Original source · versioned page text
2018-06-27 SM - Attachment 1 to Item 2 - Directions Paper Transforming Queensland's Recycling & Waste Industry
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
The way forward
A waste disposal levy will come into effect
in the first quarter of 2019
Significant preparatory work is required to implement the new levy. The
legislative and regulatory framework, including a detailed levy model, needs
to be drafted, consulted on with stakeholders and progressed through the
required approval processes.
Additionally, landfill infrastructure, such as weighbridges and security fencing,
needs to be made ‘levy-ready’. Industry and government information technology
systems need to be redeveloped and made able to ‘interface’ with each other so
waste can be measured and the levy owed to be calculated. Staff training and
broader awareness and education needs to be developed and delivered.
Stakeholders will be consulted throughout this process.
8|
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.