Appendix E - Noosa Plan 2020 Assessment
Performance Outcome Acceptable Outcome Response
including kerb and channel if
required.
AO7.4 Complies
Any damage to footpaths,
The development will repaired
street plantings, natural
or reinstated to at least pre-
vegetation, kerb and channel,
existing conditions caused by
bridges or roadways at the
damage to street plantings,
removal site, the new site or
natural vegetation, kerb and
between the sites is repaired or
channel, or roadways at the
reinstated to at least
removal site, the new site or
pre-existing conditions.
between the sites.
PO8 AO8.1 PO8 Complies
Waste materials are removed Waste materials are removed
The development will remove
from the site to avoid causing from the site.
waste materials from the site to
unhealthy conditions including:
AO8.2 avoid causing unhealthy
a) potential fire hazard; If a development permit has conditions.
not been issued for the future
b) ponding of water; and
use of the site:
c) breeding of vermin.
a) hard surfaced areas
including concrete
slabs are removed or
covered with a
minimum of 300
millimetres of soil; and
b) disturbed areas are
revegetated.
PO9 No acceptable outcome PO9 Complies
The potential for movement provided
The development will ensure
from the site, of soils or similar
through safe construction
materials is minimised.
management that potential for
movement from the site, of
soils or similar materials is
minimised.
PO10 No acceptable outcome Not Applicable
Vacant sites do not have an provided
The development will not
adverse impact upon the
involve a vacant site.
105
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.