.


1.3. Definitions
A Disaster is:
 A serious disruption to a community, caused by the impact of an event, that requires a
   significant coordinated response by the local government and other entities to help the
   community recovery from the disruption.

Disaster recovery is:
 The coordinated process of supporting disaster-affected communities including:
      o their human and social needs (including people’s psychosocial and physical well-
           being)
      o reconstruction of physical infrastructure



Noosa Local Disaster Recovery Subplan 2018                                                 Page 3

Section 6

       o   economic restoration; and
       o   environmental rehabilitation (including regeneration of the natural environment, and
           the management of pollution and contamination).

Relief is:
 Efforts to meet the immediate needs of persons affected by a disaster, to minimise further
   loss through the provision of immediate shelter and basic human needs.

Resilience is:
 A continuous process of learning from experience, reassessment and adaption. In the
   disaster management context, resilience can be considered as a system’s or community’s
   ability to rapidly accommodate and recovery from the impacts of hazards, restore essential
   structures and desired functionality, and adapt to new circumstances.

Further definitions are articulated in the Queensland Disaster Management Act, 2003.


1.4. Legislation
Disaster recovery in Queensland is undertaken in accordance with the Queensland Disaster
Management Act, 2003 (the Act), Queensland Disaster Management Regulation, 2014 and the
Queensland Reconstruction Authority Act, 2011.

Section 4(a) of the Act states that “local governments should primarily be responsible for
managing events in their local government area and (d) district groups and the State Group
should provide local governments with appropriate resources and support to help the local
governments carry out disaster operations.”


1.5. Maintenance of the Recovery Subplan
The Recovery Subplan is maintained by the Local Recovery Coordinator. It is to be reviewed
annually or after activation of recovery processes following an event to ensure it remains current
and relevant. Any proposed changes to the Subplan are to be provided to the Local Recovery
Coordinator, Noosa Shire Council for approval by the Noosa Local Disaster Management Group
(LDMG).


1.6. Abbreviations
 DDC            District Disaster Coordinator

 DDMG           District Disaster Management Group

 LDC            Local Disaster Coordinator

 LDMG           Local Disaster Management Group

 LRC            Local Recovery Coordinator

 LRG            Local Recovery Group

 SRC            State Recovery Coordinator

 SRG            State Recovery Group




Noosa Local Disaster Recovery Subplan 2018                                                 Page 4

Section 7

2. Foundations for Recovery
The need for recovery may arise from a range of events, both natural and man-made. The Noosa
Local Disaster Management Plan identifies 24 possible hazard events, the likelihood of their
occurrence in Noosa Shire and an assessment of the consequence to the community. Following
a disaster, the impact on individuals, families, groups and organisations will differ. Some may be
directly impacted by the event through injury, death or loss of property while others may be
evacuated, emotionally affected or financially affected through loss of employment or livelihood.
The response to a disaster can involve multiple agencies and the community, working together
at the local, district and state levels to deliver recovery outcomes.

Impact assessments commence as soon as it is safe to do so during a disaster to identify
individual and community needs. These assessments enable relief and recovery operations to
be planned concurrently while response operations are underway. This reduces the gap between
response and recovery operations, minimising further unnecessary impact on the community.


2.1. Community-led recovery
Successful recovery is responsive and flexible, engages communities and empowers them to
move forward. Community-led recovery:
 Centres on the community and encourages those affected by an event to actively participate
   in their own recovery
 Seeks to address the needs of all affected communities
 Allows individuals, families, businesses and communities to manage their own recovery, with
   the support of government and the community and private sectors
 Considers the values, culture and priorities of all affected communities
 Uses and develops community knowledge, leadership and resilience
 Recognises that communities may choose different paths to recovery and that communities
   recover at different paces
 Ensures the specific and changing needs of affected communities are met with flexible and
   adaptable policies, plans and services
 Builds strong partnerships between communities and those involved in the recovery process.

Any event that requires significant recovery also provides opportunities to make communities
more resilient for future events. Recovery should be viewed as an opportunity to enhance
disaster resilience.

Effective recovery requires a range of services operating in a coordinated and streamlined way.
The integration of government agencies and government owned corporations, non-government
organisations, industry groups, the private sector and whole-of-community is the foundation of
recovery.


2.2. Four functions of recovery
Effective recovery requires an integrated, multi-disciplinary approach. It commences with
detailed needs analysis, consequence management, community engagement and planning then
moves into service delivery. A coordinated effort by all agencies involved in the recovery process
is necessary. It is a complex and potentially protracted process. To assist in managing
complexity, recovery can be conceptually grouped into inter-related functions applicable in an all
hazards environment:
 Human and social
 Infrastructure (transport, community and private, including housing)
 Economic
 Environment


Noosa Local Disaster Recovery Subplan 2018                                                 Page 5

Section 8

2.3. Principles for disaster recovery
The following principles that guide the Noosa Recovery Subplan are based on the National
Principles for Disaster Recovery detailed in the Australian Emergency Management Handbook
2 – Community Recovery and underpin recovery planning and operations in Queensland:
 Understanding the context
 Recognising complexity
 Using local, community-led approaches
 Ensuring coordination of all activities
 Employing effective communication
 Acknowledging and rebuilding capacity
 Identifying lessons and building resilience.

2.3.1 Understanding the context

Recovery must be relevant to the communities affected. No two disaster events are the same
and the context of each event needs to be taken into account when planning and implementing
recovery programs and activities. Understanding the impacts and circumstances of each
individual event in the broader context of the Noosa Shire is needed to ensure recovery effort
meets the community need.
2.3.2 Recognising complexity

Recovery is complex and dynamic. Information on disaster impact is usually limited at first and
then becomes clearer as time passes. There are diverse and sometimes conflicting needs, wants
and expectations within the community which may also change over time. As a result, priorities
will shift and change. Recovery actions may require a variety of approaches and may leave long-
term legacies.

The four functions of recovery often overlap and the relationship, or balance, between them must
be considered based on the context of the event and the community(ies) affected. This
complexity must be recognised by those developing and implementing recovery programs and
activities.
2.3.3 Using community-led approaches

Recovery should be community-led which requires engaging with communities (listening and
talking). It means empowering the community to be involved and enabling their participation in
the recovery process. Communities who have no say in their recovery will take longer to recover.
Building strong partnerships and involving community leaders in the recovery process will enable
the delivery of recovery programs and activities that are embraced by the community.
2.3.4 Ensuring coordination of all activities

Successful recovery requires a planned, coordinated and adaptive approach based on
continuous assessment of impact and needs. It requires skilled and trusted leadership, clearly
stated shared goals based on desired outcomes, good information gathering and planning
processes, teamwork among all supporting agencies and community groups, and clear decision
making and reporting structures.
2.3.5 Employing effective communication

Effective communication is vital to achieve the above principles. It should be relevant, timely,
clear, accurate, targeted, credible and consistent. Communications with the community must be
two-way and input and feedback should be sought and considered. Information must be
accessible to a variety of audiences in diverse situations using a variety of means. To ensure
communications are effective and relevant an officer from Council’s community engagement
team will be a member of the Local Disaster Recovery Group.


Noosa Local Disaster Recovery Subplan 2018                                               Page 6

Section 9

2.3.6    Acknowledging and building capacity

Successful recovery recognises, supports and builds on community, individual and
organisational capacity. Recovery planners should assess gaps between existing and required
capability and capacity. They should quickly identify and mobilise community skills and
resources and acknowledge that existing resources may be stretched requiring additional
resources to be mobilised. Recovery should consider how to sustain effort over anticipated
recovery timeframes. Opportunities to share, transfer and develop knowledge, skills and training
should be promoted. There should be a clear understanding of when and how to disengage.
Disengagement should be well-planned and communicated.


2.4. Re-establishing resiliency
One of the aims of recovery is to help re-establish individual’s and community resilience and to
build community connections and assets that support this process as soon as possible. This
means developing strategies with individuals, businesses and communities to help them prepare
for possible events and including these arrangements in relevant plans. It means working with
leaders and their networks to understand what can be improved after an event to increase
individual and community resilience. Recovery provides an opportunity to rebuild the community
back stronger and better.


2.5. Post-disaster psychology
All emergencies cause a range of stressors on the individual resulting in a broad range of
responses. Typically, these are ‘normal’ responses to an abnormal event that has touched the
lives of an individual, a family or a community. It is important that those planning recovery and
those implementing recovery services are aware of the psychological effects of disasters in order
to better deliver recovery outcomes.

Immediately following an emergency, people primarily seek practical assistance and reassurance
in an emotionally supportive manner. The emotional impact of traumatic events is very real.
Strong feelings may arise when the experience is talked about. Increased worry may interfere
with day-to-day living and the experience may leave people shaken and worried about the future.
However, most people return to their usual functioning level given time and the support of family
and friends.

It is important to note that individual responses will vary and that the cycle is not necessarily a
single or linear one, but may alter, extend, diminish or re-occur at different times throughout the
recovery process. Friends, family and local recovery support services can all assist in reducing
the frustrations and amount of time people spend in the ‘trough of disillusionment’, or limit the
depth of that trough.

If disaster affected people understand the types of experiences and emotions they may
experience throughout their recovery process, they can establish a stronger understanding that
what they are experiencing is not unusual but is a fairly typical response to a post-disaster
situation. Understanding this may also help people to more strongly understand the transient
nature of these experiences and that they will get through and recover from a disaster. Refer to
Section 5.1 Disaster effects and reactions of communities.




Noosa Local Disaster Recovery Subplan 2018                                                  Page 7

Section 10

2.6. Levels of recovery
Recovery typically goes through three levels:
 Immediate / short-term (relief)
 Medium
 Long-term

These levels are graphically depicted below. Note that the levels commence during response
operations and conclude when normal community development processes are returned. The
period of time for each level will differ depending upon the:
 Nature and scale of the disaster
 Differing inherent qualities and characteristics of the functions undergoing recovery
 Resilience of individuals, families and communities
 Timeliness of recovery operations
 Any subsequent disaster events occurring before the completion of the recovery level.




2.6.1    Immediate / short-term recovery (relief)

Immediate / short-term recovery aims to address and support the immediate needs of individuals,
businesses and the community affected by an event. It often occurs during disaster response
operations and in the cross-over period when the LRG is becoming established.

Immediately after an event there is a need to identify what the impact has been, and what needs
to be done to ensure the safety of life and property, and return the community to normal. This
includes providing services such as:
 Immediate provision of shelter, food, clothing and community services
 Restoration of affected utilities and communications
 Clearance of debris and other hazards resulting from an event.

This level of recovery is challenging as it coincides with response operations. It is the period
after a disaster when initial relief services are offered to the affected community and prior to the
full recovery framework being established. It is also the period when detailed recovery planning,
including needs analysis is undertaken.



Noosa Local Disaster Recovery Subplan 2018                                                   Page 8

Section 11

Relief services provided to the community may take many forms however the operation of
Recovery Centres and Outreach Programs are the primary mechanisms to provide initial
recovery (relief) services and to gather information to support needs analysis and planning for
medium and long term recovery.

The transition from the response and short-term relief operations to the next level of recovery
must be carefully managed by the LDC and the LRC working together.

When it occurs it will be based on a combination of the following criteria:
 The emergency is contained
 Search and rescue groups have ceased activity
 Public safety measures are in place and work effectively
 No further hazard or secondary event is likely in the near future
 Initial rehabilitation has commenced
 Damage to community infrastructure has been assessed and/or restoration has commenced
 Temporary accommodation and services have been provided (if required)
 Local organisations which can provide services and/or a hub for services have been identified
  and engaged
 Local community organisations and cultural groups and their leaders have been identified
  and engaged
 The LRG is established and preliminary recovery plans are in place.

2.6.2     Medium-term recovery

Medium-term recovery continues the coordinated process of supporting affected communities in
the reconstruction of physical infrastructure, restoration of the economy and the environment,
and support for the emotional, social and physical wellbeing of those affected.

The following recovery activities are conducted during this level:
 Ongoing needs analysis so that recovery can support the changing recovery needs of the
   community
 Recovery Action Plans are implemented and progress monitored and reported
 Continued and enhanced community participation in decision making
 Plans are continuously updated to reflect changing recovery needs and progress of recovery.
The recovery activities of this level will assist the affected community to return to a state of
normality although the community is likely to experience changes resulting from the event.

2.6.3   Long-term recovery

Long-term recovery involves the ongoing transition from recovery to normal community life.
During this stage, most recovery workers leave and systems start to wind down as normal
business processes return. It is important that this reduction in recovery support is managed and
that documented arrangements are in place locally to continue to address individual and
community recovery needs.


2.7. Emergency Management Assurance Framework
The four principles for effective disaster management, detailed in the Emergency Management
Assurance Framework are fundamental to the establishment and continuous improvement of
effective disaster recovery operations and planning:
 Leadership
 Public safety
 Partnership
 Performance.


Noosa Local Disaster Recovery Subplan 2018                                                Page 9

Section 12

The Framework has established performance requirements for all entities involved in relief and
recovery and is the basis of assurance activities undertaken by the Office of the Inspector-
General Emergency Management.

The Noosa Recovery Subplan supports the achievement of the standard’s key outcomes
pertaining to planning (component 4), relief (component 13) and recovery (component 14).


2.8. Queensland Disaster Management 2016 Strategic Policy Statement
Recovery activities are also directed by the Queensland Disaster Management 2016 Strategic
Policy Statement and should:
 Strive to safeguard people, property and the environment from disaster impacts
 Empower and support local communities to manage disaster risks, respond to events and be
    more resilient.


2.9. Monitoring and Evaluation Framework
The National Monitoring and Evaluation Framework for Disaster Recovery Programs (March
2016) provides a consistent approach to evaluating individual recovery programs for their
effectiveness in achieving desired outcomes. At the local level, monitoring and evaluating
outcomes from recovery will provide valuable learnings to improve the design and delivery of
subsequent disaster recovery programs.




Noosa Local Disaster Recovery Subplan 2018                                            Page 10

Section 13

3. Recovery Arrangements
Successful disaster recovery requires clear and robust governance arrangements. Noosa’s
disaster recovery arrangements align with those articulated in the Act and enable a collaborative
approach that brings together all agencies, stakeholders and resources for planning and
coordinating delivery of recovery functions.




Queensland’s disaster recovery arrangements reflect the priority given to the impacted
community and the lead role of the Local Disaster Management Group (LDMG) and the Local
Recovery Group (LRG).


3.1     Noosa Local Recovery Group3.1.1                     Roles and responsibilities

The Noosa Local Disaster Management Group (LDMG) has responsibility for acting on behalf of
the community and leading recovery efforts in Noosa Shire. The LDMG will assess the need for
a coordinated, ongoing recovery operation during and/or at the conclusion of the Response
phase. This decision may be based on a range of factors taken into consideration including:
 Scale of the disaster
 Outstanding issues and impacts that require a coordinated multi-agency approach
 Community connectedness is significantly disrupted
 The community’s capability to recovery independently is overwhelmed
 Ability of communities to return to their properties in the long-term
 Reconstruction and/or other impacts such as contamination require a long-term recovery
    plan.

Once the LDMG determines that a planned and coordinated recovery from a disaster event is
required, a LRG is established by the LDMG and the decision is recorded and local recovery


Noosa Local Disaster Recovery Subplan 2018                                               Page 11

Section 14

arrangements are activated. The LRG comprises key decision makers from Noosa Council,
multiple agencies and the community to contribute to the recovery effort.




The LRG will be chaired by the Deputy Chair of the LDMG and recovery operations will be
coordinated by the Local Recovery Coordinator (LRC). The LRG will be supported in its efforts
by relevant State and Australian Government agencies. Depending on the scale of the event
and the complexity of the recovery effort, the LRG may establish up to four separate subgroups
to address each of the four functions of recovery. The LRG will maintain a permanent core
membership of Council officers to lead individual subgroups when they are established. When
the LRG is activated the core group will be augmented by additional members representing the
community, business and the State and Federal Governments.

The number of subgroups, their terms of reference and their membership will be dependent on
the type of event, the needs of the community and the scale of the recovery effort. Local advisory
groups may be formed to ensure community participation in the recovery process and to assist

Noosa Local Disaster Recovery Subplan 2018                                                Page 12

Section 15

the LRG and subgroups in determining community need and service delivery of recovery
programs and activities.

3.1.2   Terms of Reference for Local Recovery Group

Role
The role of the LRG is to coordinate the planning and implementation of recovery strategies
across the four functional groups.

Responsibilities
 Assess the impact of the event and undertake a community needs analysis across the four
   functions of recovery – economic, environmental, human and social, and infrastructure
 Coordinate the whole-of-government and community recovery from disaster events
 Identify and prioritise major areas of recovery
 Establish subgroups as required to coordinate specialist knowledge and expertise
 Develop and implement effective strategies for community participation and partnership in
   the recovery process
 Develop medium and long-term recovery policies and strategies
 Develop and implement a Recovery Operational Plan
 Coordinate the Action Plans developed by the subgroups
 Identify and obtain required resources
 Provide effective leadership to focus all necessary resources to achieve the most effective
   and efficient recovery of affected communities
 Monitor recovery programs and activities undertaken in the Noosa Shire
 Provide regular public information about recovery progress
 Develop a final report at the conclusion of recovery operations

Reporting
The LRG will provide advice and regular reports to the LDMG, the DDC and the State Recovery
Group.

Subgroups
Subgroups are to report regularly to the LRG:
 Coordinator of each subgroup is to attend all meetings of the subgroup and will represent the
   subgroup at meetings of the LRG
 Subgroup is to meet as required at the discretion of the Chair of the subgroup
 Subgroup agendas, minutes of meetings and action plans are to be copied to the Chair of the
   LRG

3.1.3   Core membership of Local Recovery Group

 Recovery Group Role               Representative
 Chair                             Deputy Chair Noosa Local Disaster Management Group
 Local Recovery Coordinator        Director Community Services
 Coordinator Human / Social        Community Development Manager
 Functional Group
 Environment Functional Group      Environmental Services Manager
 Economic Functional Group         Economic Development Manager
 Infrastructure Functional Group   Project Manager Infrastructure Delivery
 Media Liaison                     Community Engagement Manager
 Volunteer Coordinator             Libraries & Galleries Manager
 Administration Support            Community Services Administration Officer
 Dept Communities, Disability      Appointed in liaison with Sunshine Coast District Disaster
 Services & Seniors                Coordinator
 Dept Environment & Science        Appointed in liaison with Sunshine Coast District Disaster
                                   Coordinator

Noosa Local Disaster Recovery Subplan 2018                                              Page 13

Section 16

    Dept Transport & Main Roads      Appointed in liaison with Sunshine Coast District Disaster
                                     Coordinator
    Tourism Noosa                    General Manager Tourism Noosa
    Community Representatives        Appointed on an as-needs basis
    Business and Industry            Appointed on an as-needs basis
    Representatives

3.1.4     Local Recovery Coordinator

The Local Recovery Coordinator (LRC) is appointed as a function within the LDMG to ensure
recovery preparedness and to lead recovery operations. The person appointed as the LRC
cannot be the same person as the LDC or the LDCC Community Liaison Officer as disaster
operations and recovery planning need to occur simultaneously.

The Noosa Council has appointed the Director Community Services to be the Noosa Local
Recovery Coordinator.

The role of the LRC is to:
 Maintain this Subplan
 Develop community recovery preparedness
 Ensure ongoing analysis of need is undertaken throughout the recovery effort to guide the
   recovery effort
 Work with the LRG, relevant agencies and the community to develop the specific aim,
   objectives and strategies of the Recovery Operational Plan
 Liaise with functional lead agency representatives to obtain required support for recovery
   programs and activities
 Manage the implementation of the Recovery Operational Plan and subgroup Action Plans
   with the assistance of the LRG, subgroups, Sunshine Coast District Recovery Group and
   State Recovery Group
 report on the recovery effort to the Disaster District, and the State Recovery Coordinator as
   well as the community

The LRC and the LDC should liaise regularly during disaster response operations. This will
ensure that disaster response operations support the recovery effort and recovery planners have
good situational awareness to ensure their planning is relevant to the community.

