PCA Plans · OPW16/0021
Attached to the e-mail Change to Operational Works Application OPW16/002.01.
Plans and drawings: the text below has words only, no drawings.
GENERAL NOTES 1, THESE DRAWINGS ARE TO BE READ IN CONJUCTION WITH TOD CONSULTING ENGINEERS DRAWINGS. THESE DRAWINGS DOCUMENT AN ALTERNATE SOLUTION FOR THE RETENTION AND PILED FOUNDATION SYSTEMS. IF ANY DISCREPANCIES ARISE, CONTACT THIS OFFICE FOR CLARIFICATION. 2. ANY SPECIFIC NOTES TAKE PRECEDENCE OVER THESE GENERAL NOTES 2, UNO, ALL DIMENSIONS ARE IN MILLIMETRES WORK TO WRITTEN DIMENSION ONLY, DO NOT SCALE WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE RELEVANT AUSTRALIAN STANDARDS . WHERE PROPRIETARY PRODUCTS ARE SPECIFIED, THEY ARE TO BE USED AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS GUIDELINES AND SPECIFICATIONS. 7. WHERE PROPRIETARY PRODUCTS ARE SPECIFIED, ANY PROPOSED SUBSTITUTION MUST BE SUBMITTED TO PCA FOR APPROVAL. SAFE WORK PRACTICES 1, THE CLIENT IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVALS PRIOR TO COMMENCING CONSTRUCTION. 2. THE CLIENT IS RESPONSIBLE FOR LOCATING ALL BURIED SERVICES 3. WHERE APPLICABLE, ANY SUBCONTRACTOR TO PCA IS RESPONSIBLE FOR THE DESIGN, PROVISION AND CERTIFICATION OF ANY TEMPORARY WORKS REQUIRED. 4, ALLEXCAVATIONS SHALL BE PROTECTED AS APPROPRIATE 5. THE CLIENT IS RESPONSIBLE FOR ESTABLISHING AND MONITORING SURVEY POINTS ACROSS THE SITE AND ADJACENT PROPERTIES PRIOR TO AND DURING CONSTRUCTION. 6. SET OUT 1. PILE SET OUT IS BY OTHERS he 2. DIMENSIONS SHOWN ON PILE LAYOUTS ARE PLAN DIMENSIONS AND ANY LONGITUDINAL GRADE IS TO BE TAKEN INTO ACCOUNT IN THE SET OUT. REINFORCEMENT FOR CONCRETE WORKS 8. iL REINFORCING STEEL SHALL BE IN ACCORDANCE WITH AS/NZS 4671 N= GRADE DSOON DEFORMED BARS R= GRADE R2S50N ROUND PLAIN BARS Sl= GRADE DSO0L WLEDED MESH MINIMUM BENDS, DEVELOPMENT/ SPLICE LENGTHS, HOOKS AND COG DIMENSIONS TO AS3600-2009 DESIGN LIFE 1 THE STRUCTURE HAS BEEN DESIGNED FOR A 50 YEAR DESIGN LIFE DESIGN PARAMETERS- RETENTION 15 G THE FOLLOWING NOTES DOCUMENT THE DESIGN OF THE PERMANENT RETENTION SYSTEM THE SYSTEM CONSISTS OF 4 PRIMARY COMPONENTS:- 1 VERTICAL CIRCULAR HOLLOW SECTION (GRADE 350) WITH CENTRAL HOLLOWBAR MICROPILE 2 RAKED (30° OFF VERTICAL) HOLLOWBAR MICROPILE ANCHORS 3 REINFORCED CONCRETE CAPPING BEAM 4 _ INTERMEDIATE GROUT COLUMNS THE SYSTEM HAS BEEN MODELLED USING THE COMMERCIALLY AVAILABLE "WALLAP' SOFTWARE AS A PROPPED CANTILEVER, USING THE BURLAND POTTS METHOD AND ACTIVE SOIL