Original source · versioned page text
Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
b) provided beyond the c) forming and grading to
site’s frontage if required. footpaths;
d) vehicular kerb and
footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed
carriageway;
h) required alterations to
public utility mains,
services or installations;
i) construction of any
required alterations to
public utility mains,
services or installations;
j) stormwater drainage
works; and
k) installation of electrical
conduits.
PO15 No acceptable outcome provided PO15 Complies
Any alterations or repairs to The development will be
infrastructure as a result of the responsible for any alterations or
development are made at no cost repairs to infrastructure as a
to Council. result of the development are
made at no cost to Council.
PO16 No acceptable outcome provided PO16 Complies
Road infrastructure is proven to The site is accessed by Hilton
be suitable for its use prior to Terrace which is a part of the
Council accepting the dedicated exiting road infrastructure and is
asset. suitable for residential
development.
Signed Development
PO17 No acceptable outcome provided Not Applicable
Staged development is planned, The development does not
designed and constructed to involve stages.
ensure that—
a) each stage of the
development can be
12
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.