Appendix E - Noosa Plan 2020 Assessment
8.2.1 ACID SULFATE SOILS OVERLAY CODE
Updated 04 March 2021
Noosa Plan, Version 1
Table 8.2.1.3 – Criteria for assessable development
Performance Outcomes Acceptable Outcomes Response
Avoidance and management of ASS
PO1 AO1.1 PO1 Complies
Development: The disturbance of ASS is The development will ensure
avoided by: that excavation and
(a) does not disturb ASS; or construction minimises
(b) is managed to avoid or (a) undertaking disturbance to ASS and where
minimise the release of an ASS investigation and unavoidable will take
acid and metal soil analysis according to precautions to avoid or
contaminants, where the National Acid Sulfate minimise the release of acid
disturbance of ASS is Soils Guidance; and metal contaminants.
unavoidable. (b) not excavating or otherwise
removing soil or sediment
containing ASS;
(c) not permanently or
temporarily extracting
groundwater that results in
the aeration of previously
saturated ASS; and
(d) not undertaking filling on
land at or below 5 metres
AHD that results in:-
(i) actual ASS being
moved below the water
table; or
(ii) previously
saturated ASS being
aerated.
Editor's note—National Sampling and
Identification Methods Guidelines is a
reference to:
(a) National Acid Sulfate
Soils Guidance: National acid
sulfate soils sampling and
identification methods manual,
Department of Agriculture and
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.