Council archive · source document
Minor Change Existing Approval 132001.210037.3
Officer: Tara Norley Direct Telephone: 07 53296486 Our Reference: 132001.210037.3 Your Reference: 20200228 2 October 2020 Mr NL Finlayson C/- Pacific BCQ PO Box 1901 NOOSAVILLE BC QLD 4566 [email protected] Dear Sir Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 1 September 2020, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: 132001.210037.3 Street address: Verano Noosaville 8/283-285 Weyba Rd Noosaville Qld 4566 Real property description: Lot 8 SP 141358 Planning Scheme: Noosa Plan 2020 (31 July 2020) Decision details The following type of approval was issued on 5 July 2001 Development Permit for Material Change of Use of Premises – Multiple Dwelling (28 Units) & Restaurant In relation to the request to make a minor change to the existing approval, Council on 30 September 2020, decided to approve the requested changes. The changes are detailed below. Approve the change Include additional condition currency period of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Environmental Health An annual licence and registration of the premises is required under the Food Hygiene Regulations of 1989 from Council’s Environmental Health Section where unpackaged food is sold, prepared, packed, stored, handled, served or supplied for sale. The developer must provide a suitably screened imperviously paved area large enough for all refuse and recycling containers. A wash down area is required with a cold-water tap, hose and drain outlet connected to sewer. The drain outlet is to be designed to prevent stormwater entry to the sewerage system. The bin storage area for the restaurant is also to be connected to sewer and to be provided with a cold water tap and bin wash facility. The bin storage area is required to be of sufficient size to accommodate general refuse, recycling bins, cardboard recycling bag and drums of cooking oil for recycling. Refuse containers must be provided in accordance with the requirements of the Environmental Protection (Interim Waste) Regulations 1996 and (Waste Management) Regulation 2000, for the storage and collection of refuse. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, dust or odour nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or located in a manner which prevents a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. All refrigeration plant including motors, shall be situated within the building or suitable provided with noise reduction measures and located as to prevent a noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences. Air conditioning units shall be located in a manner which prevents noise nuisance beyond the subject land in accordance with the nuisance provisions of the Environmental protection Regulation 1998. On the spot fines apply for such offences. A Trade Waste Permit is required to discharge each type of Trade Waste. The hydraulic drawings are to show all the Trade Waster requirements in accordance with the Noosa Trade Waste Policy. A place of food preparation and/or cooking is to have the liquid waste connected to a Trade Waste line and to an approved grease arrestor of a size determined by Council’s Trade Waste Policy. Trade Waste requirements are required to be in place, inspected and approved prior to the commencement to trading or operation. The approprate Trade Waste Permits will be issued following approval at final inspection. Full truck access is to be provided to each grease arrestor and/or pre-treatment device for cleaning and servicing. Where access is restricted, a pump out line is required. Building An identification survey of the subject site is to be carried out by a Licensed Surveyor and is to be submitted to Council at the time of foundation inspection or immediately thereafter. Such survey shall set out the boundaries of the site and the position of the buildings on the site. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the minimum required floor level and the maximum building height above natural surface, required by the provisions of the Planning Scheme. Land Development Lot Amalgamation All separate, adjoining lots that form part of this application shall be amalgamated into one undivided lot in accordance with Section 3.7.3 of the Integrated Planning Act and the Plan of Survey submitted for registration at the Land Titles Office. River Flooding All buildings proposed on site shall be constructed to comply with Council’s Minimum Floor Height requirements as defined in Council’s Planning Scheme and on Council’s Scheme Maps at the time of issue of the Building Permit. In this regard and as an indication only :- The minimum floor level for any habitable room constructed on existing Lot 17 on RP 36728 should be RL 2.5 (AHD). The minimum floor level for any habitable room constructed on existing Lot 1 on RP 41301 and existing Lot 1 on RP 52567, should be RL 2.8 (AHD). Storage Areas 1-16 should be constructed to a minimum floor level of RL 2.5 (AHD). Carpark spaces R1-R13 should be constructed to a minimum floor level of RL 2.2 (AHD). Units 11C & 12D should be constructed to a minimum floor level of RL 2.8 (AHD). Storage Areas 17-29 should be constructed to a minimum floor level of RL 2.8 (AHD). Carpark spaces R14-R28 should be constructed to a minimum floor level of RL 2.5 (AHD). The Restaurant and the Managers Office should be constructed to a minimum floor level of RL 2.8 (AHD). These levels however are subject to change, and verification shall be made to Council’s Land Development Section prior to obtaining a Development Permit for Building Works. Vehicle Access A vehicular access driveway to serve Buildings 1-3 and Buildings 4-6 shall be constructed from both the James Street and Weyba Road frontages of the site respectively. The driveways shall have a minimum width of 5.5 metres and be constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming. All vehicles shall enter and leave the site in a forward direction. Loading Areas On-Street Loading Zone No parking will be permitted in either James Street or Weyba Road for the purposes of making deliveries to the site. Off-Street Loading Zone Combined service bay / carpark space - V23 (adjacent to the Weyba Street frontage and located close to the proposed restaurant) as shown on revised site plan SD 2013J, shall operate as a Service Bay between the hours of 8:00 am to 4:00 pm weekdays and shall be sign posted to indicate this. Proposed service bay V23 shall be increased in width to at least 3.2 metres to allow sufficient room at the sides of delivery vans. Proposed service bay V23 shall have a minimum 2 metre landscaped setback to the road frontage in accordance with Council’s Planning Scheme. Proposed service bay V23 shall be separated from the adjoining space to the west (V22) by providing a minimum 0.6 metre wide landscaped strip between the two spaces. Carparking Carparking shall be provided within the site as shown on revised site plan SD 2013J, except as modified herein. A minimum of 28 covered carpark spaces and 23 uncovered carpark spaces shall be provided on site, including 1 clearly defined disable carpark space and 1 clearly defined Service Bay. