Original source · versioned page text
Appendix E - Noosa Plan 2020 Assessment
Performance Outcome Acceptable Outcome Response
travelling and
parked vehicles;
ii. provide for the safe
passage of vehicles,
pedestrians,
cyclists, and
discharge of
stormwater run-off
from contributing
catchments and the
preservation of
allweather access;
c) kerb and channel—
i. controls vehicle
movement by
delineating the
carriageway for all
users;
ii. conveys road
pavement run-off to
stormwater
drainage in a
manner that allows
the road to be
trafficable in
1%AEP local rainfall
events; and
iii. verges and
footpaths provide—
iv. safe access for
pedestrians and
cyclists clear of
obstructions;
v. an access area for
vehicles onto
properties;
93
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.