Appendix E - Noosa Plan 2020 Assessment

of 219
Performance Outcomes                 Acceptable Outcomes                 Response

       landscape rather than         On sloping sites, split level       The development is not located
       dominating it; and            buildings with small floorplates,   on a sloping site.
                                     that step down the slope are
  b) steps down slopes or uses
                                     used as an alternative to
     suspended floor
                                     standard single or double storey
     construction, minimising
                                     construction to minimise building
     cut or fill and avoiding
                                     bulk and benching of the sites.
     benching of the site.
                                     Editor's note- refer to Figure
                                     6.9.1A and Figure 6.9.1B

                                     AO23.3                              Complies

                                     The distance between the ground     The development has been
                                     level and the lowest part of the    designed to ensure that the
                                     floor of the building does not      distance between the ground
                                     exceed 3 metres.                    level and the lowest part of the
                                                                         floor of the building does not
                                                                         exceed 3 metres.

PO24                                 AO24                                Complies

Filling and excavation for           Filling and excavation for          The development involves minor
operational works do not directly,   operational works is designed       filling and excavation, that will be
indirectly or cumulatively cause     and constructed to ensure           designed and constructed to
adverse impacts external to the      overland flow and/or flooding is    ensure no adverse effect on
development site by:                 not worsened, impeded, or           other properties or downstream
                                     otherwise diverted to adversely     environments.
  a) causing ponding of water
                                     affect other properties or
     on the site or nearby land;
                                     downstream environments.
  b) increasing flooding, which
     adversely affects the
     safety or use of any land
     upstream or downstream;
     or

  c) adversely affecting the
     flow of water in any
     overland flow path.




                                                                                                            20

Log in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.