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for user class 3 (user class 4 for disabled carpark space) and the minimum head clearance (headroom) at any point shall be 2.3m. The proposed sliding security gate between carpark space V3 and V4 shall be relocated so that it is located between carpark space V6 and R1 to allow visitors to easily access spaces V4-V6. The proposed turning area located between spaces V7 and V8 (near the end of the aisle that serves proposed carpark spaces R14 to R28 / V7 to V17) shall be line-marked with chevrons and have the words “No Parking” painted on the pavement. The proposed turning area shall also be sign posted as a “Turning Area Only” and that “No Parking is Permitted”. All staff carpark spaces shall be clearly defined by line marking each space with the words “Staff Parking Only” and by sign posting each space with a similar wording. In this regard spaces V15 to V17 shall be defined as “Staff Parking Only”. Vehicles associated with the uses permitted by this permit shall park on site and not in James Street or Weyba Road. Roadworks Contributions A roadworks contribution of $4,070 towards the upgrading of James Street shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2001 until the date of payment. The money will be used to assist Council with the cost of intersection improvements at James / Elizabeth Street and pavement improvements. A roadworks contribution of $1,790 towards the upgrading of Weyba Road shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from March 2001 until the date of payment. The money will be used to assist Council with the cost of pavement improvements in Weyba Road. Frontage Works Footpath improvements such as topsoiling, grassing, and tree planting are required to both the James Street and Weyba Road frontages of the site in accordance with Planning Scheme policy PSP1 Landscaping Guidelines. Grass shall be couch, free of weeds. A new 1.2 metre wide concrete path shall be constructed across both the James Street and Weyba Road frontages of the site in accordance with Council’s design standards. Care shall be taken to protect any significant vegetation or any underground services. The paths shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel and footpath paving in accordance with Council’s Standard specifications prior to commencement of the use permitted by this permit. Stormwater Drainage All stormwater drainage shall be collected on site and discharged to Council’s existing kerb & channel drainage system in James Street and Council’s existing drainage structures in Weyba Road. In this regard, plans shall be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works. Overland flow drains parallel to the site boundaries - as proposed on revised site plan SD 2013J - will be subject to Operational Works approval and shall not contain gravel or mulch. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into Council’s drainage system. All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. All site stormwater drainage shall be by means of a gravity systems. A contribution of $4,194.05 shall be paid to Council towards the cost of the Noosaville Master Drainage Plan prior to obtaining a Development Permit for Operational Works. The amount of the contribution shall be adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from March 2001 until the date of payment. Sewer Mains The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council. The sewer main to the east of existing Lot 17 on RP 36728 and to the west of existing Lot 1 on RP 41301 shall be relocated so there is no conflict with the proposed location of any buildings. In this regard the sewer line may be relocated generally in accordance with Plan A and Long section B dated 22 August 2001, subject to full engineering drawings submitted for operational works approval. Consent is also to be obtained to enter adjacent property to construct new manhole and reconnect existing internal sewer drains at ‘A’ as shown on Plan A. Town Water Supply The site shall be connected to Council's existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council. Each water connection to the water reticulation system shall extend to the property boundary and be metered. Where multiple units including leased buildings are served by a single service, multiple water meters to each individual unit or leased building shall be installed. All fees for the supply of water meters shall be paid to the Council. Easements Easements will be required to be created over any stormwater drainage system within the development site if it collects stormwater from any of the adjoining properties. The easement(s) shall be dedicated to Council at no cost and be sufficient in width to provide a minimum of 1.5 metres either side of the designed drainage structure with a minimum width of 4.0 metres. A registered easement shall be created over any new sewer mains within the development site. The easement shall be provided parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment and be no less than 3.0 metres wide. A registered easement shall be created over the existing sewer main to the east of existing Lot 1 on RP 41301 and to both the east and south of existing Lot 1 on RP 52567. The easement shall be provided parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment and be no less than 3.0 metres wide. No building or other structure shall be constructed or encroach over an easement. Any building or structure within proximity of an easement or any other public utility’s underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure. Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered practicing Geotechnical Engineer and submitted with any application for any Development Permit for Building Works. Earthworks Fill levels, in accordance with Council’s - Noosaville Master Drainage Plan - will be provided on application to Council’s Works Directorate. Any filling works required on site shall be carried out in accordance with Section 3.8 of Council's Engineering Design Standards Manual and so as not to cause the ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Headworks Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of March 2001 under the current policies is as follows: Water Supply $ 56,529 Sewerage $ 53,772 TOTAL $110,301 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. Erosion & Sediment Control Any person acting on this permit shall prevent erosion and sediment export from the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be necessary. A $10,000 site control bond is required to be lodged prior to the issue of a Development Permit for Operational Works to ensure compliance with this condition. It will be refunded following compliance with this condition and satisfactory completion of all works, less any costs incurred by Council in effecting compliance with the condition. General Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. Land Use Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered SD2013J and SD2014H dated Apr 2001, SD1101C, SD2015D, SD2016B, SD4501C, SD4502A, SD3101E, SD3102E, SD3104D, dated Feb 2001 prepared by Cottee Parker Architects, Verano Balcony Extensions – Elevations, Verano Balcony Extensions – Level One A, Verano Balcony Extensions – Level One (B) and Verano Balcony Extensions – Ground Floor, stamped and dated 19 October 2004 and as may be amended by these conditions. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The restaurant shall not operate outside the following hours:- 7am-10pm Sunday to Thursday; and 7am-12am Friday to Saturday. Noise emissions associated with the Restaurant use, shall be in accordance with AS 1055.1 shall not exceed 5dB(A) and 3dB(A) above background noise levels, between 7am - 10pm and 10pm - 7am respectively measured from the nearest residential structure. The open space and setback areas are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter, and is to include the following:- At minimum of 8 x 500 Litre plant species endemic to the immediate area of the site are to be planted about the development; The eucalypt towards the northern boundary of the site, adjacent Building 1 and Building 2 and the melaleuca located adjacent Building 3 and Building 4 are to be retained; All trees within the road reserve are to be retained except where required to be removed due to building operations; Any tree to be removed as a result of building operations within the road reserve is to be relocated to an alternate position within the road reserve at a location nominated by the Manager Land Use; Two additional 100 litre or 200 litre size street trees are to be planted within the Weyba Road road reserve at locations nominated by the Manager Land Use. Any fencing provided in conjunction with the development is to be setback an average of two (2) metres to any road frontage. Fencing to the adjoining property shall be a minimum of 1.8 metres in height, tapering to 1.2 metres within the boundary setback to the road reserve. Existing trees on the site are to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscape plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. Any advertising sign or device is to comply with the provisions of Council's policies on advertising. Security in the form of a cash bond or trading bank guarantee to the sum of $30 000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for operational works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. This Development Permit for a material change of use of premises lapses if:- the use or erection of a building or other structure associated with the use, has not been commenced by 24 August 2005, unless application is made and approved by Council for an extension; or the use of any premises pursuant to the Development Permit ceases. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works. Additional Conditions 19/10/04 All balustrade material is to be of a material and colour consistent with that of the existing balustrade, and are to be constructed from a transparent material in accordance with Section 5.4.1.8 (e) of the Schedule to the Planning Scheme. Any deck areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. Prior to the commencement of development, the following Development Permits must be obtained:- Additional conditions – 30 September 2020 Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date NL2020-D Sheet 2 of 3 NA Proposed floor, prepared by Mandy’s Design & Drafting 12 Aug 2020 NL2020-D Sheet 3 of 3 NA Proposed elevations, prepared by Mandy’s Design & Drafting 12 Aug 2020 referral agencies Not Applicable advisory notes Infrastructure Charges All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue. property notes Not Applicable variation approval details Not Applicable further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Building Works Private Building Certification submissions Not Applicable rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully Tara Norley Development Planner Enc: Appeal Rights Approved Plans/Documents DECISION NOTICE HISTORY Original Decision Notice -5 July 2001. Negotiated Decision Notice – 24 August 2001, with amendments to conditions 20, 24, 39, 44 & 58 Decision Notice - Minor 132001.210037.02 – 19 October 2004; amendment to condition 58 and inclusion of 3 additional conditions Minor Change – 132001.210037.03 – additional condition Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 10 of 10 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 10 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132001.210037.3Related documentApplication case desk ↗
About this file
- File size
- 352 KB (small file)
- File type
- DOCX
No other editions are linked here.