Many organisations involved in recovery may be contracting work or issuing tenders. Normal
tendering, awarding work and contracting processes should be followed. The Subgroup should
encourage all organisations to ensure they adopt sensible and accountable procedures for the
contracting of services.
The changing nature of recovery means that:
Staged reinstatement may be needed to deliver some quick but temporary outcomes that
address the immediate needs, with later work required to address longer-term needs
Plans may need to change to meet the changing needs
At all stages, time should be set aside to reflect on the decisions that have been made and
to make sure that they provide the best solutions – in some cases, rushed decisions are not
necessarily the best ones
Communication, both by listening and talking, is important with all stakeholders. This includes
the subgroup and local advisory groups
7.2.14 Other considerations for reconstruction
Make safe
It is important that safety and security is maintained throughout the recovery process. There is
a risk that people will not maintain normal safety measures and procedures in their haste to effect
repairs and restore some sense of normality to their lives e.g. ensuring that only appropriately
qualified people perform work. The term ‘make safe’ means many things and can include:
Classifying structural soundness
Establishing safe areas by removing hazards
Maintaining health, public health and safety standards
Managing ingress and egress routes
Receiving suitable sign-off
Requesting domestic and industrial consumers of water and electricity to shut off equipment
to preserve limited supply
The Subgroup should plan for and implement programs that promote and enhance safety in
building and construction. Agencies such as the Building Services Authority and trade unions
can assist in these matters.
Clean up
A significant volume of damaged material must be removed prior to the construction of new
facilities. In many cases this operation must be performed to restore amenity to the community.
Clean up operations include:
Removal of debris and other matter – green waste, building waste
Removal of rotting food from shelves and refrigerators in commercial establishments and
houses, both attended and unattended
Removal and disposal of hazardous substances e.g. asbestos containing material, dust from
fluorescent tubes
Removal of enviro-hazards e.g. oil or chemical spills, copper and arsenic, treated timber,
lead, silt, flood debris which may become a future fire risk
Disposal of carcasses from pets or agricultural animals. This may require special disposal
and environment health officers should be consulted for appropriate areas and requirements
Processing waste – grinding, compacting, recycling
Disposal of medical waste, including pharmaceutical waste. This may require special
supervision and disposal at secure sites. Consult with environmental health officers.
Managing and removing debris that presents a safety hazard to the community and may
require special steps to remove e.g. glass in school playgrounds
Noosa Local Disaster Recovery Subplan 2018 Page 54
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.