PRESSURES. WITH RESPECT TO TOE EMBEDMENT, THE TARGET FACTOR OF SAFETY FOR OVERALL STABILITY, EQUALS 1.5, THE PILE TOE IS TYPICALLY SET AT THE UNDERSIDE OF THE CHS, DUE TO THE RELATIVE STIFFNESS OF THE CASING TO THE CENTRAL HOLLOWBAR. THE CENTRAL HOLLOWBAR IS FOUNDED AT DEPTH TO RESIST THE VERTICAL AXIAL LOADS. DESIGN SOIL PRESSURE COEFFICIENTS HAVE BEEN DETERMINED BY BACK CALCULATION OF Ko AND Ka VALUES PROVIDED IN MORRISONS GEOTECHNCAIL REPORT DATED 14/10/2014 SECTION 3.2. IN PARTICULAR, TO DETERMINE THE DESIGN INTERNAL FRICTION ANGLE () FOR THE LOOSE SANDS, REFERENCE IS MADE TO THE PUBLISHED VALUES OF Ko= 0.5 AND KA= 0.31 USING RANKINES THEORY OF EARTH PRESSURE:- Ko= (1-SIN $)= 0.5 WHEN $=30° AND Ka= (1-SIN 6) / (1+SIN $)=0.31 WHEN $=32°, HENCE DESIGN INTERNAL FRICTION ANGLE FOR LOOSE SAND $= 31° THE TYPICAL DESIGN SOIL PROFILE IS AS FOLLOWS:- DEPTH TYPE youd Ko 38/h Ka Kp 0-4.5m LOOSEDUNESAND 17 31 0,49 0.67 0.27 4.95 4.5-10m MEDIUM DENSE 19 33 0.46 0.67 0.25 5.66 10om+ DENSE SAND 19.5 38 0.38 0.67 0.20 8.2 A SURCHARGE LOAD OF 10kPa HAS BEEN APPLIED TO THE TOP (BOUNDARY) WALL, TO ACCOUNT FOR NEIGHBOURING STRUCTURES IN ACCORDANCE WITH SECTION 4.3 OF TOD CONSULTING ENGINEERS ‘STRUCTURAL DESIGN CONCEPT’ REPORT DATED 29/7/2014 AND SECTION 3.2 OF THE GEOTECHNICAL REPORT PREPARED BY MORRISON GEOTECHNIC DATED 14/10/2014. A SURCHARGE LOAD OF 20kPa HAS BEEN APPLIED TO THE REMAINING WALLS TO ACCOUNT FOR CONSTRUCTION TRAFFIC, EXCEPT FOR THE AREAS NOTED AS CRANE WORKING AREAS. N.B. MAXIMUM CRANE SIZES AND WORKING AREAS NOT TO EXCEED THE LIMITS AS NOTED ON DRAWING. (FINAL DESIGN OF RETAINING WALL IN THESE WORKING ZONES MICROPILE SPECIFICATION 1. MICROPILES ARE TO BE 40/20 HOLLOW BARS, 90 dia DRILL BITS, COUPLERS AND CENTRALISERS INSTALLED IN) ACCORDANCE WITH PCA-QF-059 MICROPILE INSTALLATION METHOD STATEMENT. FINAL FLUSH GROUT MIX TO BE 0.45W/C RATIO, WITH A:- MINIMUM COMPRESSIVE STRENGTH OF 32MPA AFTER 28 DAYS TARGET SPECIFIC GRAVITY OF 1.89 (+/-0.06) 3. MICROPILE INSTALLATION TOLERANCE:- NOMINALLY +/- 75MM PLAN AND +/- 1° FROM VERTICAL/ RAKE ANGLE. 4. BAROID MUD BALANCE TESTS WILL BE CARRIED OUT AT REGULAR (TWICE DAILY) INTERVALS, A MINIMUM OF 1% OF THE FOUNDATION MICROPILES ARE TO BE STATICALLY LOAD TESTED (TENSION) IN ACCORDANCE WITH AS2159-2009- UP TO THEIR SERVICEABILITY (Ps) LOAD AS NOTED ON THESE DRAWINGS. GROUT COLUMNS INITIAL SITE TESTING WILL BE CARRIED OUT PRIOR TO FINAL INSTALLATION TO OPTIMISE THE GROUT MIX/ INSTALLATION METHOD. 