Original source · versioned page text
Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
costs and the AO14.3
requirement for
specialised A detailed maintenance and
maintenance decommissioning costing is
equipment and prepared for the project life and
techniques; and financial assurances are
provided by the proponent
c) not be used as (through an established sinking
stormwater quality fund) to provide for
treatment devices; and maintenance for the project life
and, if required,
d) support landscape,
decommissioning.
passive recreation and
ecological values;
e) not pose a health or
safety risk to users and AO14.4
neighbours of the site; Stormwater discharges
and achieve the stormwater quality
f) not impact adversely design objectives specified in
on visual amenity or Planning Scheme Policy 6,
privacy of residents in prior to entering the
the surrounding area. constructed lake.
113
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.