The LRC should be involved in disaster response planning and implementation in addition to the
role of leading the recovery effort. This duality of roles immediately after disaster impact is often
inevitable given the limited management resources available within the Noosa Council. While
the LRC may need to be involved in operational response matters from time to time, they should
focus on the recovery implications of such matters to ensure response supports the recovery
effort.

3.1.5     Functional subgroups

Up to four subgroups may be established to address each of the four functions of recovery in
Noosa Shire:

     Human and Social Subgroup
     Infrastructure Subgroup
     Economic Subgroup
     Environment Subgroup

Subgroups are “working groups” of the LRG and comprise the subject matter specialists relevant
to a particular function of recovery. They develop and oversee the implementation of the plans,
activities and programs related to their recovery function.

Noosa Local Disaster Recovery Subplan 2018                                                  Page 14

Section 17

The formation of subgroups is at the discretion of the LRG based on the community recovery
needs analysis. The LRG may decide to merge two or more subgroups together for greater
effectiveness or efficiencies.

Membership of the subgroups shall comprise LRG core members augmented by State and
Australian Government agency representatives, industry bodies and community groups as
required and depending upon the scale of the event and recovery operations required.
Membership of each subgroup is dependent on the situation however a suggested membership
for each subgroup is provided in the subgroup’s terms of reference.

3.1.6   Lead agencies for the functional subgroups

   Human and social – Department of Communities, Disability Services and Seniors
   Infrastructure – Department Housing and Public Works (housing); Department Transport
    and Main Roads (roads and transport)
   Economic – Department of State Development
   Environment – Department of Environment & Science

3.1.7   Local advisory groups

Local advisory groups may be stablished to enable members of the local community, including
people affected by the event and representatives from local organisations, to meet and to provide
input and guidance to the LRG and subgroups on such issues as community needs and service
delivery. The formation and composition of any local advisory group is at the discretion of the
LRG and is dependent on the needs of the community. Members may include:
 Economic – chambers of commerce, progress associations, individual/major businesses
    including primary producers and their representative bodies, suppliers and transport
    operators
 Environment – volunteer land care groups, major primary producers
 Human and social – citizens undertaking material donations services, representatives from a
    range of community organisations
 Infrastructure – progress associations, individual businesses and construction companies,
    community representatives from areas where works are to be undertaken

3.1.8   Meetings of the Local Disaster Recovery Group and subgroups

Outside times of disaster, the LRG shall meet a minimum of twice per annum, generally before
and after the summer season. Once activated by the LDMG, the LRG and subgroups should
meet regularly to perform their functions. Meetings of the LRG shall be at times and in places as
determined by the Chair of the LRG.

3.1.9   Records of meetings

The LRG and each subgroup will keep minutes of all meetings. In addition, the LRG is to develop
and maintain the event-specific Recovery Plan and subgroups are to develop and maintain action
plans relevant to their function. These will be the principle reference documents used by the
LRG and the subgroups in the performance and reporting of their functions.




Noosa Local Disaster Recovery Subplan 2018                                               Page 15

Section 18

3.1.10 Reporting

Regular reporting is required to ensure effective coordination and monitoring of progress and use
of resources.

Upon activation the LRG for Noosa shall report regularly to the LDMG. The LRC will negotiate
with the Sunshine Coast District Recovery Group (DRG) and the State Recovery Group (SRG)
to establish their reporting requirements.

Reporting by the subgroups to the LRG shall be at the discretion of the LRC after consultation
with the LRG and the Chairs of the subgroups.

Report formats may be negotiated, however the LRG is to provide regular updates on the
Recovery Operational Plan to Noosa Council, the DRG and SRG. Subgroups are to provide
regular updates on their Action Plans to the LRG. Reporting formats are to be primarily based
on these two documents. Additional information may be required by the District, the State
Recovery Coordinator or State Recovery Group.


3.2      District Recovery GroupThe principles for disaster recovery are realized by
         ensuring that the entry point for recovery is at the local level. While DDMG’s will usually
         stand down from response operations when recovery operations begin or shortly
         thereafter DDMGs should ensure that recovery arrangements are prepared, planned
         and implemented to support LDMGs in the District.

DDMGs should include representatives from each of the functional recovery lead agencies to
ensure that recovery operations and planning are included in overall disaster management
activities at the district level and to coordinate the provision of State recovery resources within
the District to the affected areas. These services should be coordinated through the LRC using
agreed service delivery arrangements.

DDMG members will often be asked to contribute to the recovery effort through participation on
the LRG or its subgroups as appropriate, though it should be noted that State agencies do not
require approval or permission from the DDC to assist or sit on the LRG subgroups. State
agencies are involved in the LRG as part of their normal business. The LRC can approach any
State agency for assistance.

Ongoing liaison between LRC, the DDC and the DDC’s Executive Officer on recovery matters is
necessary to ensure support from the State through the District is relevant and coordinated.
Reporting on the recovery effort should be provided to the District to assist in coordination and
district level planning.


3.3      State recovery arrangements
3.3.1    Queensland Disaster Management Committee

The Queensland Disaster Management Committee (QDMC) is chaired by the Premier and
governs recovery at a strategic level, with regular reporting on recovery progress from the
Minister responsible for recovery and reconstruction.

3.3.2    Leadership Board Sub Committee (Recovery)

The Leadership Board Sub Committee (Recovery) oversees the implementation of the
Queensland Recovery Plan and event specific disaster recovery plans and oversight on the
planning and implementation of the state’s whole of community recovery activities.



Noosa Local Disaster Recovery Subplan 2018                                                 Page 16

Section 19

3.3.3   State Recovery Coordinator

The State Recovery Coordinator (SRC) is appointed by the Premier and coordinates the recovery
and reconstruction efforts of government and non-government agencies, provides strategic
advice on disaster operations and reports on progress of recovery operations. More than one
SRC may be appointed following severe and/or widespread disasters.

3.3.4   State Recovery Policy and Planning Coordinator

The Chief Executive Officer of the Queensland Reconstruction Authority is the State Recovery
Policy and Planning Coordinator to lead recovery planning, delivery of relief and immediate
recovery operations until the appointment of the SRC and oversees state level preparedness for
recovery operations.

3.3.5   Functional lead agencies

Under the Queensland Recovery Plan, key state government departments are defined as
functional lead agencies for the four functions of recovery. These functional lead agencies are
appointed to assist in the coordination of state level support to the local recovery effort.

 Function               Lead Agency (State and District Level)
 Economic               Department of State Development
 Environmental          Department of Environment & Science
 Human and Social       Department of Communities, Child Safety & Disability Services
 Infrastructure           Transportation infrastructure – Department of Transport &
                            Main Roads
                          Building infrastructure – Department of Housing & Public
                            Works
                          Energy infrastructure – Department of Energy & Water Supply
                          Water and sewerage infrastructure – Department of Energy &
                            Water Supply
                          Water entities – Unitywater
                          Telecommunications infrastructure – Telstra and other
                            telecommunications providers
 NDRRA and         SDRA Queensland Reconstruction Authority
 coordination
 Recovery coordination Queensland Reconstruction Authority
 and monitoring




Noosa Local Disaster Recovery Subplan 2018                                             Page 17

Section 20

4. Planning and Preparing for Recovery
4.1      Local recovery planning
Recovery at the local level requires local knowledge, skilled employees and community
connectedness with communities being actively involved and consulted. Noosa Council, the
LDMG and the LRG works with key local community organisations to plan and lead recovery;
community representatives are at the centre of planning for a community-led approach for a
successful recovery.

Arrangements for recovery are at the local level and are established well before a disaster and
are reflected in the Local Disaster Management Plan. The Local Plan is informed through a risk-
based approach which has taken into account potential exposure to all known hazards. In the
event of a disaster, the LDMG, through the LRG will develop a disaster specific local recovery
plan to drive local recovery efforts.


4.2      Pre-engagement with the community
Improving the community’s disaster resilience will shorten the time it takes for the community to
recover. Noosa Council and the LDMG, in cooperation with State agencies such as Queensland
Fire & Emergency Services and the Queensland Reconstruction Authority, undertake
programmed community disaster resilience initiatives. Ongoing public information specifically
about recovery is provided using normal community engagement media strategies.


4.3      Pre-engagement with potential advisory groups
Contact with prospective members of local advisory groups can be undertaken to tell them of the
possible formation of such groups and their possible involvement. Prior engagement with
prospective members of advisory groups familiarises them with the Noosa recovery framework
and provides an opportunity for network building. The Noosa LDMG will consider an ongoing
program of pre-engagement with potential local advisory groups.


4.4      Training and exercising
In accordance with section 16A(c) of the Act, it is a requirement that persons performing functions
under this Act in relation to disaster operations are appropriately trained. The Queensland
Disaster Management Training Framework outlines the recovery courses and training to be
undertaken by key disaster management stakeholders to support the effective performance of
each identified role within each phase of disaster management. Access to these courses is made
through contact with the appropriate local Queensland Fire & Emergency Services (QFES),
Emergency Management Coordinator.

A recovery exercise is held as a component of the annual LDMG Local Disaster Coordination
Centre exercise.




Noosa Local Disaster Recovery Subplan 2018                                                 Page 18

Section 21

5. Recovery Operations
Community members are often the first responders during a disaster and take actions to save
and protect themselves, their families, their communities and their property. In the majority of
disasters, disaster-affected communities and local governments commence recovery processes
while response operations are being conducted. The triggers and timings to tailor planned
recovery operations for a specific event will vary between disasters.


5.1      Disaster effects and reactions of communities
The reactions of individuals and the community to a disaster will vary depending on the scale
and scope of the event, as well as their levels of disaster preparedness and resilience.




Typically, the community will experience the following phases of reactions to a disaster which
must be recognised and managed accordingly during recovery operations:

Pre-disaster Phase: the amount of warning a community receives and the perceived threat
varies depending on many factors, such as preparedness, resilience, social cohesion and level
of trust in disaster management arrangements and service providers.

Impact Phase: the scale and scope of the disaster influences the community’s reactions. The
larger the event and extent of personal and community loss as a result of the disaster, the greater
the psychosocial effects.

Heroic Phase: this phase is characterised by high levels of self-sacrifice by survivors and
emergency responders.

Honeymoon Phase: usually occurs in the following weeks and months and is evidenced by a
short-lived sense of optimism by the disaster survivors.




Noosa Local Disaster Recovery Subplan 2018                                                 Page 19

Section 22

Disillusionment Phase: as time progresses, survivors tend to progress through an inventory
process in which the limits of available disaster assistance are realised and they recognise the
reality of their situation. Triggers, such as the anniversary of the disaster, can initiate negative
emotions related to the disaster as survivors relive their experiences.

Reconstruction Phase: set-backs are experienced by survivors as they go through their grief
and feeling of loss, eventually readjusting to their new surrounding situations.

The cumulative nature of impacts from previous disasters must also be considered when
planning and delivering recovery activities.


5.2      Steps to recovery
Recovery is a progressive activity that involves many steps. The timeframes for each of these
steps is dictated by the situation:

   Recovery             Phase                        Actions and Tasks                          Remarks
     Step
                                                                                             Ongoing under
                                                                                             the direction of
                                         Undertake recovery preparedness including
 Pre-event                                                                                   the LDMG, LRC
                   Pre-event phase       training, exercises, network management, and
 preparedness                                                                                and core
                                         community engagement.
                                                                                             members of the
                                                                                             LRG.

                                     DISASTER EVENTT
                                         LDMG resolves to form a LRG and appoints the
                                         LRG Chair (usually the Deputy Chair of the          Commence
                                         LDMG) depending upon the impact of the event        communication
                                         and the primary recovery requirements.              with
                                                                                             stakeholders.
                                         Establishment of the LRG and identification of
                                         possible stakeholders to be included on the         Distribute
                                         LRG.                                                Situation Reports
                                                                                             (may be formal or
                                         Build situational awareness within the LRG and      informal)
                                         agencies / organisations supporting recovery.
                                                                                             Recovery is
                                         Work with response operations in the LDCC to        represented in
                                         influence operational decisions that have           the decision
                                         recovery implications; and to build situational     making
                                         awareness for recovery planning.                    processes for
                                         Oversee and coordinate the ongoing provision of     disaster
                   Post impact relief    short term recovery (relief) services to impacted   response.
                   and early recovery    communities.
 Activation        (immediate - short-                                                       This is an
                   term) phase           Undertake analyses of community need across         iterative process
                                         the four function groups of recovery and/or by      and the analysis
                                         sectors. Engage widely across the community         will change over
                                         to ensure analysis is comprehensive.                time as
                                                                                             situational
                                         Establish Recovery Framework.                       awareness
                                                                                             improves
                                         Finalise membership of LRG to include
                                         community and state agency representatives.
                                         Establish subgroups and local advisory groups
                                         as dictated by needs analysis.
                                         Document and distribute a Recovery Operational
                                         Plan.                                               These steps are
                                                                                             often undertaken
                                         Maintain plan throughout recovery process.          concurrently.
                                         Subgroups develop action plans for their
                                         function.




Noosa Local Disaster Recovery Subplan 2018                                                             Page 20

Section 23

      Recovery            Phase                       Actions and Tasks                          Remarks
        Step
                                                                                              This process may
                                                                                              go for many
                                          Continue to deliver recovery services as outlined   weeks or months
                                          in the Recovery Operational Plan and as             (or years in
    Continued        Recovery and
                                          detailed in subgroup action plans.                  extreme cases).
    activation       reconstruction
                     (medium to long      Maintain and update the Recovery Operational        The LRG must
                     term) recovery       Plan and subgroup action plans as recovery          strive to sustain
                                          progresses.                                         effort in
                                                                                              accordance with
                                                                                              priorities.
                                                                                              Must have
                                                                                              transitional
    Staged                                Progressively close:                                arrangements in
    withdrawal /     Transition to long      Local advisory groups                           place.
    standing down    term recovery
                                             Close subgroups                                 Suitable alternate
                                             Close LRG                                       process must be
                                          Debrief/review/evaluation of the recovery effort.   in place to
                                                                                              support long term
                                          Submit final report on recovery to the LDMG         recovery needs.
                                                                                              Update plans.



5.3         Activation process and transition between levels
The recovery process is activated in the same manner as disaster operations through four levels
of activation:

     Alert
     Lean Forward
     Stand Up
     Stand Down

The LRC is to be notified once the LDMG goes to Lean Forward, or in rapid onset events, when
the LDMG is activated to Stand Up. This is to ensure that the recovery framework can be
established based on the emerging and anticipated needs of the community. The LRG needs to
have a representative present at the LDCC intelligence cell (usually the LRC) when the initial
damage assessments are undertaken. This will assist the LRG in developing their Recovery
Plan. It also ensures that disaster operations consider the needs of recovery during the response
phase.

This diagram depicts the activation of recovery relative to response.




Noosa Local Disaster Recovery Subplan 2018                                                              Page 21

Section 24

6. Triggers for recovery activation and
   actions
The table below details the major recovery triggers, actions and communication requirements
applicable to each level of activation. Note that the levels of activation are aligned with the three
levels of recovery – short, medium and long term.



                                                                                Triggers                     Actions                       Communications
  Response




                                                                           LRG inactive when
                                                                                                 Watching brief by members           Nil
                                                                           LDMG is at Alert
  Alert




                                                                           LDMG ‘Lean            LRG ‘Alert’ level.                  Whispir notification of Alert
                                                                           Forward’ level of     The LRC is briefed by the LDC       distributed to LRG
                                                                           activation.           when the initial damage             members.
  Response Lean Forward




                                                                                                 assessment functions are            LDC maintains
                                                                                                 undertaken during response          communication with LRC
                                                                                                 operations. This will assist the    who in turn liaises with core
                                                                                                 LRC in developing their recovery    members of the LRG.
                          Recovery Alert




                                                                                                 plan.                               Ad hoc reporting as
                                                                                                 Core members of the LRG self-       required by the LDC.
                                                                                                 activate and commence to gain
                                                                                                 situational awareness of the
                                                                                                 event.

                                                                           ‘Stand Up’ of LDMG.   LRG ‘Lean Forward’ level.           Whispir notification of Lean
                                                                           LDMG assesses         DDC and SRG informed of             Forward distributed to LRG
                                                                           event impact and      establishment of LDMG               members.
                                                                           decides to activate   response commences.                 LRC and LRG members in
                                                                           the LRG.              LRC monitors response activities    routine contact and
                          Recovery Lean Forward \ transition to Stand Up




                                                                           Immediate Relief      analyses hazard impact or           monitoring email remotely.
                                                                           arrangements are      potential impact.                   LRG has an initial meeting
                                                                           put in place.         Relief and recovery planning        for planning purposes.
                                                                                                 commences through needs             More regular reporting as
                                                                                                 analysis and recovery               required by the LRC and by
                                                                                                 operational planning.               the DDC and SRG.
                                                                                                 LRC and subgroup structures         Community engagement
                                                                                                 finalised along with reporting      and communication
                                                                                                 requirements.                       strategy developed by
                                                                                                 Deployments for immediate relief    LRG.
                                                                                                 may be commenced by recovery
                                                                                                 functional agencies.
  Response Stand Up




                                                                                                 Completion of initial needs
                                                                                                 analysis, finalisation of LRG and
                                                                                                 subgroup membership and issue
                                                                                                 of Recovery Operational Plan
                                                                                                 signal readiness to move the
                                                                                                 LRG to Stand Up and
                                                                                                 commence medium term
                                                                                                 recovery operations.




Noosa Local Disaster Recovery Subplan 2018                                                                                                                  Page 22

Section 25

                                                   Triggers                       Actions                     Communications


                                              Immediate relief         LRG at Stand Up.                    Whispir notification of
                                              arrangements             Transition arrangements from        Stand Up distributed to
                                              continue.                ‘response and relief’ to ‘medium    LRG members.
                                              Medium term              term recovery’ undertaken           LRG and subgroups meet
                                              recovery                 including formal hand over from     regularly.
                                              commences.               LDC to LRC.                         Community engagement
                                              Response phase           LRG activated to operate from       and communication
                                              moves to ‘Stand          Noosa Council offices.              strategy implemented.
                                              Down’.                   DDC and SRG informed of the
                                                                       activation level of the LRG and
                                                                       transitional arrangements.
                                                                       Deployments from functional
                                                                       agencies continue to provide
                                                                       immediate relief response.
  Response Stand Down




                                                                       Action plans developed
                        Recovery Stand Up




                                                                       addressing the four functions of
                                                                       recovery.
                                                                       Participate in response debrief.
                                                                       Action plans monitored and
                                                                       acted on.
                                                                       Regular reporting to the Noosa
                                                                       LDMG the DDC and the SRG
                                                                       continues.
                                              LRG completes its        LRG at Stand Down.                  Whispir notification/s as
                                              tasks contained in       LDMG, DDC and SRG informed          LRG Stands Down.
                                              the Operational          of date for LRG to stand down.      As action items in the
                                              Plan.                    Financial records consolidate.      recovery plan are
                        Recovery Stand Down




                                              The community            Reporting requirements finalised.   completed LRG members
                                              returns to normal        Participate in recovery review      and ultimately the LRC
                                              activities with          and assessment.                     resume standard business
                                              ongoing long term        Long term recovery                  arrangements.
                                              recovery support         arrangements transferred to         LRG stands down.
                                              provided as required     functional lead agencies
                                              under pre-agreed         including Council.
                                              arrangements and         Return to core business
                                              processes.
                                              The LRG can be           The LDMG or the Chair of the        Chair of LRG seeks
                                              reconvened after it      LRG can reconvene the LRG if        approval of LDMG to
                                              has stood down from      required.                           reconvene .
                                              an event if new          The LDMG is informed that the
                                              issues come to light     LRG will reconvene.
                        RECONVENE RECOVERY




                                              e.g. identification of   The reconvened LRG to consult
                                              primary producers'       with LRC for briefing and
                                              hardship some            handover
                                              weeks after the
                                              event
                        COMMITTEE




Noosa Local Disaster Recovery Subplan 2018                                                                                       Page 23

Section 26

6.1     Transitioning through phases of Recovery
The transition from response operations to recovery operations will be influenced by the nature
of the disaster and therefore requires a degree of flexibility.

