PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: — QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)
QUALITATIVE RISK ANALYSIS MATRIX — LEVEL OF RISK TO PROPERTY
LIKELIHOOD CONSEQ JENCES TO PROPERTY (With data Aunemaie tt of Menino
Indicative Value of 1: CATASTROPHIC
Approximate Annual 200% 5 INSIGNTFIC ‘ANT
OS%
UNLIKELY L L VL
- RARE L VL VL
F - BARELY CREDIBLE 10* L VL VL VL VL
Notes; (5) For Cell AS, may be subdivided such that a consequence of less than 0.1% is Low Risk
(6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
time
RISK LEVEL IMPLICATIONS
Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
options essential 10 reduce risk to Low, may be too expensive and not practical. Work likely to cost more than value of the
woperty
Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required t reduce
risk to Low. Work would cost a substantial sum in relation to the value of the property
May be tokrated in certain circumstances (subject to regulator’ s approval) but requires investigation, planning and
MODERATE RISK implementation of treatment options reduce the risk to Low. Treatment options reduce to Low risk should be
implemented as soon as practicable
Usually acceptable to regulators. Where treatment has been required reduce the risk to this level, ongoing maintenance is
required. |
‘Acceptable Manage by normal slope maintenance procedures |
LOW RISK
VERY LOW RISK
Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
given as a general guide.
92 Australian Geomechanics Vol 42 No 1 March 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans - EXE22-0013Related documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.