Council archive · source document
Approved Plans - EXE22-0013 · EXE22/0013
Plans and drawings: the text below has words only, no drawings.
Very large file (10.7 MB): may take a few minutes to open.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 SCOPE AND METHOD OF INVESTIGATIONS 2.1 Qualifications of Responsible Firm ................................................................................................. 3.0 PROPOSED DEVELOPMENT 4.0 OVERVIEW 4.1 Regional Setting and Site Description ............................................................................................. 4.2 Regional Geology ............................................................................................................................ 5.0 GEOTECHNICAL SITE INVESTIGATION 5.1 Fieldwork......................................................................................................................................... 5.2 Subsurface Conditions .................................................................................................................... 5.3 Groundwater ................................................................................................................................... 6.0 SLOPE STABILITY ASSESSMENT 6.1 Stability Assessment Findings ......................................................................................................... 6.2 Desktop Assessment Findings ......................................................................................................... 6.3 Hazard Identification ....................................................................................................................... 6.4 Qualitative Risk Assessment ........................................................................................................... 7.0 COMMENT & RECOMMENDATIONS 7.1 Development................................................................................................................................... 7.2 Development Constraints ............................................................................................................... 7.3 Earthworks ...................................................................................................................................... 7.4 Foundations .................................................................................................................................... 7.5 Drainage .......................................................................................................................................... 7.6 Erosion Control & Landscape .......................................................................................................... 8.0 COMPLIANCE CERTIFICATION 9.0 CONCLUSION APPENDICES Appendix A – Soil Profiles and Laboratory Results Appendix B – Landslide Frequency Analysis Appendix C – Site Photographs Appendix D – Site Maps Appendix E – Qualitative Terminology for use in assessing risk to property Appendix F – Stability of Retaining Structures Appendix G – Hillside Construction
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - EXE22-0013Related documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.