Appendix E - Noosa Plan 2020 Assessment

of 219
    Performance Outcomes              Acceptable Outcomes               Response

    PO5                               AO5                               Complies
    For reconfiguring a lot or        In the Flood Hazard Overlay,
                                                                        The development ensures:
    operational works,                or in areas otherwise
    development does not              determined to be subject to       a) there is no loss of on-site
    directly, indirectly or           the DFE or DSTE,                     flood storage. There is
    cumulatively alter the flood      development ensures:                 an increase in the
    characteristics external to the                                        amount of permeable
    development site for all                                               surfaces in the proposed
                                        a) there is no loss of on-
    flooding and inundation                                                development compared
                                           site flood storage
    events up to and including the                                         to the existing short term
                                           capacity;                       accommodation built
    DFE or DSTE based on:
                                        b) all changes to level,           form.
                                           depth, duration and
      a) current climate                                                b) the side boundary fences
                                           velocity of floodwaters
         conditions; and                                                   between townhouse
                                           are contained within            backyards will be
      b) incorporating an                  the site for all flood          constructed to ensure
         appropriate allowance             events up to and
                                                                           that floodwaters can
         for the predicted                 including the DFE
                                                                           drain efficiently through
         impacts of climate                based on current
                                                                           the site;
         change.                           climate and predicted
                                           impacts of climate           c) no acceleration or
                                           change at 2100;                 retardation of flows, or
                                                                           any retardation in flood
                                        c) there is no acceleration
                                                                           warning times will occur;
                                           or retardation of flows,
                                                                           and
                                           or any retardation in
                                           flood warning times,         d) there is no increase in
                                           elsewhere on the                stormwater ponding that
                                           floodplain and to any           will result from this
                                           overland flow paths;            development as there is
                                           and                             an increase in permeable
                                                                           surfaces.
                                        d) there is no increased
                                           stormwater ponding on
                                           sites upstream,
                                           downstream or in the
                                           general vicinity of the
                                           site.


     Resilient building design and form

    PO6                               AO6.1                             Complies
    Development ensures that          Buildings are designed to         The development is designed
    building design and building      integrate well with the street    to integrate well with the street
    form:                             level and the levels of
                                                                        level and the levels of adjoining
                                      adjoining properties to
a) accounts for potential flood                                         properties by providing clearly
                                      facilitate pedestrian flows and
   risk;                                                                delineated pathways to the
                                      visual and physical               townhouses and architectural
b) is resilient to flood events;      connectivity between the          features that provide
   and                                footpath and ground floors.       wayfinding to the ground floor
                                                                        entry.


                                                                                                         3

Log in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.