Development Application part 2 of 2 plans - MCU13/0080

of 68

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (51.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                              ~
3:May2013
18Sunseek!r C{ose
                                                                              the certifier
Division 15   -
                  Erosion & Sediment Control




Specific Outcomes               Probable Solutions                   Compliance
14.125 Effects of Work
Erosion and sediment control    51.1 Site disturbance is limited     Minimal earthworks are
01 Development minimises        to building areas, their
                                                                     proposed.
erosion and transport           surrounds and other use areas;
of sediments off-site.          AND
                                                                     Relevant conditions related to
                                51.2 Sediment barriers are
                                                                     erosion and sediment control
                                provided throughout and
                                downslope of disturbed               can be included in the

                                areas to prevent sediment            development permit.
                                washing into gutters, drains and
                                watercourses either on
                                                                     The proposal will comply
                                or off the site; AND

                                51.3 All stockpiles including
                                sand, soil or building materials
                                are within the   premises and
                                contained within individual
                                sediment barriers;
                                AND
                                51.4 Sediment basins are
                                provided where the site
                                contains fine or dispersive soils;
                                OR
                                51.5 A stormwater catchpit
                                incorporating a stormwater
                                catch pit protection device is
                                installed so that all runoff from
                                disturbed areas flows to the
                                catch pit;
                                AND
                                51.6 For buildings,
                                a) temporary or permanent
                                down pipes are connected to the
                                stormwater system before
                                laying the roof; or
                                b) localised erosion is avoided
                                by directing flow from
                                downpipes over non-erosive
                                areas.



5tormwater runoff               52.1 Diversion drains or bunds       Minimal earthworks are
02Stormwater is diverted        are designed and constructed to      proposed.
around disturbed areas.         drain upstream run-off around
                                the disturbed site;
                                                                     Relevant conditions related to
                                AND
                                52.2 Discharge from the              erosion and sediment control

                                diversion drains do not cause        can be included in the

                                run-off impacts to other             development permit.
                                properties;
                                OR
                                                                     The proposal will comply
                                52.3 Alternative methods, as
                                described in the Institution of


                                                   40

Used in these records

About this file

File size
51.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 of 2 plans - MCU13_0080.pdf · 51.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.