Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

000A88A4.125.tif · 132003.221037

From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.

From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.

of 1

Text shows just the words. Original shows the document exactly as it was published.

« Cardna
MBK

 

6.0 WATER SUPPLY

The remote location of the proposed Neosa North Shore Eco-Tourism Portal required the
development of an innovative water supply system that would service the expected population
and wouid fulfil the environmental goals of the proposed Noosa North Shore Eco-Tourism
Portal. .

lt is proposed to service the Noosa North Shore Eco-Tourism Portal via the design of an
innovative water suppiy system that will combine the two available water sources as follows.

e Water supply through collection of rainwater.
e Construction and installation of a bore to extract groundwater.

To minimise the impact on the existing artesian bore and therefore the dependency on
groundwater extraction, it is intended that the majority of water supply demand wili be obtained
through the collection and storage of rainwater in a system of rainwater tanks.

The final layout and composition of the Noosa North Shore Eco-Tourism Portal will be
determined at Development Permit stage. The following assessment is based on the layout
option presented in the illustrative plans included in the Noosa North Shore Eco-Tourism Portal
Development Code.

The estimated equivalent tenements (ET) of the proposed Noosa North Shore Eco-Tourism
Portal was calculated using Noosa Council's accepted conversion factors. Table 6.1 provides an
indication of the expected ETs.

Table 6.1 Noosa North Shore Eco-Tourism Portal - Equivalent Tenement

Eco-Cabin 90 0.5 ET/Cabin 45
Lod: 80 rooms 0.33 ET/room

Café 430 4 ET/500m2 4
interpretive 140 sqm 4 ET/500m2 4
Centre

Total 73.4

 

The following water design parameters have been used in the calculation of the expected water
supply requirements for the proposed development.

Average Day consumption — 1000 L/ET/day.
Maximum Day to Average Day (AD) Ratio is 1.9.
Maximum Hour to Max Day (MD) Ratio is 2.
Maximum Hour to Average Day (MH) Ratio is 3.8.

PON>

Table 6.2 contains the estimated demands of the proposed development.

—s - wpe

Table 6.2 Noosa North Shore Eco-Tourism Portal - Water Demand Rates

Eco-Cabin 90 off
Lodge 80 rooms

Caié 130 sqm

Interpretive 140 sam
Centre
Total

 

 

PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Porta! September 2003
LA?296-03\ReportiFINAL REPORT - 18Sept03.doc Commercial in Confidence Page i7

Used in these records

About this file

File size
76 KB (small file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

000A88A4.125.tif · 76 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.