200917 La Mer Working Drawings - Rev #
Work in Progress
rev date issued details
client sign-off: date: Working Drawings
#-
WI 20.09.17 MS Working Drawings Rev#
P
legend
BAL# balustrade type
DR# drain type
FFL# finished floor level
FLF# floor finish type
HWD# timber type
MSC# miscellaneous item
MTL# metalwork type
REN# render finish
RET# retaining wall
SHR# shower
STA# stair type
T# tile type
FHR# fire hose reel A B
refer to Materials and Finishes Schedule 1.2.1 24,015
and onwards for further detail/specs
NOTE: all structural elements; including all
slabs, columns, beams, footings and
framing; to be in accordance with structural
engineer's design and detail.
boundary line at section b
boundary line at section b
C D E F
1,902 11,360 1,880
new boundary wall
extension
RL 6,445 level 2 BAL02
REN02 BAL01 BAL01 BAL01
620
REN02
RL 5,470 pool level 1
2,895
2,785
REN01
380
REN01
new spa- as per pool-01
1,585
POOL-01
in schedules
RL 3,885 new proposed path level
45
RL 3,490 ground level
existing wall foundation-
height to be confirmed
on site
key plan 1:500
a: shop 5, 212 david low way, peregian beach, qld 4573
p: (07) 5471 3033 Alterations and Additions Scale 1:100
sparks architects www.sparksarchitects.com
37 Hastings Street, Noosa Heads La Mer Body Corporate 141 MS Section B WD 3.2
sparks architects pty. ltd. abn 89 124 611 721
qld architect's registration No. 3974 project client job no. drawn drawing dwg no.
GSPublisherVersion 166.6.74.18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.