Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
AO6.4 Complies
Landscape elements do not
shade solar collector devices The development will ensure
during the middle 6 hours of landscape elements do not
the day. shade solar collector devices
during the middle 6 hours of
the day.
Stormwater Drainage No acceptable outcome Complies
PO7 provided
Landscaping integrates The development provides
stormwater drainage and water generous landscaping and
sensitive urban design impervious areas which will
elements. operate as a stormwater
drainage mechanism.
Water sensitive design
elements have ensured that
roof run off and in events of
increased rain the
development has the ability to
control water flows.
Natural Drainage AO8.1 Complies
PO8 Landscaping works maintain
Landscaping maintains or and enhance natural drainage The development landscaping
enhances the quality of surface lines (including creeks, gullies, works will maintain natural
water and groundwater. waterways and wetlands) to drainage lines (including
convey stormwater creeks, gullies, waterways and
wetlands) to convey
stormwater.
AO8.2 Not Applicable
Riparian buffers are
maintained and rehabilitated. The development is not located
near a Riparian buffer.
AO8.3 Complies
Within paved or sealed
surfaces, tree grates provide Tree grates will be utilises
for water and natural air where possible for water and
movement however are not to natural air movement.
be used as drain.
Bank stability AO9 Complies
PO9 Structures and recreational
76
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.