The transition will be informed by the circumstances and determined by the chair of the LDMG.
Transition will be guided by:
 Situation reports which evidence the de-escalation of response operations
 Status of response and immediate recovery/relief operations
 Impact and needs assessments
 Response and early recovery situations that may escalate
 Anticipated recovery issues and risks.

6.1.1   From immediate / short-term relief to medium level recovery

The following tasks need to be completed before recovery moves from immediate / short-term to
medium term:
 Community needs analysis across the four functions of recovery that define the
   community’s recovery needs and which establishes priorities for the recovery effort and the
   resources required. This needs analysis will continue to be updated through the recovery
   process.
 Membership of the Local Disaster Recovery Group is finalised, as are reporting
   requirements to the LDMG, the DDMG and the SRG.
 Subgroups are established as required and membership and terms of reference for each
   are confirmed.
 Recovery Operational Plan outlining the aim, objectives and strategies for the recovery
   effort is finalised.
 Community Engagement Strategy is finalised and detailed in the Recovery Operational
   Plan.
 Subgroup Action Plans are well developed and outline relevant recovery programs and
   activities.

6.1.2   Transitioning to long-term recovery

Long-term recovery requires the State Government functional lead agencies, Noosa Council and
the community to put in place systems and processes that ensure the ongoing provision of
recovery support to those who need it after the departure of recovery workers from the disaster
area. These arrangements should be included in the Recovery Operational Plan and subgroup
Action Plans.


6.2     Community needs analysis
Community need is the driver for all recovery operations. It is imperative that analysis of
community need is undertaken and regularly reviewed to ensure recovery operations are
correctly focused and resourced.

The purpose of a community recovery needs analysis is to pull together information into a single,
consolidated report. It should contain information on the physical impacts of a disaster, the
economic value of the damages and losses, the human impacts as experienced by the affected
population, and the resulting medium and long-term recovery needs and priorities. Needs
analysis begins when the recovery process is first activated and continues through all levels of
recovery. Stand down from recovery is possible only when all community needs have been met
or where normal processes are in place to meet ongoing community recovery needs.




Noosa Local Disaster Recovery Subplan 2018                                               Page 24

Section 27

Needs analysis is about assessing what has changed within a community from the normal
baseline and what programs and activities must be undertaken to assist the community to return
to normal. These assessments, from which the needs analysis is done, are generally
commenced during disaster response operations.

Community needs analysis underpins the development of the Recovery Operational Plan.
Ongoing needs analyses throughout the recovery process will inform the evolution of this plan
through the three levels of recovery (short – medium – long-term).

The LDC is responsible for ensuring that a rapid damage assessment and a preliminary
community needs analysis is undertaken prior to the establishment of the LRG. The LRC and
the LRG are responsible thereafter to ensure that ongoing needs analysis are undertaken to
inform the transition between the three levels of recovery. Community needs analysis relies on
the experience and local knowledge of the members of the LDMG, the LRG, subgroups and the
local advisory groups combining to identify all aspects of community need throughout the
recovery effort. Those undertaking needs analysis must have a sound situational awareness
emphasizing the need for early activation of recovery during the disaster response phase and
effective communications throughout recovery.

Impact assessments and rapid damage assessments undertaken to support disaster response
operations    are      a      foundation   of     community       needs         analysis.

6.2.1   Format and process for community needs analysis

There is no prescribed format or process for the conduct of community needs analysis following
a disaster event as each function of recovery will need to apply specific processes to determine
need relevant to their function. For example, the process and considerations for an economic
needs analysis (economic impact assessment) will be significantly different to that undertaken in
the environment, infrastructure or the human and social functions of recovery. Each of them will
also be different to the others.

6.2.2   Undertaking needs analysis by sectors

Needs analysis may also be undertaken by community sectors. This table details the community
sectors that may be considered when undertaking community needs analysis using a sector-
based approach. The LRG may need to engage with representatives from these sectors when
undertaking needs analysis:


  Health, Aged Care     Education            Industry & Retail       Essential Services

                                             Transport           &
  Sport & Recreation    Retail & Business                            Communications
                                             Distribution

                                                                     Community
  Rural Residential     Urban Residential    Energy
                                                                     Services

  Tourism         and                        Individuals     and Emergency
                        Primary Producers
  Recreation                                 Families            Services
  Environmental
                        Building             Youth
  Care

Selection of the correct people to the LRG and subgroups is important. Development of
appropriate local advisory groups with well thought-out and diverse representation from the
community will assist greatly in undertaking community needs analysis.


Noosa Local Disaster Recovery Subplan 2018                                                Page 25

Section 28

6.3      Establish recovery framework
The Chair of the LRG will likely need to augment the core membership of the Group to ensure
representation by those who will contribute resources and services to the recovery effort as
defined in the needs analysis. Such representatives should have appropriate authority within
their organisation to mobilise resources and services in support of recovery. Supporting
organisations that may assist in recovery are identified in the Terms of Reference for the LRG
and individual subgroups.


6.4      Recovery Operational Plan
The Recovery Operational Plan is a strategic level document developed during the Lean Forward
and Stand Up stages of recovery activation. It is prepared by the LRC with input from the LRG,
its subgroups and the community and is approved by the LDMG. It details the recovery:
 Aim
 Objectives
 Strategies
to add address identified community needs across the four functional groups of recovery.

The LRG, subgroups and local advisory groups are responsible for assisting the LRC implement
the Recovery Operational Plan. Implementation is through action plans developed and
maintained by each subgroup.

The Recovery Operational Plan is a dynamic document that is reviewed and updated regularly
to reflect the changing circumstances as defined by ongoing community needs analysis. It should
be version controlled.

Recovery operational planning is similar to response operational planning in that it is a strategic
plan specific to the event and the recovery requirements identified during community needs
analysis. It is the primary mechanism used to ‘operationalise’ the recovery effort.

For ease of production, the Recovery Operational Plan may be developed and distributed in the
SMEAC format used for response operational plans.

                          An analysis of the current and projected situation to determine:
                           impact of the disaster across the four functional groups of recovery
                               and/or by sector
                           analysis of community needs across the four functions e.g. analysis of
  Situation
                               the difference between the normal community baseline and the
                               current situation.
                           opportunities and challenges arising from the needs analysis
                           key timeframes relevant to recovery operations
                          What we have to do.
  Mission (Aim &          It includes the aim of the recovery effort and may include several
  Objectives)             objectives to be achieved. Objectives should be S.M.A.R.T e.g. Specific,
                          Measurable, Achievable, Relevant and contain a Timeframe.
                          A description of how we are going to undertake recovery across the four
                          pillars of recovery.
                          These are broad statements of intent that are amplified in subgroup action
  Execution               plans.
                          Detail the agencies who will contribute to the recovery effort and the
                          services they will need to offer.
                          Specify performance indicators.

  Administration and      How we intend to resource and administer the strategies above. Specify
  Logistics               extraordinary resourcing or logistics necessary.




Noosa Local Disaster Recovery Subplan 2018                                                    Page 26

Section 29

                          Outline the recovery framework adopted for this event and detail
                          membership of the LRG, subgroups and local advisory groups.
  Coordination
                          Outline communications strategy.
  Communications
                          Specify reporting requirements for the LRG, subgroups and local advisory
                          groups.


The Recovery Operational Plan should be provided to all stakeholders involved in community
recovery including the Noosa Council, DDC, SRC and SRG. Copies may be provided to statutory
bodies established by the State, e.g. the Queensland Reconstruction Authority.

6.4.1   Example format of a Recovery Operational Plan

                    NOOSA LOCAL DISASTER RECOVERY GROUP
                           Recovery Operational Plan

 1. EVENT NAME:
 2. VERSION Number &
    DATE / TIME (Plan
    Effective):
 3. SITUATION: (impact assessments and outcomes of community needs analysis)

 General Background:


 Human / Social


 Infrastructure


 Economic


 Environment

 4. RECOVERY MISSION (AIM. A single statement of purpose for the recovery operation. Should
    encompass medium and long term view. Consider inclusion of improvement.)


 5a. OBJECTIVES: (SMART: Specific, Measurable, Achievable, Relevant, Time-framed)
               Objective:

 Human and        Objective:
 Social
                  Objective:

                  Objective:

                  Objective:
 Infrastructure
                  Objective:

                  Objective:

                  Objective:
 Economic
                  Objective:


Noosa Local Disaster Recovery Subplan 2018                                                   Page 27

Section 30

                   Objective:

                   Objective:
 Environment
                   Objective:

 5. EXECUTION: (provide general overview of intent for recovery operations across the four pillars of
    recovery. Define major programs and activities for medium and long term recovery)




 6. Execution Strategy Statements (specify strategies to be used to achieve each objective. Define
    objectives as medium or long term. Include Key Performance Indicators for each strategy)
                  Objective
                  Number
                   Objective
 Human/Social
                   Number
                Objective
                Number
                Objective
                Number
                Objective
 Infrastructure
                Number
                Objective
                Number
                Objective
                Number
                Objective
 Economic
                Number
                Objective
                Number
                Objective
                Number
                Objective
 Environment
                Number
                Objective
                Number
 7. ADMINISTRATION AND LOGISTICS (Resourcing)

 Key Agencies involved:

 Additional Resources:

 Recovery Funding:

 8. COORDINATION/COMMUNICATIONS (Management, Communication and Reporting)

 Noosa Recovery Framework (provide details on)
     LDRC
     Membership of LRG
     Subgroups
     Local advisory groups

 Recovery Centres/ One Stop Shops and/or Outreach Services

 Community Engagement Strategies (scalable depending on size and nature of event)

 Meeting and Reporting Requirements

 Recovery Contact List (Appendix –in confidence-)


Noosa Local Disaster Recovery Subplan 2018                                                     Page 28

Section 31

 Prepared by: <Name>                                  Plan Endorsed:
 <Date/Time>                                          <Name>
                                                      Local Recovery Coordinator
                                                      <Date/Time>

Attachments:
1.      <add attachments as required>
Plan Distribution:
<enter distribution>


6.5           Action plans
Action plans are the primary tool used by subgroups to manage the recovery effort. They too are
a mechanism to operationalise the recovery effort. Action plans are the detailed plans developed,
maintained and implemented by individual recovery subgroups. Each subgroup’s action plan will
specify the programs, activities, agencies, resources and timeframes required in order to achieve
the objectives and strategies specified in the Recovery Operational Plan. Routine reporting by
the subgroup to the LRG on the progress of their action plans is required to ensure the overall
recovery effort is proceeding as planned.

6.5.1         Example format of an Action Plan


                              Action
  Priority




             Issue or Need      to      Lead     Supporting     Resources    Time   Supporting
               (objective)   Address   Agency   Organisations    Required   frame   Information
                              Need




Noosa Local Disaster Recovery Subplan 2018                                                 Page 29

Section 32

6.6      Community engagement strategies
The LRC and the LRG must consider the community engagement strategies that will be needed
to ensure the community is involved and effectively contributes to the recovery effort. The LRG
should consider the stakeholders and how best to engage with them during the stages of recovery
planning. Community engagement for recovery should use the community egagement
processes as detailed in the Local Disaster Management Plan. They should be documented in
the Recovery Operational Plan. Two specific strategies to engage with the community during
recovery are:
 local advisory groups
 public forums or community meetings.

6.6.1    Local advisory groups

Forming local advisory groups is often an effective way of involving the community in the recovery
effort. These groups may be geographically based or they may be functionally based e.g.
economic, environmental, infrastructure or human and social. The formation, composition and
terms of reference of these local advisory groups will depend on the needs of the community and
the willingness, and capacity, of the community to participate.

They are formed at the discretion of the LRG and subgroups as required. Local advisory groups
have no defined structure or governance arrangements. They may have a pre-defined
membership or be ad-hoc in nature. They provide a mechanism to enable effective engagement
with the community for planning and decision making.

6.6.2    Public forums and community meetings

Public forums and/or community meetings may be called in order to listen to and talk with
communities affected by the disaster. They are useful in the needs analysis process and should
be undertaken throughout recovery to maintain public dialogue, resolve issues and to gauge
recovery progress.

Public forums are often specific to a particular function e.g. a public forum for businesses that
are economically affected by the event or land owners affected by environmental issues arising
from the disaster. Community meetings are usually geographically focused and often cover a
broad suite of issues across the four functions of recovery. They are conducted at the discretion
of the LRG and subgroups as required. Local advisory groups may augment public forums and
community meetings.

It is important that such meetings or forums are accessible, well promoted and involve community
and business leaders who can disseminate information to and from the community.

It can be valuable, where possible, to identify and utilise existing community events or activities
where the community gathers rather than initiate an additional activity that the community may
be hesitant to attend that is not a community environment that they feel comfortable with and
trust.




Noosa Local Disaster Recovery Subplan 2018                                                 Page 30

Section 33

6.7      Managing volunteers
Noosa Council will act as the managers of spontaneous volunteers within the Noosa area, within
local capacity. The long-term recovery period in disaster situations presents volunteer
management challenges that include maintaining the motivation of disaster response volunteers,
developing strategies to mobilise new volunteers for the recovery period, and organising large-
scale volunteer efforts for clean-up and rebuilding.

6.7.1    Noosa volunteer philosophy

Recovery planning in Noosa recognises the role of volunteers in community recovery.
Volunteering often emerges spontaneously within a community and coordination and support is
required to maximise outcomes for both the volunteers and those that receive volunteer
assistance.

Volunteer coordination is a function of the Human and Social Subgroup. The Subgroup is
responsible for promoting, coordinating and supporting the volunteer effort with the assistance of
the other subgroups as required.

The Subgroup will work closely with Volunteering Queensland and other volunteer organisations
including not-for-profits to develop appropriate volunteering programs and supporting
frameworks to assist the community where practicable.

Volunteer management on the ground e.g. briefings, tasking, resource support, safety etc is to
be undertaken by Council and/or non-profit organisations with the appropriate insurance, policies
and procedures for effective and safe volunteer management.

The LRG will monitor and report on volunteer effort within the community including providing
public information on volunteer progress and outcomes.

6.7.2    Setting objectives for volunteer effort

It is likely that a range of volunteer programs will be needed to address diverse needs in the
community. For example, volunteers may assist in urban clean up, farm debris removal and
fencing, environmental care projects, provision of psychosocial support, recovery event
management, provision of specialised or technical work, or management of donated goods.
Matching volunteer availability and skill and resources will be required across diverse functions
that operate over different timeframes. For example, farm fence repair may be undertaken over
months whereas clean up of community infrastructure will often need to be completed in the
immediate aftermath of a disaster.

It is important for the LRG and the subgroups to clearly define objectives for the volunteering
effort to assist planning and to enable the matching of volunteers’ availability and skills with tasks
on the ground. Volunteering programs, recruitment and management can then be undertaken to
achieve those objectives.

Objectives should be SMART i.e. Specific, Measurable, Achievable, Relevant and include a Time
Frame. Volunteer objectives may be short, medium or long term. Long term volunteer objectives
should be developed to ensure that volunteer effort can be managed to support the long term
recovery of the community.

A volunteer management plan should be developed and endorsed by the LRG. It should be
updated regularly to reflect the changing volunteer environment.




Noosa Local Disaster Recovery Subplan 2018                                                   Page 31

Section 34

The LRC or the Volunteer Coordinator, on behalf of the LRC, may consider the following when
planning and developing volunteer objectives and the programs to achieve them:

   Initial clean up (mud army)
   Farm clear and fence repair programs
   Pet foster care
   Wildlife care and treatment
   Donations management and closure of donation centres
   Psychosocial support
   Assistance in community recovery event management
   Environmental care
   Support to community organisations for rebuilding / repairs
   Support to businesses for rebuilding / repairs
   Creative fund raising for identified public appeals
   Technical or specialised work or advice
   Assistance in transport of goods and/or donations


6.7.3    Coordinating volunteer effort

A Volunteer Coordinator may be required to assist the LRG in planning and implementing
recovery volunteer programs and activities and the LRG should consider the need for such an
appointment early in the recovery process. The appointment of a Volunteer Coordinator provides
a central point of contact within the community for volunteer matters and enables volunteer effort
to be closely coordinated, monitored and reported. If a Volunteer Coordinator is deemed
necessary by the LRG, the LRC will liaise with the Noosa Council CEO to appoint a suitable
council staff member to the role.

It should be noted that such an appointment may need to be on a full-time basis during the initial
planning and development of volunteer programs and activities. The workload of a Volunteer
Coordinator is likely to decrease as longer term programs are established e.g. once the
volunteering effort has settled into a routine.

6.7.4    Roles and responsibilities of Volunteer Coordinator

Role
To plan for, coordinate, monitor and report on volunteer effort to support community recovery on
behalf of the Local Recovery Coordinator.

Responsibilities
 Assist in the development and implementation and maintenance of the volunteer
   management plan endorsed by the LRC
 Assist in promotion of volunteering opportunities as defined in the volunteer management
   plan
 Maintain volunteer documentation and records
 Match offers of assistance to identified community recovery volunteer needs
 Work with Volunteering Queensland and other volunteer providers and registered non-profit
   organisations to ensure volunteers are identified, engaged, coordinated and managed
   effectively
 Provide public information on recovery volunteering needs, and the progress of recovery
   volunteering programs and activities
 Identify opportunities and implement strategies to recognise volunteers
 Report regularly to the Chair of the Human and Social Subgroup on the implementation of
   the volunteer management plan



Noosa Local Disaster Recovery Subplan 2018                                                Page 32

Section 35

As a guide, the Volunteer Coordinator will be expected to report and provide advice on:
 The community need for volunteers to support recovery (assisted by other subgroups)
 Offers of assistance within the community and how effectively such offers are able to be
   matched to community need
 Availability of volunteers and strategies to overcome volunteering shortfalls
 Resources required to support volunteers

6.7.5    Working with volunteer organisations

The Chair of the Human and Social Subgroup and/or the Volunteer Coordinator will work closely
with Volunteering Queensland and other volunteering bodies to develop relevant and achievable
recovery programs and activities. These bodies are critical to effective volunteer management
in Noosa Shire as they offer the mechanisms and protection needed to effectively use volunteers
in response and recovery. Volunteering Queensland is the primary body charged with volunteer
registration and referral in Queensland.


6.7.6    Recognising and supporting volunteers

While volunteers do not participate for the sole purpose of reward or recognition, it is important
to acknowledge and thank volunteers for their time and efforts. Recognising and celebrating
volunteers also supports ongoing participation and promotes volunteering in the community.

The LRG should consider ways to recognise volunteer effort throughout recovery. Often this is
best done through providing stories of volunteering in local media and on Council’s website and
Facebook page. Conducting functions, barbeques and local award ceremonies should be
considered and undertaken wherever practicable. Visits to volunteers in the workplace by
community leaders should be undertaken regularly to recognise volunteers.

6.7.7    Maintaining volunteer documentation and record-keeping

The Chair of the Human and Social Subgroup or the Volunteer Coordinator should maintain
documents and records relating to the volunteer effort. These may include but are not limited to:

   Volunteer Management Plan including agreements between the LRC and individual volunteer
    organisations
   Community volunteer needs register that records the volunteer needs within the community
    and enables the matching of need to offers of assistance
   Community offers of assistance register that records offers of assistance from the community
    and enables matching of offers to community volunteer need
   Register of pet foster care providers and those who need such services to assist in ensuring
    effective pet foster care services
   Register of suitable non-profit organisations both locally and those offering services from
    outside the local government area
   Register of donation centres established by the community following a disaster to assist in
    determining how these centres may be progressively closed down




Noosa Local Disaster Recovery Subplan 2018                                                Page 33

Section 36

6.8     Financial recovery
6.8.1   Natural Disaster Relief and Recovery Arrangements (NDRRA)

The NDRRA is the Australian Government program intended to assist the recovery of
communities whose social, financial and economic wellbeing has been severely affected by a
natural disaster or terrorism event. These arrangements provide a cost sharing formula between
the Queensland and Australian Governments on a range of pre-agreed relief and recovery
measures.

