Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix E - Noosa Plan 2020 Assessment

of 219
Performance Outcomes              Acceptable Outcomes                 Response

        costs and the             AO14.3
        requirement for
        specialised               A detailed maintenance and
        maintenance               decommissioning costing is
        equipment and             prepared for the project life and
        techniques; and           financial assurances are
                                  provided by the proponent
   c) not be used as              (through an established sinking
      stormwater quality          fund) to provide for
      treatment devices; and      maintenance for the project life
                                  and, if required,
   d) support landscape,
                                  decommissioning.
      passive recreation and
      ecological values;

   e) not pose a health or
      safety risk to users and    AO14.4
      neighbours of the site;     Stormwater discharges
      and                         achieve the stormwater quality
   f)   not impact adversely      design objectives specified in
        on visual amenity or      Planning Scheme Policy 6,
        privacy of residents in   prior to entering the
        the surrounding area.     constructed lake.




                                                                                 113

Log in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.