Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
AO9.2 Not Applicable
Essential community
The development does not
infrastructure which is located
involve community
below the specified flood
infrastructure.
immunity requirements:
a) is designed and
constructed to function
effectively during and
immediately after the
recommended flood
level event; and has
direct access to low
hazard evacuation
routes or an
emergency rescue
area above the PMF, if
it is for emergency
services (including
emergency shelters,
police facilities,
hospitals and
associated facilities).
Earthworks
PO10 AO10 Complies
Excavation and filling for Filling, other than The development will ensure
operational works only occur accessways: any filling does not extend
where they:
more than the equivalent of 3
a) does not extend more metres around the main
a) result in the protection, than the equivalent of 3 building and will be less than
rehabilitation and repair metres around the 500m2.
of ecologically main building,
The filling will not impact on the
important areas, measured from the
local drainage of adjoining
watercourses, drainage outer walls of the
properties.
lines and wetlands; building;
b) do not adversely b) is limited to a maximum
impact on the overall of 500m2; and
hydrology, hydraulics
c) does not impact on the
and flood capacity of a
local drainage of
waterway;
adjoining properties.
c) do not directly,
indirectly or
cumulatively cause
adverse impacts
external to the site;
d) do not cause increased
flooding, which
adversely affects the
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.