Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix E - Noosa Plan 2020 Assessment

of 219
Performance Outcomes              Acceptable Outcomes                 Response

PO2                               AO2                                 Complies
All lots have sufficient area     The minimum area above              The proposed development
that is above the DFE flood       flood level (flood free area) for   meets the minimum design
level or where modelling is       each lot, is in accordance with     levels specified in Table
not available, the highest        Table 8.2.6.5.                      8.2.6.5.
recorded flood level, to safely
and adequately
accommodate the intended
use.
PO3                               AO3                                 Complies
For reconfiguring a lot or        Development areas are not           The development does not
operational works,                filled to reduce flood risk.        result in areas being filled.
development is undertaken in
a manner that ensures:
  a) natural hydrological
     systems are protected
     from erosion, scour or
     flood damage on the
     premises or other
     premises;
  b) natural landforms and
     drainage lines are
     maintained to protect
     the hydraulic
     performance of
     waterways and flood
     plain; and
  c) development integrates
     with the natural
     landform rather than
     modifying the landform
     to suit the development
     as far as practicable.
PO4                               AO4.1                               Complies
For reconfiguring a lot,          Development provides an             The development provides an
development does not              effective evacuation route that     effective evacuation route
compromise the safety of          remains passable, with              through the front entrance
people resulting from the         sufficient flood warning time,      onto Hilton Terrace that will
flood risk associated with        to enable people to                 remain passable, with
events exceeding the DFE.         progressively evacuate to           sufficient flood warning time,
                                  safe areas above the PMF in         to enable people to
                                  the face of advancing flood or      progressively evacuate to
                                  waters for events that exceed       safe areas above the PMF.
                                  the DFE.




                                                                                                      52

Log in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.