Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
Earthworks
PO10 AO10 . Complies
Excavation and filling for Filling, other than The development will ensure
operational works only occur accessways: any filling does not extend
where they:
more than the equivalent of 3
a) does not extend more metres around the main
a) result in the protection, than the equivalent of 3 building and will be less than
rehabilitation and repair metres around the 500m2.
of ecologically main building,
The filling will not impact on the
important areas, measured from the
local drainage of adjoining
watercourses, drainage outer walls of the
properties.
lines and wetlands; building;
b) do not adversely b) is limited to a maximum
impact on the overall of 500m2; and
hydrology, hydraulics
c) does not impact on the
and flood capacity of a
local drainage of
waterway;
adjoining properties.
c) do not directly,
indirectly or
cumulatively cause
adverse impacts
external to the site;
d) do not cause increased
flooding, which
adversely affects the
safety or use of any
land upstream or
downstream;
e) do not cause ponding
of water on the site or
nearby land;
f) do not result in a
reduction in flood
storage capacity;
g) do not adversely affect
the flow of water in any
overland flow path; and
h) do not adversely affect
the privacy or visual
amenity of surrounding
property.
Editor’s
Note— The Earthworks
Code sets out further
requirements for earthworks.
58
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.