Delegated Report - Code - Planning OPW25 0154 · OPW25/0154

of 10

Text shows just the words. Original shows the document exactly as it was published.

                           531-001-100       A      Site Layout     Plan   Prepared    by   Bax 10/06/2025
                                                    Engineering
                                                    Annotated by Council

                           531-001-200       A      Earthworks Layout Plan Prepared by Bax 10/06/2025
                                                    Engineering
                                                    Annotated by Council

                           531-001-201       A      Earthworks Sections Prepared by Bax 10/06/2025
                                                    Engineering

                           531-001-202       A      Retaining Wall Details Prepared by Bax 10/06/2025
                                                    Engineering

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 08/10/2027 unless an application to extend the currency period is
                      approved by Council.
                      Site Specific Conditions
                      Landslide Hazard
               3.     All works must be carried out in accordance with a site-specific Geotechnical Report
                      prepared by a suitably qualified person*. The site-specific Geotechnical Report must
                      demonstrate a low or very low risk of global slope instability.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               4.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               5.     Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               6.     The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               7.     All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               8.     All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines



                                                                                                     Page 5 of 10

Document Set ID: 24149815
Version: 4, Version Date: 08/10/2025

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW25 0154.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.