Further information on NDRRA is available from the Queensland Reconstruction Authority
website: http://qldreconstruction.org.au/ndrra.

6.8.2   State Disaster Relief Arrangements (SDRA)

The SDRA is an all hazards relief program that is 100% State funded and covers natural and
non-natural disasters. The purpose of the SDRA is to address personal hardship and community
response needs for disaster events where the NDRRA is not activated.

6.8.3   Federal Disaster Arrangements

Disaster Recovery Payment (DRP)
When a major disaster has had such a significant impact on individuals and families that
assistance over and above the measures available under NDRRA is needed, the Australian
Government may provide the Disaster Recovery Payment which is a one-off recovery payment.
The DRP is a non-means tested payment of $1,000 for eligible adults and $400 for eligible
children who have been adversely affected by a major disaster either in Australia or overseas.

The DRP is administered by the Department of                 Human    Services.     Refer   to
www.disasterassist.gov.au website for further information.

Disaster Recovery Allowance (DRA)
The DRA is a short-term income support payment to assist individuals who can demonstrate their
income has been affected as a direct result of a disaster. When available, the DRA assists
employees, small business persons and farmers who experience a loss of income as a direct
result of a disaster event.

The DRA is administered by the Department of                 Human    Services.     Refer   to
www.disasterassist.gov.au website for further information.




Noosa Local Disaster Recovery Subplan 2018                                            Page 34

Section 37

6.9      Other assistance
6.9.1    Donations and spontaneous volunteers

Following disasters, it is often the case that offers of assistance such as financial, goods and
services or volunteers to assist start to overwhelm the affected area. A large influx of donations
or volunteers often results in problems such as:
 Stewardship
 Proper disbursement
 Disposal of goods that did not fit the needs of the affected community
 Storage issues
 Health issues relating to donated food
 Difficulty arranging effective means of donation transportation or delivery
 Inability to match offers of services with current needs.

Goods - In order to assist with the management of donations to affected communities following
a disaster event, the LRG will work with GIVIT, a not-for-profit organisation, to manage all
donations of material items for the disaster. GIVIT will accept pledges of donations from
individuals and businesses via its website at www.givit.org.au and then work with charity and
front line services to access donated goods and services.

Cash - Ultimately the best and most versatile way of helping disaster affected communities is
through a cash donation to a reputable disaster relief agency. Previous experience has shown
that it is best for a local government to avoid establishing an ‘in house’ collection of donated
funds, such as a Mayor’s appeal fund. The effort required to effectively collect, manage,
distribute and account for funds is onerous, especially when Council’s resources are already
being fully utilised in other recovery activities.

Volunteers – spontaneous volunteerism can be a valuable resource in recovery if properly
managed. During the initial / short-term recovery phase, the LRG will appoint a Volunteer
Coordinator to plan for, coordinate, monitor and report on volunteer efforts.

All efforts will be made to show appreciation in the spirit in which offers of assistance are made,
the LRG should work with the LDMG and disaster relief agencies in providing media releases on
what is and what is not needed at a very early stage of response and/or recovery.

All offers of assistance, donated goods and the management of volunteers shall be in accordance
with the Queensland Policy for Offers of Assistance and the Queensland Offers of Assistance
Guidelines.

6.9.2    Recovery centres and outreach services

The Department of Communities, Disability Services and Seniors is responsible for the
coordination of setting up recovery centres known as Recovery Hub and Outreach Coordination
Centres (Recovery Hub). Recovery Hubs provide community members with access to a range
of support services offered by government and non-government organisations. These outlets
engage the maximum number of the affected population by providing a unified point of contact
and support to people requiring assistance.

Recovery Hubs are a useful two-way conduit of practical recovery, information and advice. They
can also be a good means of assessing ‘health checks’ on the affected population.

The Department of Communities may also provide outreach services to address the needs of
those unable to attend Recovery Hubs. Outreach programs are usually based on teams of
recovery workers provided by the Department of Communities who visit people in their homes
and businesses to render assistance and determine needs.


Noosa Local Disaster Recovery Subplan 2018                                                 Page 35

Section 38

Outreach services are primarily designed to reach those isolated and will likely be a key strategy
for the Noosa area. The LRG may need to assist the Department in providing support services
for outreach teams e.g. accommodation, local knowledge, etc.


6.10     Debrief, review and evaluation
A formal review and evaluation of the recovery effort should be undertaken at the conclusion of
recovery operations. This is usually conducted on Stand Down and should be undertaken in
accordance with the National Monitoring and Evalutation Framework for Disaster Recovery
Programs and reported to Noosa Council and the LDMG.

The primary method of undertaking review and evaluation is through the conduct of debriefs after
the event. A debrief in this context is the gathering of relevant stakeholders to review, discuss
and document the learnings from the event and the changes that need to be made to incorporate
this learning. Evaluation can also be taken from assessing the status of action plans and needs
analysis over time. Community input into the debrief, review and evaluation is also important to
inform the reporting and look at improvements for future events.

6.10.1 Periodic debriefs

Recovery can be a long process and debriefs may be undertaken at any time during the recovery
process for any particular activity. Undertaking periodic debriefs will assist in capturing
recommendations for improvement and may improve ongoing delivery of recovery services. The
LRC, LRG and subgroups will determine the nature and extent of periodic debriefs during the
recovery process as part of ongoing continuous improvement. For example, a debrief of those
involved in facilitating a public forum or community meeting should be conducted following the
activity to determine how to improve for the future. Periodic debriefs of individual recovery
programs and activities are encouraged and should be promoted by the LRC, LRG and
subgroups.

6.10.2 Final debrief

At the conclusion of recovery operations formal review and evaluation processes should be
undertaken of the entire recovery effort. The most effective way of undertaking this overall review
is through a series of debriefs of local advisory groups, subgroups and the LRG upon Stand
Down. Such debriefs should be conducted as close to the conclusion of recovery operations as
possible.

Usually debriefs are conducted from the bottom up, meaning that subordinate entities debrief first
and their findings are included in the debrief of the next higher group. On this basis, debriefs
should, where possible, be conducted in the following priority order:
1. Local advisory groups
2. Functional subgroups
3. Local Disaster Recovery Group.




Noosa Local Disaster Recovery Subplan 2018                                                 Page 36

Section 39

6.10.3 Debrief framework

Debriefs should be conducted using an agreed framework to ensure all aspects are adequately
covered. All participants must understand and adhere to this framework in order to effectively
contribute to the review and evaluation process.

The debrief framework for review and evaluation of Noosa recovery operations is based on
responding to three primary questions:

1. What did we do well? (sustain)
2. What did we do well but needs improvement? (improve)
3. What were the gaps and how do we fix them for next time? (develop)

This broad framework can be expanded depending on the nature of the debrief. For example,
the debrief of the LRG and subgroups may examine each of these broad questions against the
major steps of the recovery process. A more flexible debrief framework may be needed for local
advisory groups.

6.10.4 Debrief reports

Individual debriefs are to be documented using the framework applied to that debrief and
provided to the next higher level group in a reasonable timeframe after the event. The final review
and evaluation report from the LRG is to be provided to the LDMG, DDMG and the State
Recovery Group no later than three (3) months after Stand Down from recovery operations.




Noosa Local Disaster Recovery Subplan 2018                                                 Page 37

Section 40

7. Recovery Activities
This section provides guidance on how to conduct recovery operations. It draws from material
provided in the Australian Institute for Disaster Resilience Handbook 2 Community Recovery
(2011) which offers current best practice guidance on recovery.

It should be noted that recovery is essentially a creative endeavour aimed at addressing and
resolving problems and issues to achieve defined objectives. Each disaster is essentially
different and the recovery activities undertaken for each disaster event will often be unique to
that event. This section is divided into the four functional groups of disaster recovery - economic,
environment, human and social, infrastructure, and their subgroups and provides typical
methodologies and considerations for recovery. It is not exhaustive and the LRG and subgroups
must recognise that a range of methodologies and considerations may be applicable to any
particular event.

The LRG and subgroups should strive to manage recovery operations using the recovery project
cycle:




Noosa Local Disaster Recovery Subplan 2018                                                 Page 38

Section 41

7.1      Human and social recovery
Human and social recovery often begins spontaneously within a community and it is the role of
the Human and Social Subgroup to provide structure and resources to support, integrate and
coordinate these spontaneous efforts.

In Noosa, human and social recovery activities are coordinated through the Community Welfare
Sub Committee which meets regularly and has a broad based membership.

This section outlines the range of social recovery activities and services that address aspects of
safety, health and psychosocial wellbeing.

7.1.1    Principles of effective human and social recovery

There are five empirically supported principles to guide intervention efforts in the early to mid-
term stages post-disaster:

1. Promoting a sense of safety
2. Calming – providing reassurance, strategies to reduce worry, fear and distress
3. Enhancing ‘self-efficacy’ and ‘community-efficacy’ – giving people a sense of control over
   positive outcomes
4. Promoting connectedness, encouraging support networks, helping people to feel part of their
   community
5. Instilling a sense of hope and optimism for the future

Effective recovery is strongly influenced by very practical issues such as the availability of food,
housing, jobs and financial security. As a general rule, the more the community can be supported
to rebuild the social and physical infrastructure, to return to their jobs and schools, and to regain
financial stability, the greater the benefit for their wellbeing and recovery process.

The following seven indicators of social wellbeing may be used by the Community Welfare Sub
Committee:

1.   Wealth
2.   Employment
3.   Amenity
4.   Health
5.   Social issues
6.   Social belonging
7.   Recreation and leisure

As a guide, the Community Welfare Sub Committee should strive to:

    Provide timely and accurate information
    Reconnect people with their families, friends and community networks
    Empower people to manage their own recovery and to access practical assistance
    Provide engagement and emotional support at individual, family and community levels

7.1.2    Categories of human and social recovery

Safety and security
Loss of life, injury, loss of shelter and threats to safety as a result of a disaster all impact on an
individual’s and/or a community’s sense of safety and security. Social order and strong
governance provide the sense of safety that people require to reduce their anxiety about the
future. Disaster affected people will need timely information about safety, protection issues and
mitigation actions to address emerging safety and wellbeing issues.

Noosa Local Disaster Recovery Subplan 2018                                                   Page 39

Section 42

Shelter
A paramount concern for displaced people is to have safe, alternative accommodation when their
homes have been damaged, destroyed or are inaccessible due to contamination or ongoing
hazard threats.

Ensuring displaced households and individuals have appropriate shelter is a key to ensuring their
safety and commencing their recovery. Accommodation arrangements may range from short
term to long term. Further information on building matters is provided in the section on
infrastructure recovery.

The Community Welfare Sub Committee should:
 Keep accurate and up-to-date records of where people relocate and their contact details
 Organise emergency accommodation in conjunction with local agencies
 Preferably arrange for transitional or longer-term accommodation on or hear home sites of
   those people whose own homes are not habitable
 If people need transport, consider how this may occur
 Ensure privacy is respected and maintained at all times
 Establish a referral mechanism for psychosocial support

Emergency and short-term accommodation is considered to be that provided in evacuation
centres during the response phase of disaster management. However, it may include the use of
hotels, motels, caravan parks, private houses including family and friends. It will usually be
provided only for a few days during the impact and immediate aftermath of an event.

Arrangements to meet people’s emergency or short-term accommodation needs are managed
by the LDCC’s Community Support Officer and the LDC. When people need longer term
accommodation following a disaster these needs will be managed by the LRC and the LRG.

The Community Welfare Sub Committee should work closely with the Department of Housing
and Public Works and the community to develop and implement appropriate inter/medium-term
accommodation to suit the needs of those displaced. Use of any of the following should be
considered:
 Rental properties on the market
 Existing caravan park accommodation
 Tourism accommodation providers, particularly those who cater for longer term stays
 Transport of demountable buildings to designated locations
 Community billeting using the resources offered by the community

Locations for temporary accommodation will vary considerably for each person and family.
Temporary accommodation solutions should be tailored to meet people’s needs as far as is
practicable. Considerations for interim/medium-term accommodation include ensuring equity,
adequate safety and security as well as access to services such as:
 Water and waste management, power and communications
 Health
 Transport
 Schools and work
 Social services including social networks and support organisations

Health
Health is a state of physical, mental and social wellbeing and not merely the absence of disease
and infirmity. Queensland Health is the primary responsible agency for the provision of health
care services to the community and should have effective representation on the Community
Welfare Sub Committee, in consultation with the Health Services Subgroup and in accordance
with the Health Services Subplan. Public health services are provided by both Queensland
Health and Noosa Council and play a key role in recovery to reduce adverse public health affects
after a disaster:

Noosa Local Disaster Recovery Subplan 2018                                               Page 40

Section 43

   Managing communicable disease issues – surveillance and review of morbidity that may be
    occurring in the community and subsequent implementation of interventions such as vaccine
    programs if, for example, there is an increase in diagnosis of influenza or hepatitis A
   Health protection, environmental health and air quality, food and water inspections and
    advice e.g. advice to boil water, water tank quality, disposal of spoilt food, review of food
    preparation procedures in evacuation centres, etc
   Inspections and review of sewerage and other contamination issues that may impact on the
    health of the community
   Health promotion activities such as information and advice about heat stress, clean-up health
    hazards such as mould and asbestos, and other activities that aim to enhance self-care and
    prevention of later hazards in recovery

Psychosocial support, including individual and community activities and services
Psychosocial impacts can be very broad and may be a result of how a disaster affects peoples’
emotional, spiritual, financial, cultural, psychological and social needs as part of a community.

Disaster affected people often receive the majority of their support from their families, friends,
colleagues and community organisations. In addition, social recovery is enhanced through the
provision of adequate food, water and shelter and the return of services such as transport,
communication, power and health.

Psychosocial support builds on these measures by providing a variety of services that range from
supporting individuals and households to communities through community development activities
and projects.

Psychosocial support to individuals and households includes psychological first aid and personal
support services.

Community development activities and projects are often low cost, simple activities that provide
the foundation for the establishment of a meaningful recovery program. They are focused on
providing assistance in re-establishing social connections and functionality through group and
community activities. Examples include:
 Neighbourhood barbeques
 Street meetings
 School activities
 Community recovery planning
 Spiritual and sporting events
 Ceremonies and remembrance activities
 Virtual forums
 Impromptu displays such as photographs or artwork depicting the event and/or the
    community’s recovery

Psychological first aid is a key component of psychosocial support and provides a set of skills to
underpin the effective provision of psychosocial support services. It is an evidence-informed
approach based on common-sense principles of support to promote normal recovery and
includes helping people to feel safe, connected to others, calm and hopeful and facilitating access
to physical, emotional and social support; and enabling people to be able to help themselves.

The goals of psychological first aid are to:

   Reduce stress
   Assist with current needs
   Promote adaptive functioning
   Get people through periods of high arousal and uncertainty
   Set people up to be able to naturally recovery from an event
   Assist early screening for people needing further or specialised help
   Reduce subsequent post-traumatic stress disorder

Noosa Local Disaster Recovery Subplan 2018                                                 Page 41

Section 44

Community leaders and other key members of the community can be trained in the principles
and delivery of psychological first aid to ensure that an appropriate response is immediately
available within the community and to allow community members to work alongside emergency
support workers to manage community needs. Under the current Queensland State Disaster
Management Plan, Lifeline Community Care Queensland is a key agency involved in the
community recovery process and has been delegated the lead agency in the provision of
psychological first aid following a disaster event.

7.1.3   Personal support services

The term, personal support services, refers to the specific role within the social recovery
workforce, which provides a diverse range of practical assistance coupled with physiological first
aid for the immediate and early recovery needs of individuals, families or groups of disaster
affected people.

Personal support services can be provided by a wide range of personnel from government and
non-government agencies and local communities. These personnel can be employees, trained
volunteers or trained local community members who have the capacity and interpersonal skills
to support people in distress. These personnel do not provide counselling or psychological
services but should be able to recognise people with these needs and refer them to the
appropriate service providers. These services are primarily provided and coordinated by the
Department of Communities and are evident in services such as evacuation and recovery hubs
and outreach programs.

Practical assistance as a component of personal support services
Personal support personnel and key recovery agencies can provide, or ensure access to, a wide
range of practical assistance. Practical assistance is usually available through evacuation and
recovery hubs and through outreach programs and can include:
 Information about what has happened, services available and plans that are in place
 Access to available communication such as telephone, satellite services, free internet access
 Comfort and reception
 Referral to other agencies
 Reassurance and security
 Material aid (food, water, toiletries, hygiene kits, bedding, clothing)
 Time away for families (respite)
 Reassurance and security
 Child minding
 Child and aged care services
 Transport
 Advocacy, legal aid, insurance
 Pet care and foster care services
 Support with clean-up
 Meetings and forums
 Assistance with funeral arrangements
 Medication and medical care
 Locating relatives and loved ones

Designing individual and household psychosocial support programs
Several issues need to be taken into account when designing and delivering personal support
services:
 The majority of people affected by the disaster will not be used to using welfare or social
   services and may find it difficult to approach, access or fully utilise emergency relief and
   recovery services
 Some people may need specialist support that is not readily available or may require a
   complex mix of services to meet their needs

Noosa Local Disaster Recovery Subplan 2018                                                Page 42

Section 45

   In identifying the need for individualised support services, recovery planning needs to
    consider the impact the event has had on local service providers. There may be a need to
    develop strategies to augment the availability of local community services to meet a surge in
    demand
   Individualised support programs can graduate in intensity from self-accessed information to
    coordinated service delivery and case management approaches

To be successful, delivery of individual and household psychosocial support programs should
be:
 Simple and easy to understand
 Consistent
 Accessible
 Seamless
 Have a single point of contact

7.1.4    Community development activities and programs

To address the important recovery issues of family and community interaction, the organisation
of social activities has proven very effective. Neighbourhood barbeques and local social events
that make use of the arts, music, theatre or sporting activities all provide opportunities for people
to mix, tell their accounts of events and work cooperatively to plan future events. Practical
activities such as fence building or weed clearing can also include a social component and may
be attractive to people who would not necessarily attend a ‘social’ event.

Community development programs can be managed by Noosa Council, local community
organisations or the Department of Communities. The decision about the management of these
programs is often related to local presence, community trust and capacity to manage.

Men and women
It is widely recognised that men and women have different needs and human and social recovery
activities and programs may need to be categorised by gender. This is particularly important for
males who may find it difficult to acknowledge problems, to ask for assistance and to make use
of naturally occurring support networks. Examples of types of social recovery networks for men
may include:
 Men’s sheds, which encourage men to work on projects that will have real and practical
      benefits for themselves and the community and at the same time, provide opportunities to
      talk over their issues with others, seek advice and give help
 Tool libraries which are a practical and tangible way for men to receive assistance with tools
      that may have been lost or damaged as a result of the disaster
 Locally organised events relevant to the men in an area affected by an emergency such as
      sporting and leisure activities and other outdoor pursuits

For many women, sharing their experiences is one of the most important aspects of their personal
recovery. Programs that focus on ways in which women can interact, learn and share
experiences are vital and may include:
 Local women’s organisations and networks
 Locally organised events relevant to the women in an area affected by the disaster such as
    pampering weekends, gardening groups or women’s health information sessions
 Support groups that facilitate the sharing of stories and experiences




Noosa Local Disaster Recovery Subplan 2018                                                  Page 43

Section 46

Children and young people
The additional needs of children and youth need to be considered by the Community Welfare
Sub Committee. Considerations include:
 Recognition that children and youth are uniquely vulnerable following an emergency event
   and require targeted and specialised support
 Children are not little adults and should not be managed in the same way as adult population
 There is no one size fits all approach to recovery for children and youth and recovery plans
   must consider the developmental stage of those affected

The importance of family and community support in helping children and young people overcome
the impact of their experiences cannot be overstated. Parent information sessions that provide
advice and information to parents on ways to support their children may be beneficial.

