Appendix E - Noosa Plan 2020 Assessment
Performance Outcome Acceptable Outcome Response
c) restricting access to lighting and access is restricted
the general public by by the general public.
making the area
clearly identifiable as
private space.
Editor’s note— The use of
landscaping, a change of paving
material or fencing are examples
of delineating a waste storage
area. The locking of the area is not
preferred and should be avoided.
Water management
PO6 AO6 PO6 Complies
Waste storage areas are The waste storage area is
The development includes
designed to contain and constructed of impermeable
waste storage areas that have
appropriately dispose of and durable surfaces and:
been designed to appropriately
leakage from bins and
a) is bunded and graded dispose of leakage from bins
wastewater from bin washing.
so that washwater and and wastewater from bin
bin leakage are washing through drainage
drained to the sewer or areas on the driveway and the
an on-site effluent generous supply of soft
disposal system via a landscaping surrounding the
gully within the storage townhouse entryways.
area;
b) has a bund wall with a
maximum height of
100 millimetres;
c) is serviced by a
conveniently located
hosecock and
backflow prevention
device, and connected
to a water supply; and
d) is roofed or otherwise
covered if the storage
area is—
i. more than 1m²; or
103
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.