7.2.9 Key steps in infrastructure recovery
The key steps include:
Understand what needs to be done to recovery
Identify external constraints and internal organisational restraints
Priories tasks
Put in place short term / interim fixes
Identify the resource and material requirements
Strategic planning including long term recovery outcomes.
7.2.10 Infrastructure needs assessment
Infrastructure assessments may be categorised into three separate activities:
Initial assessments which are usually undertaken in the first few hours after impact during
the response and immediate/short term (relief) state of disaster management. These
assessments usually only provide an indication of the scale of the problem and allow for
response and relief operations.
Rapid impact assessments which are usually conducted within the first 24 to 48 hours after
impact and involves the sending out of damage assessment teams to make first hand
assessments. Rapid impact assessment can be undertaken by Queensland Fire &
Emergency Services (Fire & Rescue).
Detailed assessments which are normally conducted after the disaster response phase and
which inform the development of the Recovery Operational Plan and the Infrastructure
Recovery Action Plan. These assessments will normally be undertaken by individual
agencies and coordinated by a suitably qualified person appointed by the Director
Infrastructure Services.
When gathering information for infrastructure recovery assessments the subgroup should
consider:
Power
Water and sewerage
Waste disposal infrastructure
Roads and bridges
Rail
Communication networks, including exchanges
Damage to residential and commercial buildings
Damage to public buildings including schools and hospitals
Damage to recreation and cultural facilities
Dam walls
Hazard footprints, locations
Displaced people
Food supplies and food and merchandise supply chains
Alternative access points
Fences
Complications in damage and impact assessment often occur because:
Owners of properties are not present at the time of inspection
Professional advice may be needed and may not be readily available
Organisations and individuals have differing priorities and agendas which impacts on the
timeliness and relevance of the impact / damage assessment
Data on damage may not be complete due to inaccessibility
Insufficient resources available to analyse impact data and needs
Data reporting in a variety of incompatible formats
Noosa Local Disaster Recovery Subplan 2018 Page 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.