Performance Outcomes Acceptable Outcomes Response
the flooding and drainage drainage characteristics
characteristics off-site. off-site.
Geotechnical considerations AO3.1 Not Applicable
PO3 Filling works are undertaken in The proposed development
accordance with Council’s does not involve fill works as a
Earthworks do not result in
Planning Scheme Policy PSP6 part of this application.
geotechnical instability on-site
Engineering design standards -
or to nearby premises.
roads, drainage and
earthworks.
AO3.2 Not Applicable
Where the filling is for The proposed development
residential, commercial or does not involve fill works as a
industrial purposes the works part of this application.
comply with Australian
Standard - Guidelines for
earthworks on commercial &
residential development.
Local Amenity AO4.1 Complies
PO4 The following control measures The construction works
are implemented— associated with the
Undertaking earthworks does
development will follow
not adversely impact on the a) regular water spraying
standard control measures to
amenity of the local area by of exposed areas to
appropriately mitigate dust and
way of dust, noise or visual suppress dust;
manage disturbed areas
amenity.
b) provision of dust appropriately.
stabilised or sealed
internal roads;
c) protective covering of
exposed areas that are
left for more than 2
weeks; and
d) unless a development
permit provides
otherwise, disturbed
areas are revegetated
using species
identified in Council's
Planning Scheme
107
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.