NOT GOVERNMENT POLICY
2 Implementation progress
2.1 Progress against targets
This section summarises the progress achieved under the Strategy as of the end of Financial Year (FY) 2016 when
compared to targets. Progress towards a specific 2024 target is considered to be 'on track' if the progress as at
FY2016 equals or exceeds the corresponding 2016 target calculated in Table 1.
Figure 1 and Figure 2 demonstrate the changes in waste generation rate, landfilled waste tonnages, and recycling
rates against the interim targets, between FY2013 (baseline year) and FY2016 inclusive. Based on the analysis,
the following 2024 targets are considered to be on track to be achieved:
Municipal solid waste (MSW) recycling rate for regional centres (Figure 2)
Commercial and Industrial (C&I) waste recycling rate (Figure 2).
The 2024 targets for the other quantitative indicators are not on track to be achieved. In the case of the state-wide
MSW recycling rate, there was no improvement compared to the FY2013 baseline. In the case of waste
generation, landfilled waste, and the recycling rates for metropolitan areas and C&D waste, the performance in
FY2016 has worsened compared to the FY2013 baseline.
Figure 1: Progress in waste generation (left) and landfilled waste (right) (lower values are better)
Figure 2: Progress in recycling rates between FY2013 and FY2016 (higher values are better)
4
28 |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.