Dept Transport & Main Roads Appointed in liaison with Sunshine Coast District Disaster
Coordinator
Tourism Noosa General Manager Tourism Noosa
Community Representatives Appointed on an as-needs basis
Business and Industry Appointed on an as-needs basis
Representatives
3.1.4 Local Recovery Coordinator
The Local Recovery Coordinator (LRC) is appointed as a function within the LDMG to ensure
recovery preparedness and to lead recovery operations. The person appointed as the LRC
cannot be the same person as the LDC or the LDCC Community Liaison Officer as disaster
operations and recovery planning need to occur simultaneously.
The Noosa Council has appointed the Director Community Services to be the Noosa Local
Recovery Coordinator.
The role of the LRC is to:
Maintain this Subplan
Develop community recovery preparedness
Ensure ongoing analysis of need is undertaken throughout the recovery effort to guide the
recovery effort
Work with the LRG, relevant agencies and the community to develop the specific aim,
objectives and strategies of the Recovery Operational Plan
Liaise with functional lead agency representatives to obtain required support for recovery
programs and activities
Manage the implementation of the Recovery Operational Plan and subgroup Action Plans
with the assistance of the LRG, subgroups, Sunshine Coast District Recovery Group and
State Recovery Group
report on the recovery effort to the Disaster District, and the State Recovery Coordinator as
well as the community
The LRC and the LDC should liaise regularly during disaster response operations. This will
ensure that disaster response operations support the recovery effort and recovery planners have
good situational awareness to ensure their planning is relevant to the community.
The LRC should be involved in disaster response planning and implementation in addition to the
role of leading the recovery effort. This duality of roles immediately after disaster impact is often
inevitable given the limited management resources available within the Noosa Council. While
the LRC may need to be involved in operational response matters from time to time, they should
focus on the recovery implications of such matters to ensure response supports the recovery
effort.
3.1.5 Functional subgroups
Up to four subgroups may be established to address each of the four functions of recovery in
Noosa Shire:
Human and Social Subgroup
Infrastructure Subgroup
Economic Subgroup
Environment Subgroup
Subgroups are “working groups” of the LRG and comprise the subject matter specialists relevant
to a particular function of recovery. They develop and oversee the implementation of the plans,
activities and programs related to their recovery function.
Noosa Local Disaster Recovery Subplan 2018 Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.