2. INITIAL TRIALS WILL ADOPT A 1:1 WATER/ CEMENT RATIO GROUT MIX, HOWEVER THE FINAL MIX DESIGN AND INSTALLATION METHOD IS TO BE DETERMINED FROM PRE- PRODUCTION TRIALS SHOTCRETE 1. ALL SHOTCRETE AND WORKMANSHIP TO AS3600 2. UNO, TYPICALLY 75 THK, SL72 MESH CENTRAL, 32MPa FIBRECRETE 1. PROVIDE FIBRE CRETE SPRAY TO NOTED RETAINING WALL FACES 2. TBA EXCAVATION THE EARTHWORKS CONTRACTOR IS TO ENSURE THAT ALL DUE CARE IS TAKEN WHEN EXCAVATING ADJACENT TO THE MICROPILED WALL SO THAT THE CHS/ INTERMEDIATE GROUT COLUMNS ARE NOT DAMAGED DURING EXCAVATION. MAX EXCAVATION LEVELS ARE AS NOTED ON THE DRAWINGS G) ~ SAFETY IN DESIGN- MAINTENACE 1 IT IS THE RESPONSIBILITY OF THE CLIENT TO: A. MAINTAIN ALL DRAINAGE SUCH THAT WATER IS DIRECTED AWAY FROM THE RETAINING WALLS B. CARRY OUT MONITORING PROGRAM AS BELOW RETAINING WALL MONITORING (CONSTRUCTION PHASE) 1, TOP WALL- UPON COMPLETION OF CONSTRUCTION OF THE CAPPING BEAM, AND PRIOR TO EXCAVATION, SURVEY PINS ARE TO BE INSTALLED AT 25m INTERVALS TO THE SIDE FACE OF THE CAPPING BEAM AND BASELINE MEASUREMENTS TAKEN. TRIGGER LEVELS FOR MONITORING ARE AS FOLLOWS:- i LATERAL MOVEMENT RED (AS A % OF DESIGN DEFL'N RECORDED AT SURVEY PINS ALARM YELLOW 50% 715% 100% 3. RESPONSES TO TRIGGER LEVELS:- ALARM- — INCREASE MONITORING FREQUENCY (ESPECIALLY DURING WET SEASON) AND NOTIFY DESIGNER YELLOW- — PLAN MITIGATION WORKS REASSESS WALL AT LOCATION OF MOVEMENT AND REVISE TRIGGER LEVELS AS APPROPRIATE RED- IMPLEMENT PLANNED MOVEMENT MITIGATION WORKS, SUBJECT TO REASSESSMENT OF TRIGGER LEVELS 4. FREQUENCY OF MONITORING A. DURING CONSTRUCTION STAGE:- WEEKLY UNTIL PRACTICAL COMPLETION (OR FOLLOWING SIGNIFICANT WEATHER EVENT)* B. POST CONSTRUCTION:- MONTHLY FOR 12 MONTHS AFTER PCA PRACTICAL COMPLETION; YEARLY THEREAFTER (OR FOLLOWING SIGNIFICANT WEATHER EVENT)* *- DEFINED AsGsmnRAnrats IN 24 HOURS OR LESS AND/ OR SUSTAINED RAINFALL 2. ALLREINFORCEMENT TO BE ACRS CERTIFIED PENDING) 3. EXPOSURE CLASSIFICATION: B2 4. COVER TO REINFORCEMENT SHALL BE:- BOTTOM 60 (CAST AGAINST GROUND) 9. NOTING SECTION 5.0 OF THE GEOTECHNICAL REPORT, NO GROUNDWATER TOP/ SIDES 50 (FORMED) HAS BEEN INCLUDED IN THE DESIGN. THE MICROPILE WALLS ARE ‘WET’ 5. MIN LAP LENGTHS (UNO) WALLS. THE DESIGN ASSUMES A FREE DRAINING RETAINED MATERIAL, AND BAR 12 16 20 24 28 32 THE INSTALLATION OF DRAINAGE TO ALLEVIATE HYDROSTATIC PRESSURE. LAP 300 400 500 600 700 850 MIN LAP LENGTHS (TOP/ SIDE BARS) BAR 12 16 20 24 28 32 LAP 375 500 625 750 950 1050 