Local Government Area Sunshine Coast Council
Vegetation loss and damaged throughout the
protected area network (including significant hollow
bearing trees)
Significant riverbank/ creek bank erosion issues and
assoc riparian vegetation loss
Damage to protected area infrastructure – e.g.
signage/ trails/ fire tracks
Seagrass decline
Sewer network failure and associated contamination
issues (e.g. reduction of DO levels)
General debris and aquatic weed movement through
waterways
Increased acid sulphate leachate movement from
development sites
Exotic fish movement through waterways (e.g. Ewen
Maddock Dam)
Public health/ hygiene issues associated with wide
spread event factors such as power loss e.g. food/
water contamination
Able to provide specific examples of each of the listed
items above if needed.
In some cases, ecological survey techniques need to be employed to assess specific concerns
or to gain a broad audit of natural environmental impacts and likely consequences of the disaster.
A rapid response research capacity following a large-scale natural disturbance assists in
understanding the ecosystems’ dynamics and long-term consequences of natural disasters.
7.4.3 Interaction with the other functions of recovery
Often there is a high level of activity post-disaster to restore infrastructure services and ‘normal’
environmental considerations may be bypassed e.g. seeking vegetation clearance approvals.
Although quick action is essential, good environmental practices, if built into the process
beforehand, can still be applied. The LRG should consider any competing outcomes between
the environmental recovery effort and that of the other functions of recovery.
Noosa will seek a balanced approach to environmental recovery and abide by the objectives and
principles of the National Strategy for Ecologically Sustainable Development (1992)
7.4.4 Using an environmental risk management approach
Given the complexity of the natural environment it is likely that there will be significant uncertainty
in managing environmental recovery. Decisions will often involve lengthy time spans and
assumptions about projected impacts and may involve significant uncertainty. Using a risk
management approach may help determine the environmental risks and how best to treat them.
Such an approach provides a structure, systematic approach to decision making:
Establish the context for recovery of the environment
Identify environmental risks
Analyse environmental risks
Evaluate environmental risks
Treat environmental risks
Monitor and review
Communicate and consult
Below is a table that gives examples of options or strategies for treating risk in the natural
environment:
Noosa Local Disaster Recovery Subplan 2018 Page 72