Original source · versioned page text
Appendix I - Local Planning response
Column 1 Column 2 Response
Specific outcomes Acceptable solutions (if accepted development )
Probable solutions (if code assessment)
d) Service and utility uses, including electricity conditions;
substations, major electrical depots and water OR
treatment plants.
S3.3 The development includes measures that
ensure—
a) the long term stability of the site;
b) access to the site will not be impeded by a
landslide event; and
c) the community infrastructure will not be
adversely affected by landslides originating on
sloping land above the site2.
2
PSP1 details information Council may request including the preparation of a site specific geotechnical analysis prepared by a registered professional to demonstrate the achievement of the solution to the satisfaction of the Council.
P a g e |2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original