DESIGN PARAMETERS- FOUNDATION PILES 6. WHERE NOMINATED, REINFORCEMENT/ DOWELS TO BE HOT DIPPED GALVANISED TO AS/NZS 4680 1, THE FOUNDATION MICROPILES HAVE BEEN DESIGNED TO RESIST THE LOADS NOMINATED ON TOD CONSULTING ENGINEERS DRAWINGS JOB no. 14517, DRG no's:- REINFORCED CONCRETE OP22 B, OP25 B, OP29 B, OP30 B, S1 B, S2 B, S4.B, S10 B 1, ALL CONCRETE AND WORKMANSHIP TO AS3600 2. CAPPING BEAM CONCRETE TO BE N40/20 3. BLINDING CONCRETE TO BE N25/20 4. ALLEXPOSED EDGES TO HAVE 25 CHAMFER UNO. 5. CONCRETE COMPRESSIVE STRENGTH TESTS TO BE CARRIED OUT IN ACCORDANCE WITH AS 1012. CLIENT: DESIGNED: KW PROJECT:- TITLE- NOTES HUTCHINSON DRAWN: KW 71 SEAVIEW TERRACE BUILDERS caeckeo= __AlH SUNSHINE BEACH SIGNED:- Le DRAWING NUMBER:- 10890- P100 A A_|_ASNOTED 5/08/2016 MM GROUND ENGINEERING, meee ud STATUS: = mfp DATE: }2 ok CO-ORDINATION ~ ¢
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
VERTICAL MICROPILE (CENTRAL TO CHS) AND RAKED (30° OFF VERTICAL) MICROPILE: 40/20 x 12m LONG UNO [ens StEEVE WALL] Size Lm) | cc (rmm)| A 114 x 6+ 4 1200 89x55 4 A 4in LONG GROUT COLUMNS | WALL [cissuceve SIZE Um) [ec (ram) B wesx7.1 | 4.5 | 1200 4.5m LONG GROUT COLUMNS JOIN LIN Tob 2 S515 y ToB 51.59 EGly — = a ; 510 i a A ra ay § S 50.0 / / f Fst 49.5) } 49.0 Rl 4 43.0 < 47.0 46.0 | TOP WALL ELEVATION q | dq | | | | | A | B ho | 2 | oo oe a | ao 2 3 "Okt e # tal +" t * ie ssa fl ¢ — <= -—# ‘fal & Wee Pe RL SLR SIR Pe BRL ROR BRAT eM eo Oe eg os . See Seco esp tll wa ae - erent “ NO = —— — = os 7 a a ae d _ - OO re Fs 5 ane if PLAN CLIENT:- DESIGNED:- KW PROJECT:- TITLE TOP WALL HUTCHINSON DRAWN: KW 71 SEAVIEW TERRACE GR ND i cHEoKEDs __ AN SUNSHINE BEACH . GENERAL 22/07/201€ BUILDERS SIGNED: Ce DRAWING NUMBER: 10890- P201 B GENERAL 06/07/201€ GROU INEERING — 646 a 17/06/2! : "i Lae 016 MMM GROUND EM a WIT 2k srs CO-ORDINATION 7
Page 3
ToB FALL 1:50
v ie
CHS SLEEVE
WALL Size | _Lim) | ce (mm)
c 168 x 7.1 6 800 |
5m LONG GROUT COLUMNS
ToB FALL 1:50
v
CHS SLEEVE
WALL| SIZE t{m) [ce (mm) WALL
Db 168 x 7.1% 6 600 E
114 x6 6
[_cissteeve
| Size Um) [ce (mm)
168 x 7.1+ 6 600
il4xG 6
Gm LONG GROUT Ct
OLUMNS 6995 END OF FINISHED STRUCTURE
Seon
ToB FALL 1:50
v
= UR >
me
6m LONG GROUT COLUMNS
___ CHS SLEEVE
WALL] SIZE] L(en) | cc (ram)
| F [a6 x74 6 800)
5m LONG GROUT COLUMNS
CUENT:-
HUTCHINSON
BUILDERS
DESIGNED:- KW
DRAWN:- KW
CHECKED:-
PCA
AJL
(ere
PROJECT:-
71 SEAVIEW TERRACE
SUNSHINE BEACH
Time — TOP WALL
PLAN AND ELEVATION
SHEET 2 OF 2