Local schools are key community organisations that can provide support to the younger members
of the community. Engaging with schools and education facilities to gauge the level of impact on
the young people in a community and involving them in development of plans and activities will
assist in ensuring young people are cared for after a disaster.

The Community Welfare Sub Committee should consider providing information to school and
childcare centres perhaps through newsletters that explain the activities and support that are
available to young people and children. While schools are an important conduit to reach young
people and children, consideration must be given to supporting young people after school or
during school holidays or closures. Holiday programs and mobile playgrounds may be useful to
provide suitable activities to children and young people.

Aged
Members of the aged community can be incredibly resilient but in other cases are particularly
vulnerable during a disaster. Their life experiences include events such as wars, the Depression,
bushfires, floods and droughts, which demanded great self-reliant resources, gave them the
strength to deal with unusual circumstances.

People who are older, however, may be isolated, frail, suffering from chronic illness or dependent
on others for transport, meals and self-care. Some older people may have lived in the community
all their lives and suddenly be put in a position of needing to relocate, in addition to losing a
lifetime of memorabilia and familiarity.

The Community Welfare Sub Committee needs to quickly establish who these people are and
where they are located in the community and link them into aged care services that can help
them re-establish a sense of safety and security as quickly as possible. In the same way that
children and youth may be brought together to help them talk about and process their
experiences of the disaster, it may be helpful to organise groups of aged people to get together
and share stories and information.

Culturally and linguistically diverse communities
Non-English speaking people may be especially vulnerable to prolonged impacts following a
disaster by virtue of their inability to communicate well with emergency and relief workers, and
their difficulty in accessing information that helps them to make sense of the event and its
aftermath.

Different cultures approach and react to disasters in different ways. This can potentially cause
tensions in the broader community if these reactions are not understood by others. It may mean
that minority groups in the community can feel left out, marginalised and misunderstood if they
do not understand or cannot relate to the recovery processes put in place by the government and
other organisations. They may also feel unable to express and manage their grief or distress in
their usual ways.




Noosa Local Disaster Recovery Subplan 2018                                                Page 44

Section 47

The Community Welfare Sub Committee should be aware of the different cultural groups in their
communities and should ensure that appropriate recovery services are made available to meet
their needs. However, it is also important to be cognisant that many of these communities
demonstrate great resilience because they often possess a range of experiences and skills in
dealing with emergencies.

Support for the bereaved
People who are bereaved are an example of a vulnerable group that needs specialised support
and attention. The bereaved group will include surviving family members who directly
experienced the emergency event and family members who did not, so plans need to be made
to identify extended family members who may not be local to the community of impact.

Counselling services should be identified to assist with grief and bereaved communities. The
Community Welfare Sub Committee should maintain close liaison with the police and the
Coroner’s Office to ensure clear communication about support services is available to bereaved
groups.

Bereavement services are led by the Department of Communities, Child Safety and Disability
Services. Services may include:
 One-on-one and family counselling
 Bereavement support groups
 Delivery of an annual commemorative event, including consultation and input from the
   bereaved community

People temporarily separated from or have lost, their companion animals
Companion animals can help people to maintain their social, emotional and physical wellbeing.
Companion animals are significant partners in many people’s lives. Increasingly, research shows
that companion animals can also contribute to the recovery and maintenance of both physical
and mental health. The Community Welfare Sub Committee should:
 Recognise that restoring animal – owner links in the aftermath of evacuation is an important
    aspect of social recovery and return to normalcy
 Recognise that the grief from loss of companion animals can be as equally powerful for some
    people as other losses, and this should be recognised in access to services and
    remembrance activities
 Work with animal welfare agencies, e.g. the RSPCA, and take the opportunity to use
    volunteer support to provide services related to animal welfare

In addition, the loss of stock and native animals can cause distress in both children and adults.
Arrangements for the care of stock and native animals should be provided for an information on
them given to the community.

Cultural and spiritual factors
The Community Welfare Sub Committee should be aware of and respect the cultural and spiritual
world views that shape many communities’ views of the disaster.

Cultural and spiritual symbols and rituals can provide an essential dimension to the community
recovery process. Rituals and symbols provide something that is familiar and comforting in times
of uncertainty and change. Commemorative events and memorials can assist the community to
interpret and share their emotions and collectively make sense of the disaster, e.g. spontaneous
floral tributes at or close to the sites of a disaster and probably beginning in the immediate
aftermath.

The Community Welfare Sub Committee should note that these symbols may be identified pre
or post-disaster. If these are recognised, supported and coordinated as part of the recovery
process, which is owned by the community, they will provide the focus for cultural and spiritual
activities.


Noosa Local Disaster Recovery Subplan 2018                                               Page 45

Section 48

Remembrance activities must recognise that all people are affected and have equal rights to
participate in planning commemorative events or permanent memorials. Memorialisation has
traditionally honoured a society’s dead so there is a tendency to focus upon the bereaved. The
Community Welfare Sub Committee should facilitate processes that are sensitive to the wishes
of the bereaved but that are inclusive of all people affected by the disaster.

These activities assist in the long-term integration of the emergency or disaster into the history
of the community. Often these activities can be conducted on anniversaries or other significant
community occasions.

7.1.5   Additional support for Community Development Officers

In some circumstances it may be necessary to provide additional resources to support the
community development component of the recovery process. In particular, the employment of
one or more community development workers may be necessary to facilitate a range of activities
which will enhance the recovery of individuals and the broader community affected by any given
event.

Funding for Community Development Officers will vary however they may be funded as part of a
Community Recovery Package under NDRRA funding. The Human and Social Recovery
Subgroup should consider the need for one or more community development officers and
prepare funding submissions and business cases to the LRG to enable advocacy for appropriate
funding.

7.1.6   Checklist for Human and Social recovery

Components
 Safety, security and shelter
 Health
 Psychosocial wellbeing

Partners and stakeholders
 Affected communities
 Response agencies
 State and Australian Government agencies
 Non-government organisations
 Local government
 Health authorities, doctors, community health
 Representatives of sectors or groups – ethnic, rural, social and sporting clubs
 Media

Immediate / short-term (relief)
Conduct immediate needs assessment:
 How many affected
 Mortality and injury
 Potential for psychological / emotional trauma
 Displacement
 Loss of property
 Loss of pets or companion animals
 Isolation
 Individuals or groups with special needs




Noosa Local Disaster Recovery Subplan 2018                                                Page 46

Section 49

Prioritise needs for affected community and for recovery operations:
 Safety
 Water and food
 Psychological first aid
 Emergency accommodation
 Personal needs
 Reuniting families
 Material and financial
 Transport
 Health and medical
 Communication
 Information
 Community meeting spaces and connectivity
 Culturally specific needs

Medium term recovery
Conduct medium-term recovery needs assessment:
 Psychosocial support
 Temporary accommodation
 Material and financial support
 Health and medical
 Communication
 Information
 Assistance with recovery processes e.g. grants, insurance, clean-up
 Community meeting spaces and connectivity
 Culturally specific needs
 If required, implement outreach programs
 Ensure that displaced persons are connected and able to re-engage with their ‘home’
   communities
 Provide psychosocial support mechanisms
 Provide support and resources to enable people to access services, including interpreters to
   cater for cultural and linguistic diversity, resources for people with mobility, vision and hearing
   impairment and for people with a cognitive disability
 Consider the needs of tourists and persons from interstate and overseas
 Ensure that planning and implementation of services and activities maintain an awareness of
   cultural implications for various groups
 If established, coordinate the management and operation of recovery centres
 Monitor and manage public health advice, safety and disease control
 Assistance to local community organisations to help them recovery and maintain services

Long term recovery
 Food and water supply
 Safety and security
 Access to private, self-contained accommodation for displaced persons
 Restoration of personal health and clinical services
 Management of public health issues
 Ensure that persons with special needs are not forgotten in planning processes
 Establish systems for ongoing psychological and emotional support for affected persons
 Ensure the redevelopment of social networks and connections
 Establish ongoing information provision




Noosa Local Disaster Recovery Subplan 2018                                                   Page 47

Section 50

7.2      Infrastructure recovery
Depending on the nature of the event, infrastructure recovery may require more scope than
simply the restoration of essential services. The built environment is the physical foundation of
our society and damage to any part of it may have widespread impact on many sectors of the
community.

The complex character of the built environment is highly regulated and legislated. It has a mix
of public and private service providers, and has evolved over a long period of time so that it
incorporates facilities built to different standards. Ownership of elements in the built environment
brings another layer of complexity. Parts of the environment may be owned by multinational
companies, individuals, government, community groups and all manner of other entities.

Recovery of the built environment also provides opportunities to build to meet future community
needs. It supports the recovery of the social, economic and natural environments of the
community. A coordinated response across levels of government, the private sector and the
community is necessary to resolve complex infrastructure recovery issues.

It is, therefore, important that the Infrastructure Subgroup’s membership reflects the scope of
infrastructure recovery required as defined in the recovery needs analysis.

This section details the matters the Infrastructure Subgroup should consider when addressing
infrastructure recovery.

7.2.1    Categories of infrastructure recovery

The following categories of recovery will need to be considered by the Infrastructure Subgroup:
 Essential services
 Transport networks
 Rural infrastructure
 Residential infrastructure
 Commercial and industrial infrastructure
 Public buildings and assets

7.2.2    Essential services

Communication systems
Communication systems are essential to effective recovery. Communications underpin social
and business networks and are essential in ensuring effective public information. The
Infrastructure Subgroup should involve the communication sector to assist in prioritising
communication network repair and reconstruction.

Energy supplies
This includes liquid fuel, electricity and gas. Consequences of loss of energy supplies may be
widespread. The Subgroup should consider the following possible impacts of power supply
disruption:
 Perishable food spoilage
 Impacts on supply of essential services such as water, sewerage and gas
 Failure of communication and information technology-based systems
 Disruption to fuel distribution
 Potentially high demand for portable generators
 Security and safety concerns due to lack of lighting and loss of traffic lights and rail signals,
    compromising transportation
 Impacts on commercial and industrial activities
 Impact on primary production
 Impact on other key essential services such as food storage and distribution

Noosa Local Disaster Recovery Subplan 2018                                                 Page 48

Section 51

   Implications for the location of a recovery centre
   Difficulties in maintaining accommodation for displaced people and recovery workers
   Problems for medically dependent residents who require electricity

The Infrastructure Subgroup should involve the energy sector to assist in prioritising energy repair
and reconnection.

Water supply, treatment and sewage
The consequences of damage to the water and sewage infrastructure may be widespread. The
Subgroup should consider the following impacts:
 Impact on the quality of water for community and commercial use
 Impacts on community health caused by failure of sanitation systems
 Firefighting may be compromised
 Overflows caused by blockages and local flooding may lead to flooding of homes and
   businesses

Food distribution
Following an event some households will have sufficient food and groceries to sustain them for
a period of time, but many will not. The food and groceries industry suggests that on average
95% of households have between two and four days of pantry supplies and that 40% of meals
are purchased and consumed outside the home. People in rural areas however may have
significant pantry supplies due to their experiences and location.

The impact on the food supply chain depends upon the extent of the event. The food supply
chain is flexible and can respond very quickly where the event is regionally contained. However,
in the affected area supplies may be limited due to the direct impact of the event and panic buying
by the community. The food supply chain is also the primary channel to market for a range of
essential household health, sanitary, cleaning and disinfecting supplies.

Restoration of the food supply chain is a priority.

Health infrastructure
This includes aged care, hospitals and health care facilities (general practitioners, chemists).
Health and community services are primarily delivered from premises within the built
environment. Damage and disruption to these premises reduces the capacity of the service
system to meet the existing and emerging health and psychosocial needs of the community.

At the same time, a disaster event almost always carries with it the likelihood that people will be
killed or injured and/or experience emotional trauma. The demand for medical and personal
support is likely to increase which will place extra burden on a community with an already
diminished capacity.

Impacts within health and community services include:
 Hospitals, clinics and aged care facilities and/or their equipment may become damaged and
   inoperable – disruption to water, gas and power will also severely restrict the services these
   facilities can provide even if they continue to function
 Damage to supported accommodation facilities for housing vulnerable people (frail, aged and
   people with disabilities) which may put them at higher risk of harm
 Public health concerns that arise with the displacement of large numbers of people including
   into temporary accommodation. Interruption and disruption of utilities and sanitation creates
   a high risk of infectious disease outbreak.

In a major event the DDMG Health Sub Committee will be an important reference group for the
LRC to liaise with.




Noosa Local Disaster Recovery Subplan 2018                                                  Page 49

Section 52

Sanitation (liquid and solid waste disposal)
The level of sanitation may well be severely compromised and result in a risk of infectious disease
outbreak or spread. In addition to contaminated water, risks can result from:
 Rotting food
 Other contaminated materials, such as soft furnishings, papers and even building materials
 Dead animals including pets and farm animals
 Closure of landfill and/or inability to provide refuse disposal services

Security
Security infrastructure such as fire alarms and security lighting and cameras may be all impacted.
Security issues following an emergency may also relate to a crime scene or coronial inquiries.
The forensic requirements of these issues can hamper recovery of the built environment. Looting
may also be an issue requiring additional security resources. Damage to buildings presents
genuine concerns for the security of premises and possessions.

7.2.3    Transport networks

Transport networks, including road, rail, aviation and maritime networks and the infrastructure
that support them such as bridges, railway lines, ferries and airports can be affected during an
event.

Restoration of these networks is a priority in support of recovery and a special subgroup may be
formed to focus on the restoration of the region’s transport networks.

7.2.4    Rural infrastructure

Damage to rural areas can impact on livelihoods and on living conditions. For rural people, the
loss of their homes may result in dislocation from their livelihoods. It may be very difficult for
them to remain living onsite to maintain their enterprises.

The following aspects of rural infrastructure may be damaged:
 Fences
 Pasture
 Machinery
 Sheds
 Irrigation infrastructure

Other specific rural issues include:
 Length of time needed to restore livelihoods in rural areas may be extended
 There may be a difference between commercial and hobby farmers
 Impact on livestock by loss of fodder and pasture and the consideration to sell, agist or cull
   livestock may be foremost in farmers’ minds
 Biosecurity can be compromised by damage to fences or movement of soil and water

7.2.5    Residential infrastructure

Residential losses can occur in the following categories:
 Houses, home units, apartments, flats and sheds
 Nursing homes, hostels, aged care facilities
 Boarding houses, hotels, motels, caravan parks
 Residences in commercial buildings and businesses




Noosa Local Disaster Recovery Subplan 2018                                                 Page 50

Section 53

7.2.6    Commercial and industrial infrastructure

Much of the economic activity in a community is driven by the commercial and social networks
that depend on the built environment. Demand on most commercial facilities increases during
the recovery period but the capacity to supply need is often hampered by the damage to the built
environment.

Damage or disruption to commercial facilities and infrastructure may inhibit the community’s
access to the services and support provided by:
 Transport
 Banking and finance e.g. cash accessed by automatic teller machines
 Employment
 Hospitals and emergency facilities
 Tourism
 Supply chains such as for food (supermarkets, warehousing and transportation offices), fuel,
   hardware and building supplies, chemists and suppliers of other controlled substances

Adverse effects of damage to commercial facilities can include:
 Contaminated debris e.g. hazardous waste (asbestos)
 Health hazards e.g. biochemical, animals, food

7.2.7    Public buildings and asset infrastructure

For a community to function or to be viable, it requires operational public buildings and assets,
including:
 Community and neighbourhood centres
 Schools
 Kindergartens
 Places of spiritual worship
 Sporting clubs
 Cultural centres
 Entertainment venues
 Restaurants and cafes
 Heritage listed properties and cultural icons
 Parks and gardens, public spaces and amenities

Each facility has the potential to help considerably during the recovery but may be unable to
perform its community functions if damaged. The community is reliant on the restoration or
replacement of the above infrastructure to re-establish and function.

7.2.8    Infrastructure recovery planning

In planning infrastructure recovery, the subgroup must:
   Undertake detailed damage and needs assessment
   Develop contingency plans to allow work to be done, despite the immediate difficulties including
    reduced transportation and communication services
   Recognise the strong links between infrastructure recovery, economic recovery and people’s response
    to the emergency or disaster
   Prioritise infrastructure restoration and its eventual recovery according to the importance of the service
    that the infrastructure supports
   Recognise that people may be traumatised if they feel that their buildings have not protected them or
    if they have suffered loss as a result of the event
   Recognise that these feelings of loss and deprivation will be heightened if the normal community
    structures for support are not in place and if the damage to infrastructure places further threats on their
    continued wellbeing
   Understand that reconstruction of the infrastructure by external parties can alienate the
    community unless the community is involved in the formulation of recovery strategies
Noosa Local Disaster Recovery Subplan 2018                                                            Page 51

Section 54

7.2.9    Key steps in infrastructure recovery

The key steps include:
 Understand what needs to be done to recovery
 Identify external constraints and internal organisational restraints
 Priories tasks
 Put in place short term / interim fixes
 Identify the resource and material requirements
 Strategic planning including long term recovery outcomes.

7.2.10 Infrastructure needs assessment

Infrastructure assessments may be categorised into three separate activities:

   Initial assessments which are usually undertaken in the first few hours after impact during
    the response and immediate/short term (relief) state of disaster management. These
    assessments usually only provide an indication of the scale of the problem and allow for
    response and relief operations.
   Rapid impact assessments which are usually conducted within the first 24 to 48 hours after
    impact and involves the sending out of damage assessment teams to make first hand
    assessments. Rapid impact assessment can be undertaken by Queensland Fire &
    Emergency Services (Fire & Rescue).
   Detailed assessments which are normally conducted after the disaster response phase and
    which inform the development of the Recovery Operational Plan and the Infrastructure
    Recovery Action Plan. These assessments will normally be undertaken by individual
    agencies and coordinated by a suitably qualified person appointed by the Director
    Infrastructure Services.

When gathering information for infrastructure recovery assessments the subgroup should
consider:
 Power
 Water and sewerage
 Waste disposal infrastructure
 Roads and bridges
 Rail
 Communication networks, including exchanges
 Damage to residential and commercial buildings
 Damage to public buildings including schools and hospitals
 Damage to recreation and cultural facilities
 Dam walls
 Hazard footprints, locations
 Displaced people
 Food supplies and food and merchandise supply chains
 Alternative access points
 Fences

Complications in damage and impact assessment often occur because:
 Owners of properties are not present at the time of inspection
 Professional advice may be needed and may not be readily available
 Organisations and individuals have differing priorities and agendas which impacts on the
  timeliness and relevance of the impact / damage assessment
 Data on damage may not be complete due to inaccessibility
 Insufficient resources available to analyse impact data and needs
 Data reporting in a variety of incompatible formats



Noosa Local Disaster Recovery Subplan 2018                                             Page 52

Section 55

7.2.11 Planning for reconstruction

Reconstruction is generally more complex than regular building and development activity. Some
of the key issues to be considered by the subgroup include:
 Community consultation. Works should be prioritised and staged i.e. temporary fixes with
    more detailed solutions developed over longer time frames, in consultation with the affected
    community
 Assessment. There are likely to be differing assessments e.g. insurance versus those
    affected. Limited assessments done early may miss things or under report or over report the
    scale and nature of the damage. Damage may be missed by inexperienced or overwhelmed
    assessors
 Environment. There is a need to reduce exposure to future risk or creation of new risk from
    reconstruction effort
 Regulation and frameworks. Temporary relaxation of planning regimes may allow buildings
    and structures to be built that reinstate pre-disaster vulnerabilities or threats. In addition,
    house repairs might not have to meet new building codes, whereas rebuilding is usually to
    the new standard. Underinsurance and low damage write-offs may place a significant burden
    on building owners and the subgroup may engage with insurers and building owners to assist
    in negotiations. Betterment programs and initiatives should also be explored to ‘build back
    better’ damaged infrastructure to a higher standard than the pre-disaster standard.

