Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
landscape rather than On sloping sites, split level The development is not located
dominating it; and buildings with small floorplates, on a sloping site.
that step down the slope are
b) steps down slopes or uses
used as an alternative to
suspended floor
standard single or double storey
construction, minimising
construction to minimise building
cut or fill and avoiding
bulk and benching of the sites.
benching of the site.
Editor's note- refer to Figure
6.9.1A and Figure 6.9.1B
AO23.3 Complies
The distance between the ground The development has been
level and the lowest part of the designed to ensure that the
floor of the building does not distance between the ground
exceed 3 metres. level and the lowest part of the
floor of the building does not
exceed 3 metres.
PO24 AO24 Complies
Filling and excavation for Filling and excavation for The development involves minor
operational works do not directly, operational works is designed filling and excavation, that will be
indirectly or cumulatively cause and constructed to ensure designed and constructed to
adverse impacts external to the overland flow and/or flooding is ensure no adverse effect on
development site by: not worsened, impeded, or other properties or downstream
otherwise diverted to adversely environments.
a) causing ponding of water
affect other properties or
on the site or nearby land;
downstream environments.
b) increasing flooding, which
adversely affects the
safety or use of any land
upstream or downstream;
or
c) adversely affecting the
flow of water in any
overland flow path.
20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.