B |GENERAL 22/07/2016 SIGNED: 2 DRAWING NUMBER: 10890- P202 B
A_| GENERAL 06/07/2016 RPEQ:- A6
=| 17/06/2016 MMM GROUND ENGINEERING. 3 STATUS:
x ~/f— DATE: 14 JELf€ CO-ORDINATION
ef
Page 4
750,
z
~ eff J] vecorative stock watt (By OTHERS) l | ffl JL pecorative stock Watt (ey OTHERS) 5
ia] | i | |_|
« BLOCK WALL/ STARTERS (BY OTHERS) di ‘ BLOCK WALL/ STARTERS (BY OTHERS)
t
4N20 TOP/ BTM, 1120 SIDE FACE, A -]
e745) 1112-200 LIGS
gly 4N20 TOP/ BTM, 1N20 SIDE FACE,
Fel + 1112-400 L BARS (TYP) 179 112-200 LIGs
S| aH gs “ a ‘J
| SSO UONG ENCE TRAY 8 ey ct tt N22-400 VRAIS: (TVR) = | s+ 7g¢]4N20 TOP/ BTM, 1N20 SIDE FACE,
lina <{-40/ 20 HOLLOW BAR MICROPILE CENTRAL \ iS} 8 5 1112-200 LIGS
638 \ | NY aT '
§ = z | SLEEVED MICRO PILE- REFER TABLE ie + <{-40/ 20 HOLLOW BAR MICROPILE CENTRAL | ; by | ah
| 8 g
gE S Se See . =i is iS SLEEVED MICRO PILE- REFER TABLE | | A DToc
S es . i
oes 40/ 20 HOLLOW BAR RAKED Micropite —| ——— \ | 4 \ Aa ne aU SOTFIBED TO CHS
oo eg : _ GROUT COLUMN —— 3 1 1 -
exe Hiner eee onennceran 40/ 20 HOLLOW! BAR RAKED MICROPILE By 4, Y {| 125 THICK SHOTCRETE, MESH CENTRAL
a COLUMN — FSKECRES — y yak | |
8 L L i
x 25 DIA DRILLED HOLE FOR 20dia PVC \_ Mt ie
5 CONDUIT THRU GROUT COLUIH AT al \ 1] | [-— SLEEVED Micro PILE- REFER TABLE
FUTURE Ime (1¥P) FuTURE - S| rurune | 5
HANEWAY DRIVEWAY Rn) i3}— oriveway GROUT COLUMN
stan | staan | \ d see 40/ 20 HOLLOW BAR RAKED MICROPILE
Y if » Y
e a
= =
MAX BEL aB.75 MAX BEL 48.75 & s
fees v Z 8 8
8 g al
g & Z|
5 3 7
L °
Sit G 5
oz é «
=2 5
2 2
8 g Lt
MAX BELA7.8 MAX BELA7.8
Le WZ
SECTION A2- P201 4
(THRU GROUT COLUMN/ RAKED PILE) SECTION B2- P202 TURNAROUND AREA FSL 46.5 TURNAROUND AREA FSL46.5
(THRU GROUT COLUMN/ RAKED PILE) —— Nn NS
MAX BEL 462 MAX BEL 46.2
is
>
S'
SS
Ly
~
Ky
tale ee Oe
(J CG () 6 () SECTION B1- P202
Le A MSAD. SG BO) (THRU CHS PILE LOCATION)
SECTION A1- P201 600 600 600 \|
(THRU CHS PILE LOCATION) ¥ il
g y
y FN OIA IOI SECTION C2-P202
30 Q) th 0) Q Pai 00 Oo (THRU GROUT COLUMN/ RAKED PILE)
| 5; | — ggg 000. _]
SECTION C1- P202
(THRU CHS PILE LOCATION)
GROUT COLUMN CONFIGURATION
CLIENT: DESIGNED:- KW PROJECT: TITLE- TOP WALL
HUTCHINSON LY) A DRAWN:- KW 71 SEAVIEW TERRACE CROSS SECTIONS
CHECKED:- AJH
BUILDERS SIGNED:- ae a eens DRAWING NUMBER:- 10890- P301-A
wea 4, r 46
GENERAL av eas A GROUND ENGINEERING Ua —_—_ 2083 Jee STATUS:- CO-GROTIATION
fede
Used in these records
PCA Plans.pdfRelated documentApplication case desk ↗
PCA Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.