7.2.12 Approvals for reconstruction

Appropriate standards for reconstruction may not always be clear. Buildings must conform to
the current building regulations at the time of their construction, however over time, these
regulations may change. This can cause difficulties for owners, insurers and financiers. In
addition, supervising the reconstruction may bring other problems.

Many people may not be aware of the need to apply for building approval for major repairs and
may try to start major repairs without approval and in the confusion of clean up and general
construction activity, their work may go unnoticed.

Although temporary repairs to give some amenity are accepted in the early stages of recovery,
some temporary repairs may become incorporated into the final structure without approval.
Additional staff to approve and inspect building and construction will likely be required to augment
existing staff overloaded with planning and approvals. Planning approval processes need to be
streamlined to ensure quicker turnaround to those affected by disaster.

Volunteers may be required to show that they are appropriately qualified, particularly interstate
trades people who may not be familiar with Queensland requirements for building and
construction.

7.2.13 Implementing reconstruction

Wherever possible, the Subgroup should encourage the use of local contractors for
reconstruction and building tasks. This enables local work opportunities and supports the local
economy. Local contractors also have local knowledge.

Delays in reconstruction are inevitable either because of continuing hazards, the scale of the
event and/or the availability of resources. Lack of funding can also cause delays. The Subgroup
should seek to minimise delays wherever possible to alleviate stress in the community. Where
delay is unavoidable, the Subgroup should engage with the community to provide public
information and to confirm temporary arrangements.




Noosa Local Disaster Recovery Subplan 2018                                                 Page 53

Section 56

Many organisations involved in recovery may be contracting work or issuing tenders. Normal
tendering, awarding work and contracting processes should be followed. The Subgroup should
encourage all organisations to ensure they adopt sensible and accountable procedures for the
contracting of services.

The changing nature of recovery means that:
 Staged reinstatement may be needed to deliver some quick but temporary outcomes that
   address the immediate needs, with later work required to address longer-term needs
 Plans may need to change to meet the changing needs
 At all stages, time should be set aside to reflect on the decisions that have been made and
   to make sure that they provide the best solutions – in some cases, rushed decisions are not
   necessarily the best ones
 Communication, both by listening and talking, is important with all stakeholders. This includes
   the subgroup and local advisory groups

7.2.14 Other considerations for reconstruction

Make safe
It is important that safety and security is maintained throughout the recovery process. There is
a risk that people will not maintain normal safety measures and procedures in their haste to effect
repairs and restore some sense of normality to their lives e.g. ensuring that only appropriately
qualified people perform work. The term ‘make safe’ means many things and can include:
 Classifying structural soundness
 Establishing safe areas by removing hazards
 Maintaining health, public health and safety standards
 Managing ingress and egress routes
 Receiving suitable sign-off
 Requesting domestic and industrial consumers of water and electricity to shut off equipment
     to preserve limited supply

The Subgroup should plan for and implement programs that promote and enhance safety in
building and construction. Agencies such as the Building Services Authority and trade unions
can assist in these matters.

Clean up
A significant volume of damaged material must be removed prior to the construction of new
facilities. In many cases this operation must be performed to restore amenity to the community.

Clean up operations include:
 Removal of debris and other matter – green waste, building waste
 Removal of rotting food from shelves and refrigerators in commercial establishments and
   houses, both attended and unattended
 Removal and disposal of hazardous substances e.g. asbestos containing material, dust from
   fluorescent tubes
 Removal of enviro-hazards e.g. oil or chemical spills, copper and arsenic, treated timber,
   lead, silt, flood debris which may become a future fire risk
 Disposal of carcasses from pets or agricultural animals. This may require special disposal
   and environment health officers should be consulted for appropriate areas and requirements
 Processing waste – grinding, compacting, recycling
 Disposal of medical waste, including pharmaceutical waste. This may require special
   supervision and disposal at secure sites. Consult with environmental health officers.
 Managing and removing debris that presents a safety hazard to the community and may
   require special steps to remove e.g. glass in school playgrounds




Noosa Local Disaster Recovery Subplan 2018                                                 Page 54

Section 57

Handling, safety and regulation
 Care to be taken with removal, handling and disposal of hazardous substances e.g. lead or
   asbestos containing products
 Calculating the logistics of moving the waste and debris – transport and heavy equipment
   within built-up areas and high traffic levels at the disposal site may impact communities
 consulting the Department Environment & Science to obtain approvals for some disposal
   processes
 assigning landfill and burial sites. These may have to be new sites and would be subject to
   permissions and approvals
 obtaining specialist services, contractors and expertise
 obtaining suitable approvals at the commencement of the work or on completion of debris
   removal. The requirements for these may vary for different services.
 Disinfecting water-damaged facilities and other areas where there is concern about
   continuing health and amenity of the facility
 Maintaining normal safety measures through all operations

Site-specific issues
 Work performed on and around heritage-listed facilities may require special permissions
 Working in an environment affected by coronial matters. Where there are deaths associated
    with the event, or crime has been associated with the event, access to the site may require
    clearance from police or coronial staff.

Refer to Operational Subplans:
 Emergency Debris Storage and Disposal
 Asbestos Containing Material

7.2.15 Checklist for Infrastructure Recovery

Components
 Essential services
     o Transport – roads, rail, bridges, ports, airports, public transport
     o Energy – power, fuel, gas
     o Communications – telephone (fixed line and mobile), internet and data, radio and
          television
     o Utilities – water, sewerage, drainage, sanitation, waste and recycling facilities
 Rural infrastructure
     o Fencing, sheds and buildings, produce handling, irrigation
     o Animal welfare – shelters, pounds, veterinary facilities, stock containment
 Residential infrastructure
     o Residential buildings – domestic homes, hotels and motels, caravan parks
 Commercial and industrial infrastructure
     o Distribution infrastructure – food and merchandise
     o Commercial and retail – shops, banks, food outlets, hardware and building, fuel
          outlets, white goods, pharmacies
 Public building and asset infrastructure
     o Public facilities – hospitals, doctors’ surgeries, aged care, schools, police and
          emergency services stations
     o Community buildings – halls, churches, cultural and historic, sporting clubs
     o Government administration – council and government offices
 Recovery infrastructure
     o Evacuation centres
     o Relief and recovery centres
     o Warehousing of donated goods




Noosa Local Disaster Recovery Subplan 2018                                             Page 55

Section 58

Partners and stakeholders
 Affected communities
 Road and rail authorities and operators
 Public transport operators
 Energy suppliers and retailers
 Water and sewage authorities and retailers
 Communication operators
 Health and education authorities
 Building control authorities
 Professional bodies (architects, engineers, building surveyors)
 Others as required, depending on emergency event and local needs

7.2.16 Noosa infrastructure profile

Critical infrastructure detailed in this report includes public and community assets as follows:
 Community facilities – schools, community centres and halls, health care facilities, aged care,
    sports facilities, local government administration and works depots
 Emergency services – Police, Ambulance, Fire and Rescue, SES, Rural Fire and Coast
    Guard
 Transport – roads, bridges, ferry and rail
 Services – electricity, water, sewerage and telecommunications

It does not include residential, industrial or commercial infrastructure.

Schools
 School name                                   Address
 Kin Kin State School                          26 Main Street, Kin Kin
 Cooran State School                           31 James Street, Cooran
 Federal State School                          40 Middle Creek Road, Federal
 Pomona State School                           74 Station Street, Pomona
 Cooroora Secondary College                    120 Summit Road, Pomona
 Cooroy State School                           59 Elm Street, Cooroy
 Noosa District High School (Cooroy)           2 Tulip Street, Cooroy
 Noosa Christian College                       20 Cooroy Belli Creek Road, Cooroy
 Tewantin State School                         10 Werin Street, Tewantin
 Noosa Flexible Learning Centre                12 Ernest Street, Tewantin
 Noosaville State School                       75 Beckmans Road, Noosaville
 St Teresa’s Catholic College                  45 Sea Eagle Drive, Noosaville
 Good Shepherd Lutheran College                115 Eumundi Noosa Road, Noosaville
 Sunshine Beach State School                   269 Sunshine Beach Road, Sunshine Beach
 Sunshine Beach State High School              45 Ben Lexcen Drive, Sunrise Beach
 St Thomas More Catholic Primary School        75 Ben Lexcen Drive, Sunshine Beach

Community buildings
 Centre name               Address                               Potential       Potential
                                                                 evacuation      recovery
                                                                 centre Yes/No   centre
                                                                                 Yes/No
 Kin Kin School of Arts    26 Main Street, Kin Kin               Yes             Yes
 Ridgewood Hall            2 Donnellys Road, Ridgewood           Yes             Yes
 Federal Hall              2 Skyring Creek Road, Federal         Yes             Yes
 Cooran School of Arts     14 King Street, Cooran                Yes             Yes
 Pomona School of Arts     6 Reserve Street, Pomona              Yes             Yes
 Pomona Community          1 Memorial Avenue, Pomona             No              Yes
 House
 Cooroy Memorial Hall      23-29 Maple Street, Cooroy            Yes             Yes
 Cooroy RSL                23-29 Maple Street, Cooroy            No              No
 Cooroy Library            9 Maple Street, Cooroy                No              Yes

Noosa Local Disaster Recovery Subplan 2018                                               Page 56

Section 59

 Centre name              Address                                Potential          Potential
                                                                 evacuation         recovery
                                                                 centre Yes/No      centre
                                                                                    Yes/No
 Tinbeerwah Hall          865 Sunrise Road, Tinbeerwah           Yes                Yes
 Tewantin Noosa RSL       5 Memorial Avenue, Tewantin            No                 No
 Noosa Leisure Centre     54 Eumundi Noosa Road, Noosaville      Yes                Yes
 Noosa Heads Surf Club    61 Hastings Street, Noosa Heads        No                 Yes
 The J Community          60 Noosa Drive, Noosa Heads            Yes                Yes
 Centre
 Sunshine Beach Surf      4 The Esplanade, Sunshine Beach        No                 Yes
 Club
 Bicentennial Community   Bicentennial Drive, Sunshine Beach     Yes                Yes
 Centre
 Peregian Beach Surf      11 Kingfisher Drive, Peregian Beach    No                 Yes
 Club
 Peregian Beach           255 David Low Way, Peregian Beach      Yes                Yes
 Community House
 House with No Steps      Charles Duke Memorial Drive, off       Yes                Yes
 (located outside Noosa   Fellowship Drive, Doonan
 Shire boundary)

Health care
 Facility name                   Address                           Type
 Eden Private Hospital           50 Maple Street, Cooroy           Private rehabilitation hospital
 Noosa Hospital                  111 Goodchap Street,              Public / private hospital
                                 Noosaville
 Noosaville Seven Day Medical    Shop 4, Homemaker Centre, 18      General practitioners
 Centre                          Thomas Street, Noosaville
 Noosa Heads Day & Night         32 Hastings Street, Noosa         7 days, open late
 Pharmacy                        Heads

Aged care
 Facility name                   Address                                    Type
 Carramar                        186 Cooroy Noosa Road, Tewantin            Nursing home
 Kabara                          20 Topaz Street, Cooroy                    Nursing home
 Ozcare                          80 Cooyar Street, Noosa Heads              Nursing home
 Noosa Nursing Centre            119 Moorindil Street, Tewantin             Nursing home
 Domain                          35 Walter Hay Drive, Noosaville            Retirement village
 Hibiscus                        71 St Andrews Drive, Tewantin              Retirement village
 Laguna                          21 Lake Weyba Drive, Noosaville            Retirement village
 Southern Cross Noosa Waters     39 Lake Weyba Drive, Noosaville            Retirement village

Sports facilities
 Facility name             Address                              Owned by                Clear area
 Kin Kin Recreation        57 Main Street, Kin Kin              Noosa Council           2 hectares
 Grounds
 Cooran Recreation Club    Cnr Bridge Street & Railway          Noosa Council           1 hectare
                           Road, Cooran
 Pomona Show Grounds       26 Exhibition Street, Pomona         Noosa Show Society      8 hectares
 Cooroy Sports Complex     35 Mary River Road, Cooroy           Noosa Council           10 hectares
 Noosa District Sports     31 Butler Street, Tewantin           Noosa Council           10 hectares
 Complex
 Girraween Sports          Eenie Creek Road, Noosa Heads        Noosa Council           3 hectares
 Complex




Noosa Local Disaster Recovery Subplan 2018                                                    Page 57

Section 60

Local government administration
 Name                        Address                                 Type
 Noosa Council Administration     9 Pelican Street, Tewantin         LDCC, Administration
 Noosaville Depot                 10 Bartlett Road, Noosaville       Depot
 Pomona Depot                     11 School Street, Pomona           Depot

Emergency services
 Agency                                              Address
 Pomona Police Station                               22 Red Street, Pomona
 Cooroy Police Station                               2 Myall Street, Cooroy
 Tewantin Police Beat                                87 Poinciana Avenue, Tewantin
 Noosa Heads Police Beat                             48 Hastings Street, Noosa Heads
 Noosa Heads Police Station                          9 Langura Street, Noosa Heads
 Ambulance Station Pomona                            17 Reserve Street, Pomona
 Ambulance Station Cooroy                            41 Kauri Street, Cooroy
 Ambulance Station Tewantin                          4 Cooroy Noosa Road
 Ambulance Station Noosa Heads                       14 Langura Street, Noosa Heads
 Fire & Rescue Service Cooran                        50 Queen Street, Cooran
 Fire & Rescue Service Pomona                        2 Factory Street, Pomona
 Fire & Rescue Service Cooroy                        16 Myall Street, Cooroy
 Fire & Rescue Service Tewantin                      2 Hilton Terrace, Tewantin
 Fire & Rescue Service Noosa Heads                   2 Langura Street, Noosa Heads
 SES Boreen Point                                    Teewah Road, Boreen Point
 SES Pomona                                          21 Reserve Street, Pomona
 SES Cooroy                                          26 Emerald Street, Cooroy
 SES Tewantin                                        36 Goodwin Street, Tewantin
 Rural Fire Service Kin Kin                          57 Main Street, Kin Kin
 Rural Fire Service Black Mountain                   Mary River Road, Cooroy
 Rural Fire Service Boreen Point                     Davis Road, Cootharaba
 Rural Fire Service Teewah                           19 Mulloway Street, Teewah
 Rural Fire Service Noosa North Shore                Homeport Track, Noosa North Shore
 Rural Fire Service Tinbeerwah                       865 Sunrise Road, Tinbeerwah
 Coast Guard                                         Munna Point, Noosaville

Roads
 Name                           Suburb                  Width (2 or 4       Type
                                                        lane)               TMR controlled; Local
                                                                            Road of Regional
                                                                            Significance (LRRS);
                                                                            Critical Local Road (CLR)*
 Bruce Highway                  Within Noosa Shire      4 lane              TMR
 Gympie Kin Kin Road            Cootharaba              2 lane              TMR
 Pomona Kin Kin Road            Kin Kin                 2 lane              TMR
 Old Bruce Highway (?)          Federal                 2 lane              TMR
 Louis Bazzo Drive              Pomona                  2 lane              TMR
 Pound Road                     Pomona                  2 lane              TMR
 Factory Street                 Pomona                  2 lane              TMR
 Reserve Street                 Pomona                  2 lane              TMR
 Pomona Connection Road         Pomona                  2 lane              TMR
 Yurol Forest Drive             Pomona                  2 lane              TMR
 Elm Street                     Cooroy                  2 lane              TMR
 Myall Street                   Cooroy                  2 lane              TMR
 Tewantin Road                  Cooroy                  2 lane              TMR
 Cooroy Noosa Road              Cooroy                  2 lane              TMR
 McKinnon Drive                 Tewantin                2 lane              TMR
 Eumundi Noosa Road             Doonan                  2 lane              TMR
 Emu Mountain Road              Doonan                  2 lane              TMR
 Dr Pages Road                  Cootharaba              2 lane gravel       LRRS
 Kinmond Creek Road             Cootharaba              2 lane gravel       LRRS
 Cootharaba Road                Cootharaba              2 lane bitumen      LRRS
 Junction Road                  Cootharaba              2 lane bitumen      LRRS

Noosa Local Disaster Recovery Subplan 2018                                                     Page 58

Section 61

 Greenridge Pinbarren Road   Cooran           2 lane bitumen     LRRS
 Queen Street                Cooran           2 lane bitumen     LRRS
 Bridge Street               Cooran           2 lane bitumen     LRRS
 King Street                 Cooran           2 lane bitumen     LRRS
 Traveston Cooran Road       Cooran           2 lane bitumen     LRRS
 Cooroy Belli Creek Road     Cooroy           2 lane bitumen     LRRS
 Maple Street                Cooroy           2 lane bitumen     LRRS
 Myall Street                Cooroy           2 lane bitumen     LRRS
 Ernest Street               Tewantin         2 lane bitumen     LRRS
 Memorial Avenue             Tewantin         2 lane bitumen     LRRS
 Doonella Street             Tewantin         2 lane bitumen     LRRS
 Sidoni Street               Tewantin         2 lane bitumen     LRRS
 Poinciana Avenue            Tewantin         2 lane bitumen     LRRS
 Butler Street               Tewantin         2 lane bitumen     LRRS
 McKinnon Drive              Tewantin         2 lane bitumen     LRRS
 Cooroy Noosa Road           Tewantin         2 lane bitumen     LRRS
 Goodchap Street             Noosaville       2 lane bitumen     LRRS
 Gympie Terrace              Noosaville       2 lane bitumen     LRRS
 Hilton Terrace              Noosaville       2 lane bitumen     LRRS
 Mary Street                 Noosaville       2 lane bitumen     LRRS
 Gibson Road                 Noosaville       2 lane bitumen     LRRS
 Weyba Road                  Noosaville       2 lane bitumen     LRRS
 Reef Street                 Noosaville       2 lane bitumen     LRRS
 Beckmans Road               Noosaville       2 lane bitumen     LRRS
 Eenie Creek Road            Noosaville       4/2 lane bitumen   LRRS
 Eumundi Noosa Road          Noosaville       2 lane bitumen     LRRS
 Walter Hay Drive            Noosaville       4/2 lane bitumen   LRRS
 Hastings Street             Noosa Heads      2 lane bitumen     LRRS
 Noosa Drive                 Noosa Heads      2 lane bitumen     LRRS
 Sunshine Beach Road         Noosa Heads      4/2 lane bitumen   LRRS
 Noosa Parade                Noosa Heads      2 lane bitumen     LRRS
 Edwards Street              Sunshine Beach   2 lane bitumen     LRRS
 David Low Way               Sunshine Beach   2 lane bitumen     LRRS
 Heathland Drive             Sunshine Beach   2 lane bitumen     LRRS
 Main Street                 Kin Kin          2 lane bitumen     CLR
 James Street                Cooran           2 lane bitumen     CLR
 Middle Creek Road           Federal          2 lane bitumen     CLR
 Skyring Creek Road          Federal          2 lane bitumen     CLR
 Memorial Avenue             Pomona           2 lane bitumen     CLR
 Station Street              Pomona           2 lane bitumen     CLR
 Summit Road                 Pomona           2 lane bitumen     CLR
 Exhibition Street           Pomona           2 lane bitumen     CLR
 School Street               Pomona           2 lane bitumen     CLR
 Red Street                  Pomona           2 lane bitumen     CLR
 Tulip Street                Cooroy           2 lane bitumen     CLR
 Marara Street               Cooroy           2 lane bitumen     CLR
 Mary River Road             Cooroy           2 lane bitumen     CLR
 Emerald Street              Cooroy           2 lane bitumen     CLR
 Lake Macdonald Drive        Cooroy           2 lane bitumen     CLR
 Sunrise Road                Tinbeerwah       2 lane bitumen     CLR
 Werin Street                Tewantin         2 lane bitumen     CLR
 Pelican Street              Tewantin         2 lane bitumen     CLR
 Goodwin Street              Tewantin         2 lane bitumen     CLR
 Maximillian Road            North Shore      2 lane bitumen     CLR
 Beach Road                  North Shore      2 lane bitumen     CLR
 Wallace Drive               Noosaville       2 lane bitumen     CLR
 Sea Eagle Drive             Noosaville       2 lane bitumen     CLR
 Bartlett Road               Noosaville       2 lane bitumen     CLR
 Rene Street                 Noosaville       2 lane bitumen     CLR
 Russell Street              Noosaville       2 lane bitumen     CLR
 Lake Weyba Drive            Noosaville       2 lane bitumen     CLR

Noosa Local Disaster Recovery Subplan 2018                              Page 59

Section 62

 Langura Street                  Noosa Heads              2 lane bitumen      CLR
 Park Road                       Noosa Heads              2 lane bitumen      CLR
 Noosa Springs Drive             Noosa Heads              2 lane bitumen      CLR
 Bicentennial Drive              SunshineBeach            2 lane bitumen      CLR
 Ben Lexcen Drive                Sunrise Beach            2 lane bitumen      CLR
 Kingfisher Drive                Peregian Beach           2 lane bitumen      CLR
*Note:
    1. Includes all bridges and culverts on the listed roads
    2. Critical Local Roads (CLR) are roads that service community facilities/infrastructure, emergency
        services, important services infrastructure such as water or sewerage treatment plants or are the
        sole access to communities vulnerable during a disaster event and not already LRRS.

