Council archive · source document
000A88A4.125.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
« Cardna MBK 6.0 WATER SUPPLY The remote location of the proposed Neosa North Shore Eco-Tourism Portal required the development of an innovative water supply system that would service the expected population and wouid fulfil the environmental goals of the proposed Noosa North Shore Eco-Tourism Portal. . lt is proposed to service the Noosa North Shore Eco-Tourism Portal via the design of an innovative water suppiy system that will combine the two available water sources as follows. e Water supply through collection of rainwater. e Construction and installation of a bore to extract groundwater. To minimise the impact on the existing artesian bore and therefore the dependency on groundwater extraction, it is intended that the majority of water supply demand wili be obtained through the collection and storage of rainwater in a system of rainwater tanks. The final layout and composition of the Noosa North Shore Eco-Tourism Portal will be determined at Development Permit stage. The following assessment is based on the layout option presented in the illustrative plans included in the Noosa North Shore Eco-Tourism Portal Development Code. The estimated equivalent tenements (ET) of the proposed Noosa North Shore Eco-Tourism Portal was calculated using Noosa Council's accepted conversion factors. Table 6.1 provides an indication of the expected ETs. Table 6.1 Noosa North Shore Eco-Tourism Portal - Equivalent Tenement Eco-Cabin 90 0.5 ET/Cabin 45 Lod: 80 rooms 0.33 ET/room Café 430 4 ET/500m2 4 interpretive 140 sqm 4 ET/500m2 4 Centre Total 73.4 The following water design parameters have been used in the calculation of the expected water supply requirements for the proposed development. Average Day consumption — 1000 L/ET/day. Maximum Day to Average Day (AD) Ratio is 1.9. Maximum Hour to Max Day (MD) Ratio is 2. Maximum Hour to Average Day (MH) Ratio is 3.8. PON> Table 6.2 contains the estimated demands of the proposed development. —s - wpe Table 6.2 Noosa North Shore Eco-Tourism Portal - Water Demand Rates Eco-Cabin 90 off Lodge 80 rooms Caié 130 sqm Interpretive 140 sam Centre Total PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Porta! September 2003 LA?296-03\ReportiFINAL REPORT - 18Sept03.doc Commercial in Confidence Page i7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.125.tifRelated documentApplication case desk ↗
About this file
- File size
- 76 KB (small file)
- File type
- TIF
No other editions are linked here.