Appendix I - Local Planning response
Acid sulfate soil areas
Column 1 Column 2 Assessment
Specific Outcomes Probable solutions
Effects of works
General Partial solution Complies
O25 Works do not disturb acid sulfate soils or are S25.1 The disturbance of acid sulfate soils is avoided by— Additional works to complete the project involve minor
managed to avoid the release of acid or associated a) not excavating or otherwise removing soil or sediment earthworks for instance to establish site landscaping
metal contaminants.13 identified as containing acid sulfate soils; and replace the existing driveway (like for like). The
b) not permanently or temporarily extracting works will not disturb acid sulfate soils.
groundwater that results in the aeration of previously
saturated acid sulfate soils; and
c) not undertaking filling that results in actual acid sulfate
soils being moved below the watertable or previously
saturated acid sulfate soils being aerated;
OR
S25.2 The disturbance of acid sulfate soils avoids the
release of acid or associated metal contaminants by—
a) neutralising existing acidity and preventing the
generation of acid and associated metal contaminants;
and
b) preventing the release of surface or groundwater
flows containing acid or associated metal
contaminants into the environment.
13
PSP1 Details information Council may request to assist in the assessment of whether or not the application achieves the relevant specific outcomes.