Ferry
 Location                           Owner                              Type
 Between Moorindil St, Tewantin     Noosa North Shore Ferries Pty      Vehicular
 & Maximillian Road, North          Ltd:
 Shore                              Ferry: 5447 1321
                                    Contacts: Cliff Andreassen
                                    0428 712 218 / 5449 9346 &
                                    Tom Smith 0428 497 443

Rail
 Station                                             Address
 Cooran                                              King Street, Cooran
 Pomona                                              10 Station Street, Pomona
 Cooroy                                              Elm Street, Cooroy

Electrical and water services
 Type                                 Lot & Plan                      Address
 Energex Zone Substation SST70-       Lot 1 RP174325                  Cooroy Mountain Road, Cooroy
 SSCRY
 Energex Zone Substation SSSRH        Lot 2 SP142258                  379 Eumundi Noosa Road,
                                                                      Noosaville
 Energex Zone Substation SSNVL        Lot 4 RP159386                  8 Reef Street (access via
                                                                      Nannygai Street) Noosaville
 Energex Zone Substation SSTWT        Lot 1 RP196624                  117 Eumundi Noosa Road,
                                                                      Noosaville
 Energex Zone Substation              Lot 2 SP216695                  20 Grahams Road, Pomona
 SSCOR
 Energex Zone Substation SSBMT        Lot 347 SP156926                59 Black Mountain Range Road,
                                                                      Black Mountain
 Energex Zone Substation SSPGN        Lot 5 RP858635                  Doonan Bridge East Road,
 (services Peregian, not in Noosa                                     Doonan
 Shire)
 Sewerage treatment plant             Lot 17 SP239726                 Cnr Eenie Creek Road & Wallum
                                                                      Lane, Noosa Heads
 Sewerage treatment plan              Lot 2 SP248288                  Mary River Road, Cooroy
 Water supply reservoir               Lot 23 RP862535                 Gumboil Road, Cooroy
 Water supply reservoir               Lot 25 CP862534                 Gumboil Road, Cooroy
 Water supply reservoir               Lot 1 RP226728                  Viewland Drive, Noosa Heads
 Water supply reservoir               Lot 1 CP907984                  347 David Low Way, Peregian
                                                                      Beach
 Water supply reservoir               Lot 1 RP105072                  7 Pine Tree Drive, Cooroy
 Sewerage pump station                Lot 7 MCH842016                 7 David Low Way, Marcus
                                                                      Beach
 Sewerage pump station                Lot 1 RP889602                  37 Banksia Avenue, Noosa
                                                                      Heads
 Water treatment plant                Lot 118 MCH814                  Lake Macdonald Drive, Cooroy




Noosa Local Disaster Recovery Subplan 2018                                                       Page 60

Section 63

7.3     Economic recovery
Disasters can cause devastating and widespread economic impact. Houses, businesses and
community infrastructure may be damaged or destroyed and people’s livelihoods may be
temporarily and sometimes permanently disrupted. While physical damage is the most visible
economic impact, less obvious impacts such as loss of income from disruption of trade can often
be more significant and extend well after infrastructure has been repaired or replaced.

7.3.1   Categories of economic impacts after disaster

Household:
 Loss of employment and/or income (loss of livelihood)
 Loss of household assets
 Instability or loss of social networks
 Increased costs due to short supplies of goods and services
 Lack of childcare and school facilities

Business and industry:
 Loss of supply chain networks
 Loss or damage to business assets
 Loss of employees due to business closure and migration of skilled staff
 Infrastructure damaged or devastated
 Damage to or loss of natural resources

Communities are economically disadvantaged when individuals are unable to work, either
because their place of employment has been impacted by the disaster event or by other
disruptions, such as school and childcare closures. Being able to work in paid employment or to
run a business profitably empowers affected individuals and motivates communities to regain
charge of their lives by meeting their own needs as they best see fit. The consequences of
extended periods of downtime in trading or production can result in:
 Loss of experienced workers
 Depleted customer base due to temporary or permanent population shrinkage
 Forced sale of stock
 Business closure or forced sale of businesses
 Bankruptcy

7.3.2   Economic impact assessment and needs analysis

Assessing the impacts of emergencies and disasters is integral to the recovery process. Impact
assessments provide communities and policy makers with invaluable information about how a
disaster manifested and what needs to be done to return the community to normal as well as
helping to identify strategies to build back stronger. These assessments can inform future
disaster risk management, as well as broader sustainability goals.

7.3.3   Measuring economic impact

Measuring the economic impacts of a disaster can be a complex undertaking and needs to be
strategic in nature. The principle reference for disaster loss assessment in Australia is the
Australian Institute for Disaster Resilience Disaster Loss Assessment Guidelines (Manual
27)(2002). It provides guidance on assessing disaster loss primarily for the purpose of planning
and justifying future risk mitigation and community resilience measures.

Due to the complexity of undertaking an economic impact assessment some specialist expertise
will be required. At a minimum some members of the Economic Subgroup should have formal
experience or training in disaster loss assessment or economics.

Noosa Local Disaster Recovery Subplan 2018                                              Page 61

Section 64

Economic impact assessment attempts to quantify in dollars all impacts (both costs and benefits)
possible. Importantly, the assessment applies not only to goods and services that are
traditionally traded in the market place, but also to the value attributed to social and environmental
assets. Economic impact assessments are conducted to ensure long-term economic outcomes
can be visualised and planned for.

7.3.4    Economic impact versus financial impact

Economic impact assessment is distinct from financial impact assessment. Economic impact
assessment includes all impacts on a community while financial impact assessment often
concerns a single economic unit such as an industry, business or household. In the early stages
of recovery, the Economic Subgroup may well focus on the conduct of a series of financial impact
assessments across sectors, which will in turn collectively help inform the overall economic
impact assessment.

7.3.5    Tangible versus intangible impacts

As well as direct and indirect impacts, economic impacts are typically divided into tangible and
intangible impacts:
 Tangible impacts – the loss of things that have a monetary (replacement) value e.g.
    buildings, livestock, infrastructure
 Intangible impacts – the loss of things that cannot be bought and sole e.g. lives and injuries,
    environment, memorabilia, heritage

Tangible impacts are typically easier than intangible impacts to replace and assign a dollar value
to because they are traded in the market place. Intangible impacts are much harder to assess.
Intangible impacts are often described as a ‘catch all’ that includes all those costs that are very
difficult to estimate, for which there is no agreed method of estimation and for which there is no
market to provide a benchmark. However, they should be considered and included appropriately
in impact assessments.

7.3.6    Direct and indirect economic impacts on key community sectors

The table below lists some of the economic impacts on the community that will require
consideration in an assessment:

   Sector / area of
                                       Direct                                Indirect
       impact
 Residents and             structural (roofs, walls etc)         additional costs - alternative
 households                contents (furniture, floor             accommodation and transport,
                            coverings etc)                         heating, drying-out costs,
                           external (swimming pools,              medical costs etc
                            gardens etc)
                           death and injury
 Public infrastructure,   Damage to or loss of                    transport (traffic delays, extra
 community facilities                                              operating costs etc)
                             roads
 and natural                                                      loss of computer-controlled
 environment                 bridges
                                                                   systems
                             dams
                                                                  loss of other lifelines
                             sports grounds and facilities
                                                                   (electricity etc)
                             schools
                             halls
                             parks
                             waterways
                             bushland


Noosa Local Disaster Recovery Subplan 2018                                                    Page 62

Section 65

   Sector / area of
                                     Direct                             Indirect
       impact
 Business               Structural damage to              Impact on production
 enterprises and
                              buildings                         manufacturing,
 supply networks
                              shops                             agriculture
                              factories                         services etc
                              plants                     Impact on
                              sheds
                              barns                             income
                              warehouses                        trade
                              hotels etc                        sales
                                                                 value added (tourism
                        Asset damage or loss:                     operators, retail traders
                              farm equipment                     etc)
                              food                       Increased costs
                              records
                              product stock (finished           freight
                               manufactured products,            inputs
                               works in progress and             agistment etc.
                               input materials)           Loss of supply chain networks
                              crops
                              pastures                   Increased work (construction
                              livestock                  industry)
                              motor vehicles             Opportunity to renew struggling
                              fences or irrigation       business
                               infrastructure
                              contents damage to
                               fixtures and fittings
                               (carpets etc)
                              furniture
                              office equipment
                              virtual business
                               interruption.
 Government             Loss of income – for example if      costs of implementation of
                        population base shrinks or            royal commission
                        council waives tip fees as a          recommendations
                        gesture of goodwill                  increased demand on
                                                              government services
                                                              (education, health etc)
                                                             loss of business continuity
                                                              (state government may
                                                              provide case management
                                                              involving significant resources
                                                              to be redeployed immediately
                                                              for long periods)
                                                             loss of tax revenue
                                                             cost of engaging extra
                                                              resources and/or backfilling
                                                              positions




Noosa Local Disaster Recovery Subplan 2018                                              Page 63

Section 66

7.3.7   Guidelines for economic recovery

The following provide guidance to the Economic Subgroup in developing economic recovery
programs after a disaster:
 Economic recovery strategies are an integral part of the overall recovery management
   process
 Coordination of all recovery programs is needed to support and enhance the economic
   structure
 It is important to recognise that affected people need to re-establish their means of making a
   living to enable them to manage their own recovery
 Response and recovery actions actively support the recovery of business and industry
 The best outcomes are achieved when business and industry is returned to activity as early
   as possible
 Adaptive change is adopted in light of previous knowledge of the sustainability of business
   and communities, and strategies
 Business and/or industry representatives must participate in economic recovery decision
   making
 It is important to retain skilled workers in the affected area through paid employment
 It is important that measures are taken to mitigate the impacts of future disaster on business
   continuity

7.3.8   Economic recovery – management strategies

Examples of specific management initiatives include:
 Formulate short-term business survival strategies
 Identify all aspects of the economic impact of a disaster and continue to assess, analyse and
   monitor to inform the level of support required by community
 Plan from the beginning for the transition back to mainstream service provision
 Establish and maintain communication channels between community, business, industry and
   government representatives in the community
 Proactively seek and involve investment and technical assistance parties from within and
   outside affected communities
 Facilitate local advisory groups as required that are representative of business, industry and
   employee groups
 Ensure communication strategies incorporate information around economic recovery support
   to the broader community
 Support and facilitate the development and maintenance of partnership arrangements to
   enhance economic activities
 Establish positive images to attract visitors when appropriate
 Report information on the effectiveness of the economic recovery program to all stakeholders
 Develop risk management assessments for the economic recovery rpgram
 Avoid duplication of services and identify gaps
 Maintain confidentiality and privacy principles
 Ensure monitoring, evaluation and reporting processes are embedded in all economic
   recovery activities

7.3.9   Economic recovery – enabling initiatives

Examples of other initiatives include:
 Procure goods and services via local businesses and tradespeople wherever practical e.g.
   use local electricians for power safety checks and repairs, encourage agencies to employ
   local residents and to purchase resources and services locally
 Encourage response agencies to implement procedures to support economic recovery e.g.
   local employment program for clean-up
 Support and promote opportunities for sustainable economic recovery

Noosa Local Disaster Recovery Subplan 2018                                              Page 64

Section 67

   Actively work and/or negotiate with financial institutions on behalf of affected people and
    businesses
   Value and build on the local capacities of services that support economic activities childcare
    services and non-profit groups
   Build on local, regional, state or territory industry and business organisations and their
    networks e.g. home business network, tourism boards, chambers of commerce
   Encourage the community to buy locally through known and trusted businesses
   Facilitate the creation of work placement projects e.g. clean up activities
   Provide short-term paid employment to retain skilled workers in their current location while
    they await their former place of employment to recovery and re-open
   Facilitate the provision of government grants, appeal distribution and charitable payments as
    financial, rather than material assistance in support of economic and local business recovery

7.3.10 Financial services

The purpose of financial assistance measures is to support those in need, while encouraging
appropriate personal responsibility. Resilience and preparedness, such as appropriate and
adequate levels of insurance, are to be encouraged.

The recovery of communities from the effects of emergencies and disasters is assisted by a
range of financial measures which provide a source of funds to businesses, local and state
government, householders and the community to assist with and promote recovery. These
sources include insurance and may also include government provided natural disaster relief and
public appeals.

Assistance may also be provided by banks e.g. the suspension of mortgage or loan repayments
and provision of financial counselling and advice, and the Australian Taxation Office has
information to guide tax payers who have been affected by a disaster.

Communities should be encouraged to explore their own resources, and to plan and be prepared
for an emergency event. Changing community expectations and the political landscape have
historically impacted on the provision of financial services.

The need for financial assistance measures such as insurance, federal and state government
assistance and appeals are critical after a disaster because of the effect on people’s employment
and livelihoods.

7.3.11 Insurance

Insurance is the primary means of gaining financial compensation for the cost of restoration. The
major types of insurance cover are for home and contents, income protection and property and
business interruption.

The Insurance Council of Australia assists people affected by a disaster to navigate and negotiate
the insurance process through the Insurance Taskforce Catastrophe Coordination Arrangements
(2012) by providing:
 Senior industry representation to the state and federal recovery groups
 A 24hr escalation path for insurance queries from the impacted community
 Key insurance data and decision support to the community and government
 Clear public communication about the insurance response to the event
 Liaison between insurers, assessors, brokers, trades, suppliers at an industry level on issues
    of collective importance to delivering services to the impacted community

The Economic Subgroup should consider involving Insurance Council of Australia participation
in insurance and insurance claim matters arising from the disaster.


Noosa Local Disaster Recovery Subplan 2018                                                Page 65

Section 68

7.3.12 Public-private partnerships (PPP)

PPPs can capture the goodwill that exists in the private sector and its willingness to be part of
the recovery process. They do not include the normal procurement that enables services to be
provided and they do not necessarily involve exchange of money. An example is the provision
of goods or services following a disaster by a private enterprise to a relief agency that is covered
by a memorandum of understanding. These partnerships can increase capability to respond in
a timely manner, and can provide a mechanism to assist the smooth provision of services.

In preparing and planning it is useful to consider the PPPs that could be established prior to an
event to assist with contingency planning. Traditionally, corporate support has been a
spontaneous response to an emergency event and needs to be negotiated after the event has
taken place and taking into account the needs of a community.

For PPPs that can be established as part of preparedness and planning, consideration should
be given to:

   Identifying goods and services that can be procured through this means
   Establishing and identifying accredited / licensed / certified suppliers, and seeking indicative
    costs to avoid cost inflation or profiteering post-impact e.g. to provide food and supplies to
    individuals at recovery centres
   Including local suppliers in recovery efforts where possible
   Establishing links between non-regional and local suppliers to retain local employment
   Establishing links between non-regional and local suppliers that are able to continue or re-
    commence trading to keep money in the community
   Documenting partnerships between suppliers – use of non-regional suppliers needs to be
    handled with some sensitivity for local suppliers

7.3.13 Steps to economic recovery

Step 1: Conduct post-disaster economic and financial impact studies

The Economic Subgroup should seek to perform economic and financial impact studies where
necessary and appropriate. Financial impact studies will focus on specific economic units such
as a business or a sector of the community. An economic impact study should build upon these
financial impact studies to determine the overall impact on the economy. Both financial and
economic impact studies will build upon the initial damage assessments undertaken during
response operations. These impact studies should be conducted as quickly as possible following
the disaster. They provide intelligence for decision-makers and support any requests for the
state or federal governments to provide appropriate funds for rebuilding and recovery. These
impact studies assess both physical damage (properties, inventories etc) and economic damage
to industry and the local economy.

It is likely that there will be many challenges in acquiring both pre-disaster and post-disaster data,
particularly in an initial chaotic environment immediately after the disaster impact. This
emphasizes the need to identify the stakeholders and include them either on the subgroup or as
members of local advisory groups.

As far as possible the studies should measure the following economic impacts:
 Job loss
 Loss of wages
 Business closures and interruption (loss of productivity)
 Damage to infrastructure
 Damage to property (commercial, industrial, residential)
 Damage to natural resources which have an impact on local industries



Noosa Local Disaster Recovery Subplan 2018                                                   Page 66

Section 69

Step 2: Initiate a post-disaster economic recovery assessment and planning process

The LRC should take the lead in initiating the economic recovery planning process with support
and engagement from state government agencies, Council, other businesses, industry groups,
civic and community organisations (see Terms of Reference for the Economic Subgroup). This
process should begin as soon as possible after the disaster event to take advantage of the sense
of urgency and unity following a disaster and to ensure strategies and resources of economic
recovery can be planned for and acquired.

Step 2a: Identify the roles and responsibilities of all economic recovery stakeholders
Confirm roles and responsibilities among partner organisations for all phases of recovery.

Step 2b: Establish local or industry advisory groups to gather relevant data and
information
Local Economic advisory groups should be established to cover major topics e.g. business
retention, small business assistance, tourism promotion etc. Each advisory group should have
a chairperson and be responsible for compiling relevant data. The Group can also begin
identifying major issues and suggesting strategies and resources to address those issues.

Step 2c: Produce a complete economic analysis, including financial assessments
This economic analysis needs to include a detailed look at key industries and anchors and
specific quantitative and qualitative data on how they have been impacted by the disaster. This
analysis will provide insight into the current state of the economy including whether economic
development targets should be re-evaluated, a better understanding of competitive positioning;
and will lay the foundation for a long-term economic development strategy for the community.

It may be beneficial to have a third party conduct this economic analysis, due to:
 Limited local capacity issues
 Assurance of a speedy planning process
 The need for a fresh perspective on the situation

The following steps will assist with the economic analysis:
 Reviewing existing strategic plans and studies for relevancy, evaluate existing business
   development targets and revisit economic issues
 Solicit information and input from local advisory groups
 Conduct additional focus groups around key topics and help identify specific challenges and
   opportunities
 Conduct economic development forums with various stakeholders (economic developers,
   planners, local government, businesses, citizens etc) to focus on specific geographic areas
   such as Noosa Heads, the eastern beaches, industrial areas, shopping centres, rural towns
   and rural residential areas; or functional areas like tourism precincts or primary production

Step 3: Fully assess the situation on the ground

It is important to take the time to really understand the post-disaster economic analysis before
any actions are proposed or implemented. A deep understanding of the current situation will
provide critical insight on how the community should move forward.

Step 4: Create an action plan outlining strategies, programs and activities to be
undertaken to achieve economic recovery

Create action plans to provide direction on economic recovery priorities. The plans should be
updated as needed.




Noosa Local Disaster Recovery Subplan 2018                                              Page 67

Section 70

Seek to:
 Include a phased approach to economic recovery where clear goals and objectives are set
   for the short, medium and long term recovery. Emphasis should be placed on long-term
   goals to ensure transition between economic recovery and long-term development. This
   could be for many years
 Assign appropriate organisations to take ownership of and carry out each task
 Ensure these organisations have the resources to carry out each task in terms of capacity,
   ability and financial means. Seek additional resources as necessary.
 Ensure that business retention and expansion is addressed before any new business efforts
   take place. Existing businesses are the ones that are most likely to rebuild the economy.
 Ensure that strategies and actions are specific with measureable outcomes to provide a basis
   for monitoring progress

Step 4a: Coordinate the action plan with the development of an effective communications
strategy

The public should be aware of the planning effort and how time, resources and funds will be
priorities.

7.3.14 Checklist for economic recovery

Components
Each component may be directly or indirectly affected and the impacts might be tangible or
intangible.
 Residents and households
 Public infrastructure (water, sanitation systems, electricity, telecommunications and
    transport), community facilities and the natural environment
 Business enterprises and supply networks, peak bodies and not-for-profit sector
 Government

Partners / stakeholders
 Affected communities
 Local industry and business
 Industry bodies
 Government agencies
 Local government
 Insurance Council of Australia
 Banking and financial operators
 Charitable organisations
 Others as required

Immediate operational activities
 Emergency cash grants
 Access to banking and finance
 Facilitation of insurance claims
 Management of appeals donations
 Information
 Identification and support to businesses and employers

Short to medium term operational activities
 Support with insurance claims
 Access to employment
 Renegotiation of loans
 Assistance with grant applications
 Support with rebuilding contracts
 Support to small, medium business
Noosa Local Disaster Recovery Subplan 2018                                            Page 68

Section 71

     Restore banking and other financial services as soon as possible
     Reopen businesses and restore community services
     Set up business assistance facilities as required
     Assess employment issues
     Establish a communications strategy to support local businesses to re-establish or remain
      open
     Work with the insurance sector to ensure coordinated response by insurance companies and
      address adequacy of cover for reconstruction
     Develop a fast-track insurance processing system and address insurance issues
     Liaise with the LRG and other LRG subgroups to develop a strategy to maximise use of local
      resources during reconstruction and establishment activities
     Identify transport and information technology/communications needs and prioritise
      reconstruction activities to meet community business and manufacturing continuance
      requirements
     Facilitate, where required, new mutual aid agreements between authorities and contracts with
      suppliers
     Support small to medium enterprise e.g. advice, referral to a business advisor etc
     Re-establish retail and commercial facilities essential for community wellbeing or recovery
      activities

Long term operational activities
 Examine viability and appropriateness of damaged or destroyed business to the community
 Identify opportunities to upgrade business infrastructure
 Identify opportunities to establish new businesses and services
 Where possible, restore business and infrastructure to be sustainable and more resilient to
   future events
 Prioritise and secure supply chains
 Re-establish commercial, retail and distribution infrastructure
 Support the restoration of rural infrastructure
 Reassess employment and livelihood issues
 Explore need and opportunities for ongoing local business support network
 Communicate planned actions to affected communities, recovery management team and
   stakeholder organisations


7.4        Environmental recovery
7.4.1      Components of environmental recovery

The ways in which damage to the natural environment impacts on the community, infrastructure
and the economy are considered in other parts of this plan. This section deals with the effects
of a disaster on Noosa’s ecosystems particularly:
 The air
 The coastline
 Water and rivers
 Land and soil (including organic matter)
 Plants and animals

The table below outlines some of the effects if impact of disasters on our natural ecosystems:

    Component of the
                       Aspects of this component relevant
          natural                                                Some examples of effects
                            to disaster management
        environment
    Air                   particulates                        immediate: asthma cases
                          chemicals                           longer term: deposition of
                          biological aerosols                  particulates residues on assets
                          radiation

Noosa Local Disaster Recovery Subplan 2018                                                  Page 69

Section 72

 Component of the
                         Aspects of this component relevant
     natural                                                          Some examples of effects
                              to disaster management
   environment
                                                                    dust from wind erosion—
                                                                     denuded landscape (fire, drought)
                                                                    heatwave deaths
                                                                    deaths from bushfire smoke
                                                                     affecting air quality
 Coastline                  oil and chemical contamination         oil spill contaminating beaches
                            changes to the coastline               severe storm eroding beaches
                                                                     and sand dunes
                                                                    changes to river mouth
                                                                    debris washed onto beaches
 Water and rivers:       Quality:                                •   impact on economic production
 • surface water         • biological contamination                  from loss of irrigation systems
 • ground water          • particulate contamination             •   loss of capacity (drinking water
 • marine                • chemical contamination                    etc)
 • artificial storages   • dissolved oxygen levels/ quality in   •   severe flooding and erosion
                            waterways                            •   changes to ecosystems

                         Quantity
                         • changed river flows
                         • changed groundwater storage
                         • flow regimes
                         • biological contamination/
                            introduced pests
 Land and soil:          • loss and movement - erosion           •   significant erosion after a fire or
 • landscapes                 and/or deposition                      flood, earthquake or cyclone can
 • rocks                 • quality and condition -                   change the course of waterways,
 • soil                     contamination                            reduce the productivity of
 • geo-heritage          • changes to soil—acidification,            farmland and create erosion risks
                            structure change, compaction             for infrastructure both up and
                         • damage to landforms and                   down stream
                            landscapes                           • impacts on flora and fauna.
                                                                     Including natural, cultural and
                                                                     geo-heritage sites
 Plants and animals      •   loss of species and populations     Increased interaction between
                             (biodiversity), especially          wildlife and humans due to animals
                             threatened species                  being
                         •   change in abundance of species      • disorientated,
                         •   predators                           • displaced
                         •   competitors                         • vehicle collisions
                         •   changes in recruitment -whether
                             seedlings can survive               Undesirable impacts:
                         •   loss of habitat                     • kangaroos/rabbits grazing in
                         •   disease                                gardens,
                         •   pollination                         • noisy birds (such as corellas)
                                                                    concentrated in civic areas
                                                                 • foxes coming into yards and
                                                                    killing domestic animals or
                                                                    spreading disease to pets
                                                                 • introduced predators
                                                                    concentrating on native species
                                                                    and livestock remaining in the
                                                                    landscape (advantaged by no
                                                                    harbour for wildlife). This can
                                                                    wipe out threatened species and
                                                                    can impact on farm
                                                                    production/survival.
                                                                 • weeds are first to establish on




Noosa Local Disaster Recovery Subplan 2018                                                        Page 70

Section 73

 Component of the
                      Aspects of this component relevant
     natural                                                            Some examples of effects
                           to disaster management
   environment
                                                                      bare ground and can outcompete
                                                                      native plants and
                                                                      agriculture/pasture plants.
                                                                  •   birds may move out of the area
                                                                      thereby reducing pollination
                                                                      activity and/
                                                                  •   or allowing insect activity to get
                                                                      out of balance.


7.4.2      Environment impact assessment and needs analysis

Usually environmental impact statements (EIS) are designed to assess and protect
environmental values where development is proposed. These procedures can easily be adapted
to the post-disaster situation to identify significant ecosystem attributes and the likely impacts
from the disaster.

An EIS usually includes a broad survey of the impacted area, usually through desktop analysis
of existing data resources and, if required, the use of survey methods. Attached below is an
initial environmental impact assessment carried out by Sunshine Coast LDMG after ex TC
Oswald (2013):

  Local Government Area                       Sunshine Coast Council
                                              Noosa beaches have been eroded by high tides and waves
                                              generated by ex-TC Oswald. There have been reports of
                                              seawall failure at some locations. Most beaches have been
                                              closed to the public due to high seas and erosion. Council can
                                              actively manage the beach area to reduce safety hazards
                                              associated with high erosion scarps on dunes under an existing
                                              minor works guideline prepared by EHP. This may also include
  Coastal                                     the removal of debris.
                                              Coastal areas and structures suffered erosion and damage by
                                              high tides and waves. Tidal works required to protect and
  Debris                                      recover areas and structures.
                                              Newly constructed landfill liner inundated with flood waters. TEL
                                              issued to release flood water. No further recovery effort
  Landfills                                   required.
                                              Closed - Croamhurst Conservation Park; Cooloola (Noosa
                                              River) Resources Reserve. Partly open - Dularcha National
                                              Park; Bribie Island National Park; Kondililla National Park;
                                              Maleny National Park; Mapleton Falls National Park; Mapleton
                                              National Park; Mooloolah River National Park; Parklands
                                              Conservation Park; Ringtail Forest Reserve; Tuchekoi National
  Protected Area Estate                       Park.
                                              EHP Southern Region: 4 TEL applications received. 3
                                              approved, 1 refused. Noosa Shire Council landfill - approved
                                              31/1/13; Transpacific Industries, Bundaberg - approved 1/2/13;
  Temporary Emissions Licences (TELs)         Holicim, Toowoomba - refused 1/2/13; Holicim approved 6/2/13
  Local Council advice
  Contact: Michael Anderson
                                                      European heritage sites damaged through sewer/
  [email protected]
                                                       flooding issues/ coastal erosion (WW2 bunkers on
                                                       Bribie)
                                                      Region wide coastal erosion
                                                      Bribie island break through issue
                                                      Increased sediment movement through rivers to open
                                                       ocean including impacts on near shore ecology/ reefs,
                                                       impacts on coastal ICOLL fish breeding habitats
                                                      Landslips at a number of sites
                                                      Loss of dunal vegetation from erosion
                                                      Vegetation dieback from foam impacts
                                                      Increased midden site exposure due to erosion
                                                      Turtle nest lost due to erosion (16 nests)

Noosa Local Disaster Recovery Subplan 2018                                                             Page 71

Section 74

  Local Government Area                      Sunshine Coast Council
                                                   Vegetation loss and damaged throughout the
                                                    protected area network (including significant hollow
                                                    bearing trees)
                                                   Significant riverbank/ creek bank erosion issues and
                                                    assoc riparian vegetation loss
                                                   Damage to protected area infrastructure – e.g.
                                                    signage/ trails/ fire tracks
                                                   Seagrass decline
                                                   Sewer network failure and associated contamination
                                                    issues (e.g. reduction of DO levels)
                                                   General debris and aquatic weed movement through
                                                    waterways
                                                   Increased acid sulphate leachate movement from
                                                    development sites
                                                   Exotic fish movement through waterways (e.g. Ewen
                                                    Maddock Dam)
                                                   Public health/ hygiene issues associated with wide
                                                    spread event factors such as power loss e.g. food/
                                                    water contamination
                                                   Able to provide specific examples of each of the listed
                                                    items above if needed.



In some cases, ecological survey techniques need to be employed to assess specific concerns
or to gain a broad audit of natural environmental impacts and likely consequences of the disaster.
A rapid response research capacity following a large-scale natural disturbance assists in
understanding the ecosystems’ dynamics and long-term consequences of natural disasters.

7.4.3    Interaction with the other functions of recovery

Often there is a high level of activity post-disaster to restore infrastructure services and ‘normal’
environmental considerations may be bypassed e.g. seeking vegetation clearance approvals.
Although quick action is essential, good environmental practices, if built into the process
beforehand, can still be applied. The LRG should consider any competing outcomes between
the environmental recovery effort and that of the other functions of recovery.

Noosa will seek a balanced approach to environmental recovery and abide by the objectives and
principles of the National Strategy for Ecologically Sustainable Development (1992)

7.4.4    Using an environmental risk management approach

Given the complexity of the natural environment it is likely that there will be significant uncertainty
in managing environmental recovery. Decisions will often involve lengthy time spans and
assumptions about projected impacts and may involve significant uncertainty. Using a risk
management approach may help determine the environmental risks and how best to treat them.
Such an approach provides a structure, systematic approach to decision making:
 Establish the context for recovery of the environment
 Identify environmental risks
 Analyse environmental risks
 Evaluate environmental risks
 Treat environmental risks
 Monitor and review
 Communicate and consult

Below is a table that gives examples of options or strategies for treating risk in the natural
environment:




Noosa Local Disaster Recovery Subplan 2018                                                          Page 72

Section 75

            Air                              Water                Land and soil        Plants and
                                                                                       animals
 Monitor/   •     emissions (source) air     •   drinking water   •   soil stability   •   establish
 observe          monitoring program             sampling             and erosion          survival of
            •     ambient (community)            program              potential            and current
                  air monitoring             •   recreational         surveys              threats to
                  program                        water body       •   soil                 important
            •     personal (recovery             sampling             contamination        species
                  Worker) air monitoring     •   natural water        assessments      •   flora/fauna
                  program                        body                 and                  surveys
            •     deposition (fall out)          sampling             environmental
                  monitoring program             program              and health
                                                                      risk
                                                                      assessments
                                                                  •   topsoil
                                                                      capability for
                                                                      regeneration
                                                                      of flora
 Prevent/   •     aerial incendiary          •   keep people                           •   implement
 avoid            practices                      out of                                    hygiene
            •     whether or not to put          contaminated                              protocols to
                  hazardous materials            waterways                                 prevent
                  fire out—let it burn out   •   remove oils,                              spread of
                  and get the oxygen             fuels etc from                            disease to
                  out or stop it burning         wrecked                                   /within the
                  so it doesn’t                  vehicles etc                              natural
                  contaminate the air        •   recycling of                              environment
            •     extinguish fires               wastes to                             •   keep livestock
            •     there may be                   minimise                                  out of
                  occasions where the            discharges or                             sensitive
                  decision is made that      •   impacts on                                areas by
                  the benefits gained by         water                                     fencing (to
                  allowing the fire to           resources                                 avoid grazing
                  burn outweigh the                                                        impact,
                  smoke pollution.                                                         improve
                  Assessment should                                                        recovery of
                  always be based on                                                       plants)
                  the fire rather than the                                             •   hygiene
                  smoke pollution                                                          protocols
            •     in planning post fire                                                •   controlling
                  recovery of an                                                           where
                  ecosystem sufficient                                                     machinery
                  time for recovery must                                                   goes so it
                  be given before the                                                      doesn’t
                  next control burn is                                                     impact on
                  implemented.                                                             certain
                  Frequent fire too often                                                  /threatened
                  can reduce floral                                                        species
                  biodiversity, such as                                                •   replacement
                  in dry sclerophyll                                                       of nesting
                  eucalypt or heathland.                                                   boxes where
                  Refer to SEQ fire and                                                    they are a
                  biodiversity guidelines                                                  part of a
            •     prevent dust lift off by                                                 monitoring or
                  stabilising land/use of                                                  research
                  fencing, mulching etc                                                    program
            •     manage wastes to                                                     •   supporting the
                  prevent emissions                                                        welfare of fire-
            •     manage pesticide                                                         affected
                  applications to                                                          wildlife
                  prevent spray drift




Noosa Local Disaster Recovery Subplan 2018                                                         Page 73

Section 76

            Air                           Water                 Land and soil        Plants and
                                                                                     animals
 Reduce/    •     treat air emissions     •   use booms,        •   rehabilitating   •   control of
 minimise         (e.g. apply water           filters on oil        control lines        introduced
                  sprays, filters,            spills                minimises the        predators at
                  containment) to                                   potential for        key sites to
                  reduce the volume                                 erosion              protect
                  and/or render the                                                      threatened
                  emission less harmful                                                  species and
            •     minimise impact on                                                     livestock
                  the environment                                                    •   conduct works
                  through response                                                       to minimise
                  techniques/practices                                                   the potential
            •     minimise exposure to                                                   for invasion of
                  humans and animals                                                     weed species
                  by keeping them                                                        to ground
                  away from the area                                                     made bare
                  where the air is                                                       from wildfire
                  contaminated                                                           and along
                                                                                         waterways
 Render                                   •   filter            •   interventions
 harmless                                     contaminated          between
                                              water to              hillsides and
                                              remove                creeks (such
                                              suspended             as straw/wire)
                                              solids,               to stop hill
                                              chemicals,            creep and
                                              biological            sedimentation
                                              hazards               in creeks
 Mitigate   •     limit the exposure of   •   composting                             •   translocate
 the              people and animals to       practices for                              key (e.g.
 effects          areas of air                disposal of                                highly
                  contamination               carcasses—                                 threatened)
            •     decontaminate plants,       less impact                                species to
                  animals, buildings,         on the water                               safer
                  equipment                   table                                      refuge
            •     provide suitable        •   wildlife rescue                            (including into
                  protection and safety   •   temporary                                  captive
                  for recovery                habitat                                    breeding
                  volunteers                  construction                               facilities if
                                              and feeding                                necessary) to
                                          •   cleaning of                                ensure
                                              rain water                                 survival of the
                                              tanks,                                     species
                                              replacement
                                              water                                  •   replace
                                              supplies and                               protective
                                              filtration                                 fencing
                                                                                         around
                                                                                         threatened
                                                                                         plants to
                                                                                         exclude
                                                                                         browsing and
                                                                                         grazing
                                                                                         animals such
                                                                                         as rabbits,
                                                                                         deer and
                                                                                         kangaroo
 Offset                                                                              •   where an
 the                                                                                     event causes
 damage                                                                                  irreversible
                                                                                         damage to
                                                                                         high-priority

Noosa Local Disaster Recovery Subplan 2018                                                       Page 74

Section 77

            Air                        Water          Land and soil   Plants and
                                                                      animals
                                                                          vegetation,
                                                                          selecting a
                                                                          separate
                                                                          patch of land
                                                                          for restoration
                                                                          may be an
                                                                          acceptable
                                                                          offset
                                                                      •   provision of
                                                                          artificial
                                                                          nesting boxes
                                                                          can provide
                                                                          temporary
                                                                          habitat for
                                                                          displaced
                                                                          animals
                                                                          (shelter from
                                                                          weather and
                                                                          predators,
                                                                          provide safe
                                                                          breeding etc)
                                                                      •   high-priority
                                                                          vegetation
                                                                          that has been
                                                                          devastated by
                                                                          a bushfire—
                                                                          select a
                                                                          separate
                                                                          patch of land
                                                                          for
                                                                          reafforestation
                                                                          over a period
                                                                          until the initial
                                                                          area has
                                                                          recovered


7.4.5   Checklist for environmental recovery

Components
 Air
 Water and rivers
 Coastline
 Land and soil
 Plants and animals

Partners / stakeholders
 Affected communities
 Government agencies
 Local government
 Landcare, ‘friends of’ environment groups
 Wildlife rescue services
 Catchment management authorities
 Others as required, depending on event and local needs




Noosa Local Disaster Recovery Subplan 2018                                         Page 75

Section 78

Immediate operational activities
 Conduct risk management
 Make an immediate impact assessment
 Identify priority needs for the natural environment
 Containment of contaminants
 Rescue of wildlife
 Emergency erosion stabilisation
 Emergency action for threatened species
 Management of stormwater runoff
 Restoration of habitat

Short to medium term operational activities
 Clean-up of contaminants
 Rehabilitation of damaged areas
 Ongoing care and management of endangered species and injured wildlife
 Response operations damage restoration
 Ecological impact assessments
 Management of ongoing erosion
 Prevention of further contamination – weeks invasion, fungal disease from response and
   recovery operations
 Restoration of social amenity
 Recovery of damaged natural resources
 Restoration of social amenity elements essential for community wellbeing

Long term operational activities
 Improve / upgrade amenity and/or ecosystems from previously degraded conditions
 Restore natural environment elements to be sustainable and more resilient to future events




Noosa Local Disaster Recovery Subplan 2018                                           Page 76

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.